Bob Kerrey Pedestrian Bridge (Part Two)

Downtown, Midtown, and all parts east of 72nd.
User avatar
skinzfan23
City Council
Posts: 11629
Joined: Mon Feb 09, 2004 11:26 am
Location: Omaha/Bellevue

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by skinzfan23 »

With the announcement of the streetcar on 10th St, I would think that would only help to make this come to fruition to have a connector to the Bob.
omahahawk
Parks & Recreation
Posts: 1187
Joined: Mon Dec 13, 2004 5:16 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by omahahawk »

It is supposed to be completed by Summer 2023 which I believe is the approximate timeline for completion of L and C landing so I imagine construction would begin this summer or no later than fall.
User avatar
Omaha Cowboy
The Don
Posts: 1013719
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Omaha Cowboy »

From today’s W-H-

“The North Downtown Riverfront Connector Bridge, also known as the "Baby Bob," will expand downtown Omaha’s iconic 3,000-foot pedestrian bridge. The project is meant to increase access between north downtown and the riverfront.

With City Council approval on Tuesday, the city will pay up to $235,411 to HNTB Corporation for design engineering services related to the project.

The North Downtown Riverfront Connector Bridge is planned to span Riverfront Drive and the Union Pacific Railroad tracks, connecting the 13-year-old Bob Kerrey Pedestrian Bridge to a point near the intersection of 10th and Mike Fahey Streets.

The “Baby Bob” Pedestrian Connector Bridge would connect major destinations in north downtown, including TD Ameritrade Park, the CHI Health Center and Creighton University, according to plans outlined by the City of Omaha.”..

The complete W-H story link:

https://omaha.com/news/local/govt-and-p ... the-latest

Ciao..LiO…Peace
Go Cowboys!
User avatar
skinzfan23
City Council
Posts: 11629
Joined: Mon Feb 09, 2004 11:26 am
Location: Omaha/Bellevue

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by skinzfan23 »

Good news to finally hear something on this.
User avatar
Omaha Cowboy
The Don
Posts: 1013719
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Omaha Cowboy »

skinzfan23 wrote: Wed Apr 06, 2022 8:36 am Good news to finally hear something on this.
Agreed. It’s been a long time coming..

Looks like we’re finally primed to get this constructed…

Ciao..LiO…Peace
Go Cowboys!
Athomsfere
Planning Board
Posts: 2300
Joined: Mon Sep 14, 2015 10:03 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Athomsfere »

I can't express how happy this makes me!

Soon, I dream of hopping on the trails in downtown or midtown, and having a non-stop bike and pedestrian first route to the river, through CB and back!
ita
County Board
Posts: 4746
Joined: Thu Jul 12, 2018 4:11 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by ita »

Omaha Cowboy wrote: Wed Apr 06, 2022 9:09 am
skinzfan23 wrote: Wed Apr 06, 2022 8:36 am Good news to finally hear something on this.
Agreed. It’s been a long time coming..

Looks like we’re finally primed to get this constructed…

Ciao..LiO…Peace
I wonder if the City is able to start this year? This can't come soon enough. I am happy about the progress though. Let's see how the final design turns out.
Athomsfere
Planning Board
Posts: 2300
Joined: Mon Sep 14, 2015 10:03 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Athomsfere »

ita wrote: Wed Apr 06, 2022 10:10 am
Omaha Cowboy wrote: Wed Apr 06, 2022 9:09 am
skinzfan23 wrote: Wed Apr 06, 2022 8:36 am Good news to finally hear something on this.
Agreed. It’s been a long time coming..

Looks like we’re finally primed to get this constructed…

Ciao..LiO…Peace
I wonder if the City is able to start this year? This can't come soon enough. I am happy about the progress though. Let's see how the final design turns out.
HNTB's Tilikum Crossing looks like a great comparison. Scale it down for Omaha's requirements (Street car, bikes and ped).

It's cable stayed, which I don't know why I want a cable stayed bridge here... and complements the Bob well.

HNBT says the completed on time and under budget for "tight schedule", but it took over 4 years. Being the same company as the one who built the Bob though... I'd say whatever the experience was there, we can expect more.
TransitOriented
Library Board
Posts: 379
Joined: Wed Nov 17, 2021 8:55 am

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by TransitOriented »

I'm assuming it's just going to be a no-frills bridge with extremely minimal decorative bits. Has anyone seen anything that points to it being "pretty"?
Athomsfere
Planning Board
Posts: 2300
Joined: Mon Sep 14, 2015 10:03 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Athomsfere »

TransitOriented wrote: Wed Apr 06, 2022 12:13 pm I'm assuming it's just going to be a no-frills bridge with extremely minimal decorative bits. Has anyone seen anything that points to it being "pretty"?
For whatever reason, I was mixing the baby bob and the new bridge up.

