Re: Omaha Streetcar Discussion

Post by thenewguy »

EricHaley wrote: Tue Nov 07, 2023 2:13 pm
Garrett wrote: Tue Nov 07, 2023 1:51 pm
skinzfan23 wrote: Tue Nov 07, 2023 1:49 pm
EricHaley wrote: Tue Nov 07, 2023 1:35 pm
Garrett wrote: Tue Nov 07, 2023 1:33 pm
EricHaley wrote: Tue Nov 07, 2023 1:31 pm
almighty_tuna wrote: Tue Nov 07, 2023 1:27 pm
skinzfan23 wrote: Tue Nov 07, 2023 1:09 pm Is the streetcar route ending just west of 39th and Farnam? I thought it was going to 42nd st. On pg 7 there is a rending of a charging area for the streetcar, and I don't see any tracks extending further west.
I don't remember where I read it today, but the updated design now ends at 39th & Farnam to allow UNMC to review its ultimate extension through their campus to the innovation center.
It was mentioned in the news conference. Also, it will only go to Capitol on the east end.

There was also mention of possible expansions to North O, which they're seeking a $300k federal grant to study, possibly followed by an airport extensions.
Does that mean it won’t go up Cass along 10th anymore either?
That was my understanding from the news conference.
I would be ok with that b/c I was wondering how it would work with the streetcar, pedestrian and vehicle traffic during major events right near the Hilton. Stopping at Capitol still gets you within 2-3 blocks of CHI main entrance and Schwab Field.
It’s definitely not the worst change. No need for the stub for now if they’re looking to cut some costs.
I also imagine MECA had objections after spending all that time and money installing bollards.
looks great...but I still don't see how they are going to get it done in a few years.
Go Cubs Go
User avatar
Garrett
County Board
Posts: 4629
Joined: Wed Nov 26, 2008 6:29 pm
Location: New York City

Re: Omaha Streetcar Discussion

Post by Garrett »

thenewguy wrote: Tue Nov 07, 2023 2:20 pm
EricHaley wrote: Tue Nov 07, 2023 2:13 pm
Garrett wrote: Tue Nov 07, 2023 1:51 pm
skinzfan23 wrote: Tue Nov 07, 2023 1:49 pm
EricHaley wrote: Tue Nov 07, 2023 1:35 pm
Garrett wrote: Tue Nov 07, 2023 1:33 pm
EricHaley wrote: Tue Nov 07, 2023 1:31 pm
almighty_tuna wrote: Tue Nov 07, 2023 1:27 pm
skinzfan23 wrote: Tue Nov 07, 2023 1:09 pm Is the streetcar route ending just west of 39th and Farnam? I thought it was going to 42nd st. On pg 7 there is a rending of a charging area for the streetcar, and I don't see any tracks extending further west.
I don't remember where I read it today, but the updated design now ends at 39th & Farnam to allow UNMC to review its ultimate extension through their campus to the innovation center.
It was mentioned in the news conference. Also, it will only go to Capitol on the east end.

There was also mention of possible expansions to North O, which they're seeking a $300k federal grant to study, possibly followed by an airport extensions.
Does that mean it won’t go up Cass along 10th anymore either?
That was my understanding from the news conference.
I would be ok with that b/c I was wondering how it would work with the streetcar, pedestrian and vehicle traffic during major events right near the Hilton. Stopping at Capitol still gets you within 2-3 blocks of CHI main entrance and Schwab Field.
It’s definitely not the worst change. No need for the stub for now if they’re looking to cut some costs.
I also imagine MECA had objections after spending all that time and money installing bollards.
looks great...but I still don't see how they are going to get it done in a few years.
The timeline we’ve been presented in slightly slower than KC’s starter line. 2027 is very doable. Even 2026 was doable if everything went according to plan.
OMA-->CHI-->NYC
User avatar
thenewguy
County Board
Posts: 4288
Joined: Fri Oct 19, 2007 9:50 pm
Location: Council Bluffs

Re: Omaha Streetcar Discussion

Post by thenewguy »

Garrett wrote: Tue Nov 07, 2023 2:21 pm
thenewguy wrote: Tue Nov 07, 2023 2:20 pm
EricHaley wrote: Tue Nov 07, 2023 2:13 pm
Garrett wrote: Tue Nov 07, 2023 1:51 pm
skinzfan23 wrote: Tue Nov 07, 2023 1:49 pm
EricHaley wrote: Tue Nov 07, 2023 1:35 pm
Garrett wrote: Tue Nov 07, 2023 1:33 pm
EricHaley wrote: Tue Nov 07, 2023 1:31 pm
almighty_tuna wrote: Tue Nov 07, 2023 1:27 pm
skinzfan23 wrote: Tue Nov 07, 2023 1:09 pm Is the streetcar route ending just west of 39th and Farnam? I thought it was going to 42nd st. On pg 7 there is a rending of a charging area for the streetcar, and I don't see any tracks extending further west.
I don't remember where I read it today, but the updated design now ends at 39th & Farnam to allow UNMC to review its ultimate extension through their campus to the innovation center.
It was mentioned in the news conference. Also, it will only go to Capitol on the east end.

