That's what I am assuming, but I am not positive.Ben wrote:Are those access points for the giant storm water tunnel they're building along the riverfront, as part of the sewer separation project?
If those are permanent, that further complicates an already crowded site plan. Rail tracks, an OPPD substation, now 2 access points for the storm sewer, never mind the concrete river levy system... Plus, some tough street access.
I think if the big tanks are removed, the access back where will be. Leavenworth Street will dead end right in to the old building.