Yes, the baby bob is probably less interesting design wise.
User avatar
Omaha Cowboy
The Don
Posts: 1013719
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Omaha Cowboy »

ita wrote: Wed Apr 06, 2022 10:10 am
Omaha Cowboy wrote: Wed Apr 06, 2022 9:09 am
skinzfan23 wrote: Wed Apr 06, 2022 8:36 am Good news to finally hear something on this.
Agreed. It’s been a long time coming..

Looks like we’re finally primed to get this constructed…

Ciao..LiO…Peace
I wonder if the City is able to start this year? This can't come soon enough. I am happy about the progress though. Let's see how the final design turns out.
I’d love it see it this year, but I suspect construction might not start until 2023..No doubt, it can’t come soon enough…

Ciao..LiO…Peace
Go Cowboys!
User avatar
Busguy2010
City Council
Posts: 7328
Joined: Sat Apr 09, 2011 7:32 pm
Location: North Central Omaha

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Busguy2010 »

I do wish Baby Bob was part of the original design process, but I won't complain. Any Baby Bob at all is better than nothing.
User avatar
skinzfan23
City Council
Posts: 11629
Joined: Mon Feb 09, 2004 11:26 am
Location: Omaha/Bellevue

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by skinzfan23 »

Here are the renderings that were posted from last year:

Image

Image

Probably going to be very similar in style to the MLK bridge just to the south over the railroad tracks.
omahahawk
Parks & Recreation
Posts: 1187
Joined: Mon Dec 13, 2004 5:16 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by omahahawk »

The fact that HNTB Corporation designed the original pedestrian bridge bodes very well for this project as they were originally chosen for their ability to bring in a good design on budget. They succeeded very well and I fully expect this new design to be far more than utilitarian. Having experience with the original project and a proven track record I am sure the design of the Baby Bob will be very complimentary to the original structure. Can't wait for this. It will be great when catching the streetcar at 10th and Cass.
User avatar
Coyote
City Council
Posts: 34366
Joined: Tue Nov 18, 2003 11:18 am
Location: Aksarben Village

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Coyote »

'Baby Bob' extension bridge will connect riverfront to north downtown Omaha



Bike advocates say they're excited for the bridge extension project to finally move forward, saying it'll make Omaha more accessible and welcoming.
GetUrban
Planning Board
Posts: 2648
Joined: Sun Nov 23, 2008 3:07 pm
Location: Omaha

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by GetUrban »

omahahawk wrote: Wed Apr 06, 2022 5:12 pm The fact that HNTB Corporation designed the original pedestrian bridge bodes very well for this project as they were originally chosen for their ability to bring in a good design on budget. They succeeded very well and I fully expect this new design to be far more than utilitarian. Having experience with the original project and a proven track record I am sure the design of the Baby Bob will be very complimentary to the original structure. Can't wait for this. It will be great when catching the streetcar at 10th and Cass.
I agree that HNTB did a good job adapting the original Figg/BVH design to get it done on budget. The original Figg/BVH design did have the “Bob” connector as a bid alternate, but unfortunately bids came in 3 times the original $23 million budget, even without the bob alternate. HNTB won the second design-build effort by reducing the deck width to 15’ from 20’ and straightening-out the “S” currve a bit and building it out of steel instead of the original cast-in-place concrete. But we’re very lucky they were able adapt the original design.
He said "They are some big, ugly red brick buildings"
...and then they were gone.
ita
County Board
Posts: 4746
Joined: Thu Jul 12, 2018 4:11 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by ita »

Athomsfere wrote: Wed Apr 06, 2022 12:31 pm
TransitOriented wrote: Wed Apr 06, 2022 12:13 pm I'm assuming it's just going to be a no-frills bridge with extremely minimal decorative bits. Has anyone seen anything that points to it being "pretty"?
For whatever reason, I was mixing the baby bob and the new bridge up.