There was also mention of possible expansions to North O, which they're seeking a $300k federal grant to study, possibly followed by an airport extensions.
Does that mean it won’t go up Cass along 10th anymore either?
That was my understanding from the news conference.
I would be ok with that b/c I was wondering how it would work with the streetcar, pedestrian and vehicle traffic during major events right near the Hilton. Stopping at Capitol still gets you within 2-3 blocks of CHI main entrance and Schwab Field.
It’s definitely not the worst change. No need for the stub for now if they’re looking to cut some costs.
I also imagine MECA had objections after spending all that time and money installing bollards.
looks great...but I still don't see how they are going to get it done in a few years.
The timeline we’ve been presented in slightly slower than KC’s starter line. 2027 is very doable. Even 2026 was doable if everything went according to plan.
it feels a little like we should have the design nailed down by now in order to hit the 2027 target, right? Or is this all going to plan? Unless I'm grossly underestimating the time it will take to rebuild roads for the tracks. I mean maybe it is as simple as digging out only what you need to lay track, and then lay track, but it seems like they'd have to bolster the foundation a bit, right? I assume they are relatively heavy?
Go Cubs Go
ita
County Board
Posts: 4735
Joined: Thu Jul 12, 2018 4:11 pm

Re: Omaha Streetcar Discussion

Post by ita »

I am bummed if they got rid of the 10th street spur to CHI Health Center Convention Center. I know a 10th and Capitol stop is only .5 miles to Charles Schwab, but the original terminus would have brought the streetcar closer to millwork, builders, all the hotels in North downtown, baby bob and riverfront condos people. This seems like a major loss to me. Plus it would make it that much more likely to see Lot B developed.
User avatar
Garrett
County Board
Posts: 4629
Joined: Wed Nov 26, 2008 6:29 pm
Location: New York City

Re: Omaha Streetcar Discussion

Post by Garrett »

ita wrote: Tue Nov 07, 2023 2:42 pm I am bummed if they got rid of the 10th street spur to CHI Health Center Convention Center. I know a 10th and Capitol stop is only .5 miles to Charles Schwab, but the original terminus would have brought the streetcar closer to millwork, builders, all the hotels in North downtown, baby bob and riverfront condos people. This seems like a major loss to me. Plus it would make it that much more likely to see Lot B developed.
In the press conference they framed the removal of the spur as giving them more options to expand northwards in the future. Maybe, as others have noted, they were just less certain about the ability to get it up 10th.
OMA-->CHI-->NYC
User avatar
Coyote
City Council
Posts: 34366
Joined: Tue Nov 18, 2003 11:18 am
Location: Aksarben Village

Re: Omaha Streetcar Discussion

Post by Coyote »

Omaha Mayor, officials provide update on Omaha Streetcar



Omaha Mayor Jean Stothert and officials provided update on the Omaha Streetcar Project after the design phases passed 30% completion.
Jins123
Library Board
Posts: 266
Joined: Mon Sep 18, 2017 8:02 pm

Re: Omaha Streetcar Discussion

Post by Jins123 »

I hope they can incorporate the abandon bank building into an eventual stop for the med center. But am bummed to see no direct drop off at the arena or for the workforce at the med center, as of now
Dusty
Human Relations
Posts: 778
Joined: Wed May 25, 2011 10:53 pm
Location: Central Florida

Re: Omaha Streetcar Discussion

Post by Dusty »

I'm okay of scaling back the 10th extension to Cass and stopping at Capitol. They can always add an extension to Cass/Cuming later. But stopping the line at 39th St instead of 42nd St seems silly to me. I don't see how this is affecting the Med Center. Seems really strange having it stop right in the middle of Blackstone. What happens when they extend it? Tearing up 39th and Farnam again?

I do like the design of the shelters. Simple and easy to spot.
Omaha's Transit Future starts now. Let's make the change!
Omaha Transit Network
MetcalfeHarrison
Home Owners Association
Posts: 79
Joined: Fri Jul 15, 2022 1:19 pm

Re: Omaha Streetcar Discussion

Post by MetcalfeHarrison »

Yeah scaling back on both ends of the route kind of sucks, but it makes sense I guess with where they're at with the budget. I also thought they would be further along by now, I think KC started moving their utilities prior to the streetcar work so I'm worried about delays there. I would guess that the biggest cause of schedule issues on projects like this are utilities so hopefully they move beyond just potholing them soon.
GrowUpFrances
Home Owners Association
Posts: 86
Joined: Sun Jun 05, 2016 9:36 am

Re: Omaha Streetcar Discussion

Post by GrowUpFrances »

Glad it sounds like some of the stops will include ETA signage. It would be really nice if they could also include heating lamps to make the wait experience more bearable in winter months. Minneapolis and Chicago have them at some transit stops.
Louie
County Board
Posts: 4891
Joined: Fri Dec 23, 2011 4:23 pm
Location: Dundee

Re: Omaha Streetcar Discussion

Post by Louie »

GrowUpFrances wrote: Tue Nov 07, 2023 5:10 pm Glad it sounds like some of the stops will include ETA signage. It would be really nice if they could also include heating lamps to make the wait experience more bearable in winter months. Minneapolis and Chicago have them at some transit stops.
Ooh that would be nice
User avatar
Coyote
City Council
Posts: 34366
Joined: Tue Nov 18, 2003 11:18 am
Location: Aksarben Village

Re: Omaha Streetcar Discussion

Post by Coyote »

Omaha streetcar start and end locations could change



We've seen the map, heard about the process and even seen the city crews working along the route, now we have a first look at early designs of stops, power stations and more.
Dusty
Human Relations
Posts: 778
Joined: Wed May 25, 2011 10:53 pm
Location: Central Florida

Re: Omaha Streetcar Discussion

Post by Dusty »

EricHaley wrote: Tue Nov 07, 2023 1:31 pm There was also mention of possible expansions to North O, which they're seeking a $300k federal grant to study, possibly followed by an airport extensions.
IMO, they should not be spending money on an expansion study when they don't have the primary route built yet.
I have said before a streetcar is not the right mode to the airport. Way to slow. Passengers shouldn't be stressed about missing their flight because the streetcar moves too slow and keeps stopping. Streetcars are people movers meant to connect destinations or attractions.

