This is great! I was mainly hoping for the extension to Cuming St. Much more inviting to pull people across the street!


Omaha's Transit Future starts now. Let's make the change!
Omaha Transit Network
Omaha Transit Network
-
Brad
- Photographer
- Posts: 1036467
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Millwork Commons
Are they keeping the Union Pacific Display Track?BRoss wrote: Wed Jan 31, 2024 12:08 pm10th and Cuming is set to be connected 11th and Izard this year. See page 39 of the CIP.Dusty wrote: Wed Jan 31, 2024 11:48 am Idea for Millwork Commons. Could we rebuild Izard Street to connect up to 10th and Cuming?
I was just thinking it would be easier for a bus to cut through the area if this road was connected better.
![]()

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
BRoss
- IT Director
- Posts: 10003341
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Millwork Commons
Not sure what it will look like.
-
BRoss
- IT Director
- Posts: 10003341
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Millwork Commons
One other thing too - there are other road extensions planned for around this area in the next couple years as well including a truck bypass. The Companion Projects section lists them all:
- 2019T-130 - Millwork Avenue - 11th to 13th Street;
- 2019T-132 - 12th Street - Millwork Avenue to Seward Street;
- 2022T-137 - 14th Street - Nicholas Street to Millwork Avenue;
- 2022T-138 – Millwork Avenue - 13th Street to 14th Street
-
ita
- County Board
- Posts: 4736
- Joined: Thu Jul 12, 2018 4:11 pm
Re: Millwork Commons
These are road projects I can get behind. Establishing the grid and building more ped/bike connections. I do wonder what else is planned for the New Makerhood part of that area. I know Future Forward pretty much owns all the properties on both sides of 11th from Millwork Ave and Seward. They seem to be in a holding pattern for the most part while Millwork Commons has been booming.
-
nativeomahan
- County Board
- Posts: 5982
- Joined: Fri Nov 12, 2004 2:46 pm
- Location: Omaha and Puerto Vallarta
Re: Millwork Commons
This street extension would only add to the momentum for including a bus line north from the Old Market, up 10th Street and into the North Downtown/Millwork district.Dusty wrote: Wed Jan 31, 2024 12:22 pm This is great! I was mainly hoping for the extension to Cuming St. Much more inviting to pull people across the street!
![]()
-
Dusty
- Human Relations
- Posts: 781
- Joined: Wed May 25, 2011 10:53 pm
- Location: Central Florida
Re: Millwork Commons
I was originally thinking the same thing until they announced the soccer stadium. Not a big deal. I made a few small tweaks to my transit vison for 10th Street. Basically would run from the Zoo to Cuming and then run up Abbott to connect the soccer stadium and airport. In a way, you can say it's a tourist line from the airport to hit all the major attractions along 10th Street.nativeomahan wrote: Fri Feb 02, 2024 11:29 amThis street extension would only add to the momentum for including a bus line north from the Old Market, up 10th Street and into the North Downtown/Millwork district.Dusty wrote: Wed Jan 31, 2024 12:22 pm This is great! I was mainly hoping for the extension to Cuming St. Much more inviting to pull people across the street!
![]()
Even so, it's only a few blocks to walk to Millwork Commons.
Getting this connection to 10th and Cuming is huge. Brad called it right...what about the rail tracks blocking the path? As a pedestrian, the current way looks like a dead end. Having this connect will naturally pull people across the street right into Millwork Commons.
Omaha's Transit Future starts now. Let's make the change!
Omaha Transit Network
Omaha Transit Network
-
thenewguy
- County Board
- Posts: 4295
- Joined: Fri Oct 19, 2007 9:50 pm
- Location: Council Bluffs
Re: Millwork Commons
a million dollars? I can't believe it costs that much for that small stretch of roadDusty wrote: Wed Jan 31, 2024 12:22 pm This is great! I was mainly hoping for the extension to Cuming St. Much more inviting to pull people across the street!
![]()
Go Cubs Go
-
Louie
- County Board
- Posts: 4896
- Joined: Fri Dec 23, 2011 4:23 pm
- Location: Dundee
Re: Millwork Commons
They have to remove the existing rail as well as connect and incorporate it into a fairly large intersection.
-
Brad
- Photographer
- Posts: 1036467
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Millwork Commons
Remove Existing Pavement @ $15sqyd = 2000x15 = $30,000thenewguy wrote: Fri Feb 02, 2024 1:54 pm a million dollars? I can't believe it costs that much for that small stretch of road
Subgrade Preparation @ $5sqyd 4000x5 = $20,000
9" PCC Concrete Pavement @ $80sqyd 4000x80 = $320,000
So that's already $370,000 with just 3 items.