Yes, the baby bob is probably less interesting design wise.
What do you think of the Haymarket pedestrian bridge in Lincoln? Utilitarian, but serves as a place marker and has some nicely designed lighting and seating. Something like that I would personally be happy with for Baby Bob. Also, our most recent bridge spanning the highway between Creighton and the Atlas has decent design as well.
Last edited by ita on Wed Apr 13, 2022 2:15 pm, edited 1 time in total.
User avatar
Coyote
City Council
Posts: 34366
Joined: Tue Nov 18, 2003 11:18 am
Location: Aksarben Village

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Coyote »

Utilitarian, special, especially for those that are taking advantage of the highlights in the areas. More info coming into there?
Stan
Library Board
Posts: 461
Joined: Thu Apr 09, 2020 8:55 am

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Stan »

This seems like a no brainer to build. There is the other pedestrian bridge from the south of CHI Health Center, but this will open up the ballpark and shops in north downtown to the illuminarium and Bob Kerrey Bridge better.
Athomsfere
Planning Board
Posts: 2300
Joined: Mon Sep 14, 2015 10:03 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Athomsfere »

ita wrote: Wed Apr 13, 2022 1:58 pm
Athomsfere wrote: Wed Apr 06, 2022 12:31 pm
TransitOriented wrote: Wed Apr 06, 2022 12:13 pm I'm assuming it's just going to be a no-frills bridge with extremely minimal decorative bits. Has anyone seen anything that points to it being "pretty"?
For whatever reason, I was mixing the baby bob and the new bridge up.

Yes, the baby bob is probably less interesting design wise.
What do you think of the Haymarket pedestrian bridge in Lincoln? Utilitarian, but serves as a place marker and has some nicely designed lighting and seating. Something like that I would personally be happy with for Baby Bob. Also, our most recent bridge spanning the highway between Creighton and the Atlas has decent design as well.
Yes, those two are very similar!

I've never used that bridge in the Haymarket. It looks perfect for what it is to me though. A nice way to get off the street level, and get a little shade across a sea of parking, a railway, and a busy-ish street.
ItsAllAboutMe
Human Relations
Posts: 962
Joined: Tue Nov 16, 2004 6:14 am

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by ItsAllAboutMe »

I noticed a substantial amount of utility flags and markings where the baby bob will be built. Hope to see construction start this year.
djc311
Planning Board
Posts: 2139
Joined: Tue Mar 09, 2004 10:44 pm
Location: Omaha

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by djc311 »

Are they doing anything to the existing bridge given the suicide from last weekend?
User avatar
Omaha Cowboy
The Don
Posts: 1013719
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Omaha Cowboy »

ItsAllAboutMe wrote: Fri Jul 15, 2022 7:50 am I noticed a substantial amount of utility flags and markings where the baby bob will be built. Hope to see construction start this year.
Let’s hope so. It’s been long awaited…

Ciao..LiO…Peace
Go Cowboys!
ita
County Board
Posts: 4746
Joined: Thu Jul 12, 2018 4:11 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by ita »

Omaha Cowboy wrote: Fri Jul 15, 2022 8:38 am
ItsAllAboutMe wrote: Fri Jul 15, 2022 7:50 am I noticed a substantial amount of utility flags and markings where the baby bob will be built. Hope to see construction start this year.
Let’s hope so. It’s been long awaited…

Ciao..LiO…Peace
I am with you. Please let this be a sign construction is finally going to start.
MetcalfeHarrison
Home Owners Association
Posts: 82
Joined: Fri Jul 15, 2022 1:19 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by MetcalfeHarrison »

ita wrote: Fri Jul 15, 2022 8:58 am
Omaha Cowboy wrote: Fri Jul 15, 2022 8:38 am
ItsAllAboutMe wrote: Fri Jul 15, 2022 7:50 am I noticed a substantial amount of utility flags and markings where the baby bob will be built. Hope to see construction start this year.
Let’s hope so. It’s been long awaited…

Ciao..LiO…Peace
I am with you. Please let this be a sign construction is finally going to start.
I think it is planned for bidding in December, so construction looks to start early 2023. I heard there were some issues with the initial design and the railroad so everything was pushed back a year. Some more info in the Keep Omaha Moving link below.

N. Downtown Riverfront Pedestrian Bridge
ita
County Board
Posts: 4746
Joined: Thu Jul 12, 2018 4:11 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by ita »

MetcalfeHarrison wrote: Fri Jul 15, 2022 1:22 pm
ita wrote: Fri Jul 15, 2022 8:58 am
Omaha Cowboy wrote: Fri Jul 15, 2022 8:38 am
ItsAllAboutMe wrote: Fri Jul 15, 2022 7:50 am I noticed a substantial amount of utility flags and markings where the baby bob will be built. Hope to see construction start this year.
Let’s hope so. It’s been long awaited…

Ciao..LiO…Peace
I am with you. Please let this be a sign construction is finally going to start.
I think it is planned for bidding in December, so construction looks to start early 2023. I heard there were some issues with the initial design and the railroad so everything was pushed back a year. Some more info in the Keep Omaha Moving link below.