If they were to add an extension the best route would be the 10th/13th Street corridor. You could connect: Pedestrian Bridge, Luminarium, Old Market, Durham Museum, Little Italy, Omaha Zoo and then back on 10th Street to Convention Center/Baseball Stadium.
Omaha's Transit Future starts now. Let's make the change!
Omaha Transit Network
User avatar
Busguy2010
City Council
Posts: 7268
Joined: Sat Apr 09, 2011 7:32 pm
Location: North Central Omaha

Re: Omaha Streetcar Discussion

Post by Busguy2010 »

Dusty wrote: Tue Nov 07, 2023 7:12 pm
EricHaley wrote: Tue Nov 07, 2023 1:31 pm There was also mention of possible expansions to North O, which they're seeking a $300k federal grant to study, possibly followed by an airport extensions.
IMO, they should not be spending money on an expansion study when they don't have the primary route built yet.
I have said before a streetcar is not the right mode to the airport. Way to slow. Passengers shouldn't be stressed about missing their flight because the streetcar moves too slow and keeps stopping. Streetcars are people movers meant to connect destinations or attractions.

If they were to add an extension the best route would be the 10th/13th Street corridor. You could connect: Pedestrian Bridge, Luminarium, Old Market, Durham Museum, Little Italy, Omaha Zoo and then back on 10th Street to Convention Center/Baseball Stadium.
Correct. I'm a little less excited about the streetcar than I used to be. I don't want to call it a novelty because it'll definitely serve its purpose, but let's not forget functionality. ORBT would be better to serve the airport than a streetcar, and ultimately light rail or commuter rail. I hope they don't lose perspective and make the streetcar the end all be all. As you said, streetcars are just too slow. We need to keep rapid transit on the table.
Athomsfere
Planning Board
Posts: 2300
Joined: Mon Sep 14, 2015 10:03 pm

Re: Omaha Streetcar Discussion

Post by Athomsfere »

Busguy2010 wrote: Tue Nov 07, 2023 7:56 pm
Dusty wrote: Tue Nov 07, 2023 7:12 pm
EricHaley wrote: Tue Nov 07, 2023 1:31 pm There was also mention of possible expansions to North O, which they're seeking a $300k federal grant to study, possibly followed by an airport extensions.
IMO, they should not be spending money on an expansion study when they don't have the primary route built yet.
I have said before a streetcar is not the right mode to the airport. Way to slow. Passengers shouldn't be stressed about missing their flight because the streetcar moves too slow and keeps stopping. Streetcars are people movers meant to connect destinations or attractions.

If they were to add an extension the best route would be the 10th/13th Street corridor. You could connect: Pedestrian Bridge, Luminarium, Old Market, Durham Museum, Little Italy, Omaha Zoo and then back on 10th Street to Convention Center/Baseball Stadium.
Correct. I'm a little less excited about the streetcar than I used to be. I don't want to call it a novelty because it'll definitely serve its purpose, but let's not forget functionality. ORBT would be better to serve the airport than a streetcar, and ultimately light rail or commuter rail. I hope they don't lose perspective and make the streetcar the end all be all. As you said, streetcars are just too slow. We need to keep rapid transit on the table.
The meetings I've gone to, they seem razor focused on that fact. Perhaps this is also dialing in expectations so the streetcar doesn't interfere with future streetcar routes and BRT/LRT options.

That seems very optimistic, but maybe.
User avatar
Garrett
County Board
Posts: 4629
Joined: Wed Nov 26, 2008 6:29 pm
Location: New York City

Re: Omaha Streetcar Discussion

Post by Garrett »

If I had to guess, UNMC’s changes to the Saddlecreek Campus and the now more uncertain future of Project NeXT probably influenced the change. Sounds like UNMC isn’t necessarily fully certain about a few pieces of their expansion plans and want more time to consider where to put the streetcar, as it seemed to be a big part of the early Admin Tower renderings. UNMC being on the hook for whatever extension they ask for seems to confirm it was them that asked for the change, not a cut by the streetcar authority.

Nixing the line north of Capitol also makes to me if they are indeed serious about a North O route. It would be silly to have a little stub run to just Cass street if they one day decide to run a line up 13th, for example.
OMA-->CHI-->NYC
User avatar
TheSeventhBrat
Home Owners Association
Posts: 214
Joined: Wed Dec 04, 2013 10:59 pm

Re: Omaha Streetcar Discussion

Post by TheSeventhBrat »

It's hard to tell, but will there be street parking on the southside of Farnam? I'm looking primarily at 26th Street.
User avatar
Coyote
City Council
Posts: 34366
Joined: Tue Nov 18, 2003 11:18 am
Location: Aksarben Village

Re: Omaha Streetcar Discussion

Post by Coyote »


City reveals design for Omaha's streetcar, plans for stations along the route




The first phase of Omaha's streetcar design is finished and includes plans for stations at the 16 stops along the route, as well as changes to the route to allow for future extension. The designs will be reviewed by the Urban Design Review Board this month, as required by city code. The city's planning department has reviewed the 30% designs and recommended approval.
strangerthings
Library Board
Posts: 431
Joined: Fri Jan 10, 2020 9:49 pm

Re: Omaha Streetcar Discussion

Post by strangerthings »

skinzfan23 wrote: Tue Nov 07, 2023 1:34 pm
Garrett wrote: Tue Nov 07, 2023 1:32 pm I like that they’re using island stations through MTC and Blackstone. Gives a lot more flexibility to possibly expand pedestrian space in the district. The 39th terminus feels like a blunder though. Giving UNMC more time to sort stuff out? Odd. I fail to see how ending at 42nd would hamper that.
Agree, I am not sure those businesses would want a streetcar sitting in front of their doors just charging.
KC will often park one at the end of the line. People like going up and taking their photos with it. Basically like the static train displays you see at Council Bluffs or in random Midwest towns.

Here is a sponsored car parked in the KC equivalent of the Omaha streetcar charging spot.
Image
GenX
Parks & Recreation
Posts: 1216
Joined: Thu Feb 04, 2016 8:16 pm
Location: Omaha

Re: Omaha Streetcar Discussion

Post by GenX »

Dusty wrote: Tue Nov 07, 2023 7:12 pm
EricHaley wrote: Tue Nov 07, 2023 1:31 pm There was also mention of possible expansions to North O, which they're seeking a $300k federal grant to study, possibly followed by an airport extensions.
IMO, they should not be spending money on an expansion study when they don't have the primary route built yet.
I have said before a streetcar is not the right mode to the airport. Way to slow. Passengers shouldn't be stressed about missing their flight because the streetcar moves too slow and keeps stopping. Streetcars are people movers meant to connect destinations or attractions.

If they were to add an extension the best route would be the 10th/13th Street corridor. You could connect: Pedestrian Bridge, Luminarium, Old Market, Durham Museum, Little Italy, Omaha Zoo and then back on 10th Street to Convention Center/Baseball Stadium.
They’re not spending the money, they’re being proactive in seeking the funds to explore future expansions. I don’t see how this is a negative. If you don’t agree, go to the meetings. Easy peesy.

How could you, or anyone, try and dictate where the streetcar should go when you have absolutely no knowledge or part of the decision?

Sorry, I’m ASD and a bit unnecessarily blunt with my statements sometimes.
Last edited by GenX on Wed Nov 08, 2023 3:03 am, edited 1 time in total.
GenX
Parks & Recreation
Posts: 1216
Joined: Thu Feb 04, 2016 8:16 pm
Location: Omaha

Re: Omaha Streetcar Discussion

Post by GenX »

TheSeventhBrat wrote: Tue Nov 07, 2023 10:12 pm
It's hard to tell, but will there be street parking on the southside of Farnam? I'm looking primarily at 26th Street.
I would expect street parking to be strictly limited along the route. They only have so much space to work with, and I imagine parking would be the first/easiest sacrifice.
User avatar
Coyote
City Council
Posts: 34366
Joined: Tue Nov 18, 2003 11:18 am
Location: Aksarben Village

Re: Omaha Streetcar Discussion

Post by Coyote »


Council Bluffs to begin streetcar study as Omaha presses forward




COUNCIL BLUFFS, Iowa — As we learned more about Omaha's streetcar Tuesday, there are plans in motion to get it moving across the river. Council Bluffs has been looking at a possible extension along First Avenue. As soon as December, the city will begin a study on how to make it happen and how much it'll cost. The mayor's chief of staff, Brandon Garrett, says there's a clear path for the streetcar in Council Bluffs. "For us in Council Bluffs, it's almost a no-brainer on where it should go," Garrett said. It'd run along what they call First Avenue. That's the trail just south of Broadway where the railroad used to sit.
Dusty
Human Relations
Posts: 778
Joined: Wed May 25, 2011 10:53 pm
Location: Central Florida

Re: Omaha Streetcar Discussion

Post by Dusty »

EricHaley wrote: Wed Nov 08, 2023 2:56 am
Dusty wrote: Tue Nov 07, 2023 7:12 pm
EricHaley wrote: Tue Nov 07, 2023 1:31 pm There was also mention of possible expansions to North O, which they're seeking a $300k federal grant to study, possibly followed by an airport extensions.
IMO, they should not be spending money on an expansion study when they don't have the primary route built yet.
I have said before a streetcar is not the right mode to the airport. Way to slow. Passengers shouldn't be stressed about missing their flight because the streetcar moves too slow and keeps stopping. Streetcars are people movers meant to connect destinations or attractions.

If they were to add an extension the best route would be the 10th/13th Street corridor. You could connect: Pedestrian Bridge, Luminarium, Old Market, Durham Museum, Little Italy, Omaha Zoo and then back on 10th Street to Convention Center/Baseball Stadium.
They’re not spending the money, they’re being proactive in seeking the funds to explore future expansions. I don’t see how this is a negative. If you don’t agree, go to the meetings. Easy peesy.

How could you, or anyone, try and dictate where the streetcar should go when you have absolutely no knowledge or part of the decision?