N. Downtown Riverfront Pedestrian Bridge
Nice, I wasn't keeping track of this page. Thanks for the information.

Edit: this is a bit off topic, but looking at the rendering of BKB Jr. and seeing Lot D in the foreground, has there been any previous discussions or talks about developing that surface lot? I know Lot B and even Lot A have received a lot of public and governmental interest, but what about Lot D?
Last edited by ita on Fri Jul 15, 2022 2:27 pm, edited 1 time in total.
User avatar
Omaha Cowboy
The Don
Posts: 1013719
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Omaha Cowboy »

ita wrote: Fri Jul 15, 2022 1:46 pm
MetcalfeHarrison wrote: Fri Jul 15, 2022 1:22 pm
ita wrote: Fri Jul 15, 2022 8:58 am
Omaha Cowboy wrote: Fri Jul 15, 2022 8:38 am
ItsAllAboutMe wrote: Fri Jul 15, 2022 7:50 am I noticed a substantial amount of utility flags and markings where the baby bob will be built. Hope to see construction start this year.
Let’s hope so. It’s been long awaited…

Ciao..LiO…Peace
I am with you. Please let this be a sign construction is finally going to start.
I think it is planned for bidding in December, so construction looks to start early 2023. I heard there were some issues with the initial design and the railroad so everything was pushed back a year. Some more info in the Keep Omaha Moving link below.

N. Downtown Riverfront Pedestrian Bridge
Nice, I wasn't keeping track of this page. Thanks for the information.
This link indicates construction could start in 2023-2024. Nothing more specific than that. Let’s hope that start date is earlier rather than later. We’ve been talking about the “Baby Bob” for nearly a decade now…

Ciao..LiO…Peace
Go Cowboys!
User avatar
Coyote
City Council
Posts: 34366
Joined: Tue Nov 18, 2003 11:18 am
Location: Aksarben Village

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Coyote »

Image

Image
User avatar
Uffda
County Board
Posts: 4621
Joined: Sun Jun 12, 2005 9:52 pm
Location: Land o Lakes, FL

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Uffda »

Maybe it’s just the drawing but looks like a weird connection to the existing bridge. It looks in the drawing that they were ‘off’ in measurements so just made a connection from one bridge to the other instead of having a more merging line between the two.


Image
We are the people our parents warned us about.

Jimmy Buffett
User avatar
Brad
Photographer
Posts: 1036562
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Brad »

Uffda wrote: Sun Jul 17, 2022 11:55 am Maybe it’s just the drawing but looks like a weird connection to the existing bridge. It looks in the drawing that they were ‘off’ in measurements so just made a connection from one bridge to the other instead of having a more merging line between the two.
The way they build the original bridge approach, this is probably the best way to connect the two without closing the original/main bridge. They used the interlocking blocks for the approach and would probably need to close the bridge, removed the concrete trail, rebuild the wall, and then replace the concrete trail. While the new design isn't the best for bike riders moving at a decent speed, its probably the most practical.
Athomsfere
Planning Board
Posts: 2300
Joined: Mon Sep 14, 2015 10:03 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Athomsfere »

Brad wrote: Sun Jul 17, 2022 12:14 pm
Uffda wrote: Sun Jul 17, 2022 11:55 am Maybe it’s just the drawing but looks like a weird connection to the existing bridge. It looks in the drawing that they were ‘off’ in measurements so just made a connection from one bridge to the other instead of having a more merging line between the two.
The way they build the original bridge approach, this is probably the best way to connect the two without closing the original/main bridge. They used the interlocking blocks for the approach and would probably need to close the bridge, removed the concrete trail, rebuild the wall, and then replace the concrete trail. While the new design isn't the best for bike riders moving at a decent speed, its probably the most practical.
It might be the best for bikers too. It forces paying a little attention to bridge traffic before merging or disembarking the Bob for the baby Bob.
User avatar
Greg S
City Council
Posts: 8991
Joined: Thu Aug 26, 2004 10:46 am

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Greg S »

Which gets done first, CrossRoads or Baby Bob?
ita
County Board
Posts: 4746
Joined: Thu Jul 12, 2018 4:11 pm