Sorry, I’m ASD and a bit unnecessarily blunt with my statements sometimes.
Not everyone can attend these meetings. Some have work schedule conflicts, personal obligations, or live in different states. You can still give your input through their website. And yes....ALL of our opinions matter! We are the passengers who will make it a success or a failure. So us giving them suggestions on route expansions is important. It tells them how to build the primary line so they can add lines WE want to ride.
Omaha's Transit Future starts now. Let's make the change!
Omaha Transit Network
User avatar
TheSeventhBrat
Home Owners Association
Posts: 214
Joined: Wed Dec 04, 2013 10:59 pm

Re: Omaha Streetcar Discussion

Post by TheSeventhBrat »

EricHaley wrote: Wed Nov 08, 2023 3:02 am
TheSeventhBrat wrote: Tue Nov 07, 2023 10:12 pm
It's hard to tell, but will there be street parking on the southside of Farnam? I'm looking primarily at 26th Street.
I would expect street parking to be strictly limited along the route. They only have so much space to work with, and I imagine parking would be the first/easiest sacrifice.
My office is directly across the street from the stop on 26th and Farnam. We have semis and large trucks loading and unloading in front of our warehouse on Farnam all day long. With the way the building is constructed, there isn't another option to load/unload trucks. I'm curious if we'll still be here in the next couple years.
ita
County Board
Posts: 4735
Joined: Thu Jul 12, 2018 4:11 pm

Re: Omaha Streetcar Discussion

Post by ita »

Coyote wrote: Wed Nov 08, 2023 6:32 am
Council Bluffs to begin streetcar study as Omaha presses forward




COUNCIL BLUFFS, Iowa — As we learned more about Omaha's streetcar Tuesday, there are plans in motion to get it moving across the river. Council Bluffs has been looking at a possible extension along First Avenue. As soon as December, the city will begin a study on how to make it happen and how much it'll cost. The mayor's chief of staff, Brandon Garrett, says there's a clear path for the streetcar in Council Bluffs. "For us in Council Bluffs, it's almost a no-brainer on where it should go," Garrett said. It'd run along what they call First Avenue. That's the trail just south of Broadway where the railroad used to sit.
Thanks for posting! Good to see CB moving forward. Study to begin as early as the end of this year with a 2025 completion date. It all hinges on that bridge. Really hoping they and Omaha can figure it out. Would be awesome to see the streetcar make edits way over the river by 2030, though since the bridge would be dependent on federal funds, likely much after that.
User avatar
BRoss
IT Director
Posts: 10003336
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha

Re: Omaha Streetcar Discussion

Post by BRoss »

UNMC has a draft plan but no timeline or specifics.

https://nebraskaexaminer.com/2023/11/08 ... car-route/
Cindy Gonzalez, Nebraska Examiner wrote:The University of Nebraska Medical Center said Wednesday it is interested in participating in a second phase of Omaha’s modern streetcar project, one that could take the streetcar route west onto UNMC’s growing campus.

UNMC responded to the Nebraska Examiner in a statement, saying that its leadership has provided the City of Omaha with a proposal “to create a second phase to extend the streetcar.”
An example of what a modern streetcar looks like. Omaha’s design, color and other details will depend on the chosen manufacturer. Bids are to be opened Jan. 24, with selection of a carmaker expected in February. (Courtesy of CAF)

Medical center leaders believe that such an extension could be funded by public tax-increment financing. UNMC officials offered no timeline and declined to answer more specific questions on the streetcar topic.
“UNMC leaders have provided the city with a draft plan to create a second phase to extend the streetcar, which would be supported by additional TIF funding opportunities as the Saddle Creek property expansion looks to incorporate private business and residential properties,” said UNMC, Nebraska’s only public academic health science center.
halgy
Home Owners Association
Posts: 197
Joined: Tue Apr 26, 2022 12:09 pm
Location: Downtown Omaha

Re: Omaha Streetcar Discussion

Post by halgy »

UNMC and UNO should combine forces to extend the line through the UNMC campus and all the way to the north UNO campus. And then south to Aksarben. And then buy me a pony.
Dusty
Human Relations
Posts: 778
Joined: Wed May 25, 2011 10:53 pm
Location: Central Florida

Re: Omaha Streetcar Discussion

Post by Dusty »

Ooh a pony! We can ride it to the train stop and wait for the next streetcar! LOL!

Taking the line to the edge of the Med Center (42nd St) was the original plan to stop. If they want to pay the money to extend it through their campus, then that's on them. But anything longer than this would create really long wait times for trains. Any extension would be an entirely different line. They said Farnam route will take 40 minutes to make the whole circuit. Add in the 5-6 cars and it should bring the wait time down to 8-12 minutes between trains.

I get the excitement of expanding the network. Keep in mind, streetcars are meant to move slow and connect a ton of destinations in a dense environment. To me, Farnam and 10/13th corridors are the only ones that match that.

I feel like we can do a better job connecting Aksarben via bus. Faster and can handle some of those hills better.
Omaha's Transit Future starts now. Let's make the change!
Omaha Transit Network
halgy
Home Owners Association
Posts: 197
Joined: Tue Apr 26, 2022 12:09 pm
Location: Downtown Omaha

Re: Omaha Streetcar Discussion

Post by halgy »

Could they not just add more trains to keep wait times low? I assumed that'd be part of any extension.

The route I indiated has some low-density sections, but not that much worse than 10th/13th. Also, it is close enough to Dodge to get some usage from developments there. Once it gets through the residential neighborhoods, UNO/Aksarben have enough potential ridership to make it worthwhile (I'd imagine it would be a big selling point for UNO). And there's always the possibility that some additional density would be built somewhere along the line.

I also vaguely think having some SFH attached to the line would be good, as it would provide more options. Someone might want to work at UNMC and is interested in living car-free, but doesn't want to live in a condo. Without the streetcar, they'd be likely to live wherever and just drive. Having some SFH available along good transit would make the system as a whole more appealing to more people. It might not be worth extending the streetcar into a SFH area, but going through one to get to a couple of other dense areas could be.
User avatar
Coyote
City Council
Posts: 34366
Joined: Tue Nov 18, 2003 11:18 am
Location: Aksarben Village

Re: Omaha Streetcar Discussion

Post by Coyote »

Blackstone business sees opportunity in streetcar

Dusty
Human Relations
Posts: 778
Joined: Wed May 25, 2011 10:53 pm
Location: Central Florida

Re: Omaha Streetcar Discussion

Post by Dusty »

halgy wrote: Thu Nov 09, 2023 11:04 am Could they not just add more trains to keep wait times low? I assumed that'd be part of any extension.

The route I indiated has some low-density sections, but not that much worse than 10th/13th. Also, it is close enough to Dodge to get some usage from developments there. Once it gets through the residential neighborhoods, UNO/Aksarben have enough potential ridership to make it worthwhile (I'd imagine it would be a big selling point for UNO). And there's always the possibility that some additional density would be built somewhere along the line.

I also vaguely think having some SFH attached to the line would be good, as it would provide more options. Someone might want to work at UNMC and is interested in living car-free, but doesn't want to live in a condo. Without the streetcar, they'd be likely to live wherever and just drive. Having some SFH available along good transit would make the system as a whole more appealing to more people. It might not be worth extending the streetcar into a SFH area, but going through one to get to a couple of other dense areas could be.
Streetcars work in very dense areas. They need the population and tax dollars to support it. Streetcars move slow to connect attractions/districts that you could technically walk to. Think of it like the movable walkways at airports. Yes, I can walk the concourse, but the walkway is slightly faster, convenient, and a little fun. The streetcar is a larger scale of that. It will be moving at 8-12 mph. You could easily ride a bicycle faster than this. People will be jumping on and off quickly. Example: Eat dinner at Midtown Crossing then jump on to Blackstone for dessert. Finish a concert at the CHI and ride to the Old Market for drinks after.
Omaha's Transit Future starts now. Let's make the change!
Omaha Transit Network
User avatar
skinzfan23
City Council
Posts: 11579
Joined: Mon Feb 09, 2004 11:26 am
Location: Omaha/Bellevue

Re: Omaha Streetcar Discussion

Post by skinzfan23 »

Dusty wrote: Fri Nov 10, 2023 10:53 am

Streetcars work in very dense areas. They need the population and tax dollars to support it. Streetcars move slow to connect attractions/districts that you could technically walk to. Think of it like the movable walkways at airports. Yes, I can walk the concourse, but the walkway is slightly faster, convenient, and a little fun. The streetcar is a larger scale of that. It will be moving at 8-12 mph. You could easily ride a bicycle faster than this. People will be jumping on and off quickly. Example: Eat dinner at Midtown Crossing then jump on to Blackstone for dessert. Finish a concert at the CHI and ride to the Old Market for drinks after.
Thank you....this is what so many people don't seem to understand. We don't need extensions to north Omaha, the airport or the zoo (at least not anytime in the near future) This is not light rail and not going to be working in the same manner. Like the example you mentioned, that is exactly what it would be for. Hopping from one district to another but not for someone in a hurry to catch a flight or travel across the whole metro.

I think the extension to CB is intriguing but I can't imagine how they are going to pay for it unless the casinos pay some of it. Also I am not sure that it is needed either, since that isn't a densely populated area on the west end.
User avatar
Garrett
County Board
Posts: 4629
Joined: Wed Nov 26, 2008 6:29 pm
Location: New York City

Re: Omaha Streetcar Discussion

Post by Garrett »

skinzfan23 wrote: Fri Nov 10, 2023 11:13 am
Dusty wrote: Fri Nov 10, 2023 10:53 am

Streetcars work in very dense areas. They need the population and tax dollars to support it. Streetcars move slow to connect attractions/districts that you could technically walk to. Think of it like the movable walkways at airports. Yes, I can walk the concourse, but the walkway is slightly faster, convenient, and a little fun. The streetcar is a larger scale of that. It will be moving at 8-12 mph. You could easily ride a bicycle faster than this. People will be jumping on and off quickly. Example: Eat dinner at Midtown Crossing then jump on to Blackstone for dessert. Finish a concert at the CHI and ride to the Old Market for drinks after.
Thank you....this is what so many people don't seem to understand. We don't need extensions to north Omaha, the airport or the zoo (at least not anytime in the near future) This is not light rail and not going to be working in the same manner. Like the example you mentioned, that is exactly what it would be for. Hopping from one district to another but not for someone in a hurry to catch a flight or travel across the whole metro.