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by ita »

Greg S wrote: Mon Jul 18, 2022 8:54 am Which gets done first, CrossRoads or Baby Bob?
Hahaha, I am putting my money on Baby Bob!
nebport5
Planning Board
Posts: 2803
Joined: Sun Jun 06, 2004 3:13 pm
Location: 68102

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by nebport5 »

Brad wrote: Sun Jul 17, 2022 12:14 pm
Uffda wrote: Sun Jul 17, 2022 11:55 am Maybe it’s just the drawing but looks like a weird connection to the existing bridge. It looks in the drawing that they were ‘off’ in measurements so just made a connection from one bridge to the other instead of having a more merging line between the two.
The way they build the original bridge approach, this is probably the best way to connect the two without closing the original/main bridge. They used the interlocking blocks for the approach and would probably need to close the bridge, removed the concrete trail, rebuild the wall, and then replace the concrete trail. While the new design isn't the best for bike riders moving at a decent speed, its probably the most practical.

That all makes sense except the "Big Bob" was built with aesthetics in mind and this "Little Bob" rendering while functional actually detracts from "Big Bob's" aesthetics. The point of this second bridge is getting pedestrians over the train tracks. You could terminate this bridge at or before the last support beam and let the path naturally segue under "Big Bob" into the existing curved path and it would look a helluva lot better.
User avatar
Brad
Photographer
Posts: 1036562
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Brad »

I was thinking about something else. The might be limited on where they can tie in for grading and ADA. If they are high enough in the parking lane for a bus to get through, may be they can't ramp down to tie in anywhere else and still make ADA grades. No way to tell without seeing the a profile.
render_cam_floatview_south_2-21-2016-fnl.jpg
You do not have the required permissions to view the files attached to this post.
User avatar
Omaha Cowboy
The Don
Posts: 1013719
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Omaha Cowboy »

Greg S wrote: Mon Jul 18, 2022 8:54 am Which gets done first, CrossRoads or Baby Bob?
That’s, honestly, a tough call..

If both get done within the next 3 years, I’ll be happy…

Ciao..LiO…Peace
Go Cowboys!
User avatar
Busguy2010
City Council
Posts: 7328
Joined: Sat Apr 09, 2011 7:32 pm
Location: North Central Omaha

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by Busguy2010 »

Omaha Cowboy wrote: Mon Jul 18, 2022 9:25 pm
Greg S wrote: Mon Jul 18, 2022 8:54 am Which gets done first, CrossRoads or Baby Bob?
That’s, honestly, a tough call..

If both get done within the next 3 years, I’ll be happy…

Ciao..LiO…Peace
I think the better question is which starts first... Crossroads may realistically be on an Aksarben Village type schedule, as in each building may be constructed successively, not concurrently. I think it could easily be the end of the decade before we really have an established development at Crossroads.

To answer your question specifically, the Baby Bob will most definitely be done first.
nebport5
Planning Board
Posts: 2803
Joined: Sun Jun 06, 2004 3:13 pm
Location: 68102

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by nebport5 »

Brad wrote: Mon Jul 18, 2022 8:57 pm I was thinking about something else. The might be limited on where they can tie in for grading and ADA. If they are high enough in the parking lane for a bus to get through, may be they can't ramp down to tie in anywhere else and still make ADA grades. No way to tell without seeing the a profile.

render_cam_floatview_south_2-21-2016-fnl.jpg
Good points. I can't speak to the grading but I'd imagine if the curve of the bridge along your ellipticals was reversed the ramp angle shouldn't be a problem for ADA.
User avatar
nativeomahan
County Board
Posts: 6013
Joined: Fri Nov 12, 2004 2:46 pm
Location: Omaha and Puerto Vallarta

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by nativeomahan »

ita wrote: Mon Jul 18, 2022 9:43 am
Greg S wrote: Mon Jul 18, 2022 8:54 am Which gets done first, CrossRoads or Baby Bob?
Hahaha, I am putting my money on Baby Bob!
And the Mutual building.
User avatar
mcarch
Library Board
Posts: 418
Joined: Fri Jun 15, 2007 1:44 pm
Location: Elkhorn

Re: Bob Kerrey Pedestrian Bridge (Part Two)

Post by mcarch »

A long time ago, there was a proposed plan to build a cover over the railroad tracks and Arena/Convention Center Loading Docs from the (what was) Qwest Center. If that was done, this would not have been needed, plus that would have made this entire area more connected.
mcarch