I think the extension to CB is intriguing but I can't imagine how they are going to pay for it unless the casinos pay some of it. Also I am not sure that it is needed either, since that isn't a densely populated area on the west end.
Council Bluffs is looking to get federal dollars, and then basically heavily invest in densifying they corridor. They want to add around 55k people just along their streetcar line, which would be impressive if they manage it. I think North O and the Zoo are both fine investments for lines as well, assuming enough new housing can be built along it.
OMA-->CHI-->NYC
halgy
Home Owners Association
Posts: 197
Joined: Tue Apr 26, 2022 12:09 pm
Location: Downtown Omaha

Re: Omaha Streetcar Discussion

Post by halgy »

skinzfan23 wrote: Fri Nov 10, 2023 11:13 am
Dusty wrote: Fri Nov 10, 2023 10:53 am

Streetcars work in very dense areas. They need the population and tax dollars to support it. Streetcars move slow to connect attractions/districts that you could technically walk to. Think of it like the movable walkways at airports. Yes, I can walk the concourse, but the walkway is slightly faster, convenient, and a little fun. The streetcar is a larger scale of that. It will be moving at 8-12 mph. You could easily ride a bicycle faster than this. People will be jumping on and off quickly. Example: Eat dinner at Midtown Crossing then jump on to Blackstone for dessert. Finish a concert at the CHI and ride to the Old Market for drinks after.
Thank you....this is what so many people don't seem to understand. We don't need extensions to north Omaha, the airport or the zoo (at least not anytime in the near future) This is not light rail and not going to be working in the same manner. Like the example you mentioned, that is exactly what it would be for. Hopping from one district to another but not for someone in a hurry to catch a flight or travel across the whole metro.

I think the extension to CB is intriguing but I can't imagine how they are going to pay for it unless the casinos pay some of it. Also I am not sure that it is needed either, since that isn't a densely populated area on the west end.
That's fair enough. I'm definitely not an expert. I was just hoping that the potential for development and other opportunities (and somewhat connecting to Dodge) along the route would make it plausible. Not all areas are dense now, but the streetcar could help push in that direction. I don't see light rail coming in any time soon, so this would be the only opportunity for higher-quality transit down to Aksarben anytime soon.

I'd agree with Garrett that an extension north/south would be more productive and plausible, especially if they take it in increments rather than needing to do it all at once.
Dusty
Human Relations
Posts: 778
Joined: Wed May 25, 2011 10:53 pm
Location: Central Florida

Re: Omaha Streetcar Discussion

Post by Dusty »

Garrett wrote: Fri Nov 10, 2023 2:51 pm
skinzfan23 wrote: Fri Nov 10, 2023 11:13 am
Dusty wrote: Fri Nov 10, 2023 10:53 am Streetcars work in very dense areas. They need the population and tax dollars to support it. Streetcars move slow to connect attractions/districts that you could technically walk to. Think of it like the movable walkways at airports. Yes, I can walk the concourse, but the walkway is slightly faster, convenient, and a little fun. The streetcar is a larger scale of that. It will be moving at 8-12 mph. You could easily ride a bicycle faster than this. People will be jumping on and off quickly. Example: Eat dinner at Midtown Crossing then jump on to Blackstone for dessert. Finish a concert at the CHI and ride to the Old Market for drinks after.
Thank you....this is what so many people don't seem to understand. We don't need extensions to north Omaha, the airport or the zoo (at least not anytime in the near future) This is not light rail and not going to be working in the same manner. Like the example you mentioned, that is exactly what it would be for. Hopping from one district to another but not for someone in a hurry to catch a flight or travel across the whole metro.

I think the extension to CB is intriguing but I can't imagine how they are going to pay for it unless the casinos pay some of it. Also I am not sure that it is needed either, since that isn't a densely populated area on the west end.
Council Bluffs is looking to get federal dollars, and then basically heavily invest in densifying they corridor. They want to add around 55k people just along their streetcar line, which would be impressive if they manage it. I think North O and the Zoo are both fine investments for lines as well, assuming enough new housing can be built along it.
I remember when Blackstone was nothing more than 2 dumpy dive bars on 40th and Farnam. All it took was a few solid businesses to spark an explosion of growth. Council Bluffs will be the same once the streetcar gets approved. 1st Ave used to be railroad tracks, but converted to walking/bike path. The cost to convert this back to a train tracks will be much less than Omaha's streetcar. No busting up streets or moving utilities. Also, City of Council Bluffs owns a ton of land along Broadway. They are very eager to start attracting hotels, and mixed use developments along the route. The biggest hurdle is getting federal funding to build the multi-modal bridge across the river.
Omaha's Transit Future starts now. Let's make the change!
Omaha Transit Network
Dusty
Human Relations
Posts: 778
Joined: Wed May 25, 2011 10:53 pm
Location: Central Florida

Re: Omaha Streetcar Discussion

Post by Dusty »

halgy wrote: Sat Nov 11, 2023 7:23 am
skinzfan23 wrote: Fri Nov 10, 2023 11:13 am
Dusty wrote: Fri Nov 10, 2023 10:53 am Streetcars work in very dense areas. They need the population and tax dollars to support it. Streetcars move slow to connect attractions/districts that you could technically walk to. Think of it like the movable walkways at airports. Yes, I can walk the concourse, but the walkway is slightly faster, convenient, and a little fun. The streetcar is a larger scale of that. It will be moving at 8-12 mph. You could easily ride a bicycle faster than this. People will be jumping on and off quickly. Example: Eat dinner at Midtown Crossing then jump on to Blackstone for dessert. Finish a concert at the CHI and ride to the Old Market for drinks after.
Thank you....this is what so many people don't seem to understand. We don't need extensions to north Omaha, the airport or the zoo (at least not anytime in the near future) This is not light rail and not going to be working in the same manner. Like the example you mentioned, that is exactly what it would be for. Hopping from one district to another but not for someone in a hurry to catch a flight or travel across the whole metro.

I think the extension to CB is intriguing but I can't imagine how they are going to pay for it unless the casinos pay some of it. Also I am not sure that it is needed either, since that isn't a densely populated area on the west end.
That's fair enough. I'm definitely not an expert. I was just hoping that the potential for development and other opportunities (and somewhat connecting to Dodge) along the route would make it plausible. Not all areas are dense now, but the streetcar could help push in that direction. I don't see light rail coming in any time soon, so this would be the only opportunity for higher-quality transit down to Aksarben anytime soon.

I'd agree with Garrett that an extension north/south would be more productive and plausible, especially if they take it in increments rather than needing to do it all at once.
Don't underestimate the power of a great bus network. METRO is getting better and better. With a great network it extends your reach to more areas that you wouldn't necessarily walk to. I will expand on the previous example...Eat dinner at Midtown, jump on streetcar to Blackstone for dessert, jump on the bus to Aksarben Village to nighttime concert at Stinson Park.
Omaha's Transit Future starts now. Let's make the change!
Omaha Transit Network
User avatar
Renovator2559
Human Relations
Posts: 944
Joined: Tue May 23, 2023 2:48 pm
Location: Midtown Omaha

Re: Omaha Streetcar Discussion

Post by Renovator2559 »

Dusty wrote: Fri Nov 10, 2023 10:53 am Streetcars work in very dense areas. They need the population and tax dollars to support it. Streetcars move slow to connect attractions/districts that you could technically walk to. Think of it like the movable walkways at airports. Yes, I can walk the concourse, but the walkway is slightly faster, convenient, and a little fun. The streetcar is a larger scale of that. It will be moving at 8-12 mph. You could easily ride a bicycle faster than this. People will be jumping on and off quickly. Example: Eat dinner at Midtown Crossing then jump on to Blackstone for dessert. Finish a concert at the CHI and ride to the Old Market for drinks after.
I don't know what type streetcar you mention is slow, but I did not feel that the KC streetcar was slow at all, it moves at the general pace of regular traffic and bicycles cannot outrun it. In fact the speed is comparable to that of a regular bus, with bus station interval stops.

Our streetcar will have stations as everyone knows, so there is no one hopping in or hopping out whenever. If the KC streetcar is our model, then our experience will be similar.

The KC streetcar is packed and full, with plenty of people standing and that's despite that KC still has plenty of parking lots surrounding the route that they are most likely in the process in filling in. You can see all demographics in the KC streetcar, which indicates a total success.

I can sense that our streetcar will be just as a success, as the Omaha route has few parking lots and shovel ready lots for development; a longer initial length of the route and districts more strategically aligned to the route. It will be beautiful to see the transformation along the transit path!
Dusty wrote: Sat Nov 11, 2023 8:46 am Don't underestimate the power of a great bus network. METRO is getting better and better. With a great network it extends your reach to more areas that you wouldn't necessarily walk to. I will expand on the previous example...Eat dinner at Midtown, jump on streetcar to Blackstone for dessert, jump on the bus to Aksarben Village to nighttime concert at Stinson Park.
Well yes, but we also have to remember that the bus also carries a stigma here in the states by some people of being the most undesirable transportation, you will not see people with this mindset on buses but you will see them in light rail and streetcars. Of course this mindset can change if our transit networks continue to grow and expand. The streetcar is the gateway in getting people in buses.
Garrett wrote: Fri Nov 10, 2023 2:51 pm Council Bluffs is looking to get federal dollars, and then basically heavily invest in densifying they corridor. They want to add around 55k people just along their streetcar line, which would be impressive if they manage it. I think North O and the Zoo are both fine investments for lines as well, assuming enough new housing can be built along it.
I've been impressed with Council Bluffs, I do not know how Council Bluffs is getting the funds in creating stroad Broadway, that does not look like an eyesore, as well as installing the bike paths and walkways, while not skimping on materials by their use of landscaping, bricklaying and wavy design street lamps, decorative street columns. Council Bluffs is doing a good job in upholding aesthetics and their hunger for the streetcar is impressive. Based on the pieces they have laid and the cooperation of both sides, I can see that goal being met and even exceeded!
Home sweet, home...Omaha!
User avatar
Dundeemaha
Human Relations
Posts: 595
Joined: Thu Apr 04, 2013 11:41 am
Location: Country Club

Re: Omaha Streetcar Discussion

Post by Dundeemaha »

Renovator2559 wrote: Sun Nov 12, 2023 11:13 pm I do not know how Council Bluffs is getting the funds in creating stroad Broadway,
The Iowa West Foundation (money from gambling) contributed $10 million. The state contributed $16-20 million in exchange for Council Bluffs taking on more of the maintenance burden down the line. That was the vast majority.
F0R_L1F3
Home Owners Association
Posts: 155
Joined: Sun Oct 01, 2023 12:24 am

Re: Omaha Streetcar Discussion

Post by F0R_L1F3 »

Wanted to post this a few days ago but looks like a bike lane on Farnarm? Is this actually going to happen or is this just for nice looks in the photo?


Image
Dusty
Human Relations
Posts: 778
Joined: Wed May 25, 2011 10:53 pm
Location: Central Florida

Re: Omaha Streetcar Discussion

Post by Dusty »

F0R_L1F3 wrote: Tue Nov 14, 2023 9:57 pm Wanted to post this a few days ago but looks like a bike lane on Farnarm? Is this actually going to happen or is this just for nice looks in the photo?


Image
It appears to be a cyclist crossing an intersection with crosswalk lines. It does seem like they widened the sidewalk from the pictures. As long as there is room, I don't see why they couldn't put in a protected bike lane next to the sidewalk. If you are going to spend the money to bust up the curb, then put in a bike lane as well.
Omaha's Transit Future starts now. Let's make the change!