You still have Sidewalks, Curb Ramps, Crosswalks, Pavement Markings, Erosion Control, Seeding and Matting, Street Signs, and on and on and on.
Construction isn't cheap.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
thenewguy
- County Board
- Posts: 4295
- Joined: Fri Oct 19, 2007 9:50 pm
- Location: Council Bluffs
Re: Millwork Commons
you aint lyin'Brad wrote: Sat Feb 03, 2024 12:13 amRemove Existing Pavement @ $15sqyd = 2000x15 = $30,000thenewguy wrote: Fri Feb 02, 2024 1:54 pm a million dollars? I can't believe it costs that much for that small stretch of road
Subgrade Preparation @ $5sqyd 4000x5 = $20,000
9" PCC Concrete Pavement @ $80sqyd 4000x80 = $320,000
So that's already $370,000 with just 3 items.
You still have Sidewalks, Curb Ramps, Crosswalks, Pavement Markings, Erosion Control, Seeding and Matting, Street Signs, and on and on and on.
Construction isn't cheap.
i mean, it makes sense: i was going to have a 22'x10' pad poured and it was almost double the quote i had 5 or 6 years ago
Go Cubs Go
-
GenX
- Parks & Recreation
- Posts: 1216
- Joined: Thu Feb 04, 2016 8:16 pm
- Location: Omaha
Re: Millwork Commons
Plus utilities, infrastructure and likely all new traffic lightsBrad wrote: Sat Feb 03, 2024 12:13 amRemove Existing Pavement @ $15sqyd = 2000x15 = $30,000thenewguy wrote: Fri Feb 02, 2024 1:54 pm a million dollars? I can't believe it costs that much for that small stretch of road
Subgrade Preparation @ $5sqyd 4000x5 = $20,000
9" PCC Concrete Pavement @ $80sqyd 4000x80 = $320,000
So that's already $370,000 with just 3 items.
You still have Sidewalks, Curb Ramps, Crosswalks, Pavement Markings, Erosion Control, Seeding and Matting, Street Signs, and on and on and on.
Construction isn't cheap.
-
ita
- County Board
- Posts: 4736
- Joined: Thu Jul 12, 2018 4:11 pm
Re: Millwork Commons
Drove by Millwork today and the Dizzy Mule project is looking good. Wish I got a picture, but it really enhances the neighborhood with added density and facelifting the abandoned property.
-
skinzfan23
- City Council
- Posts: 11583
- Joined: Mon Feb 09, 2004 11:26 am
- Location: Omaha/Bellevue
Re: Millwork Commons
Yeah I have been meaning to take a picture the last few times I was there as well.ita wrote: Wed Mar 27, 2024 5:00 pm Drove by Millwork today and the Dizzy Mule project is looking good. Wish I got a picture, but it really enhances the neighborhood with added density and facelifting the abandoned property.
-
iamjacobm
- City Council
- Posts: 10801
- Joined: Sat Apr 10, 2010 6:52 am
- Location: Chicago
Re: Millwork Commons
Nice get for the neighborhood.
https://nebraskaexaminer.com/briefs/goo ... t-network/
https://nebraskaexaminer.com/briefs/goo ... t-network/
Google Fiber, a new-to-market high-speed fiber optic internet provider, has leased about 7,000 square feet in the rehabbed Ashton building of the Millwork Commons district.
...
With Google, the nearly 200,000-square-foot Ashton building will be 85% full, Ellis said Tuesday.
A Google Fiber spokesman declined to provide the number of workers that will be based at its second-floor space. But she said the team there would support Google Fiber’s growing presence in the metro area.
-
skinzfan23
- City Council
- Posts: 11583
- Joined: Mon Feb 09, 2004 11:26 am
- Location: Omaha/Bellevue
-
Renovator2559
- Human Relations
- Posts: 944
- Joined: Tue May 23, 2023 2:48 pm
- Location: Midtown Omaha
Re: Millwork Commons
I took these pictures a few weeks ago.
I didn't know what Millwork Commons area was. I thought Milwork Commons, were the buildings bordering Cuming street. Since Cuming Street is large and discourages crossing over to the other side of the street, this in a way was a discouragement of exploring the area.
This is my first time seeing Millwork commons, and quite impressed of the area. Never really knew what the Millwork Commons was.
The area has the perfect ingredients of becoming another destination neighborhood. I'm impressed with the narrow cobblestone streets that give the Old Market feel.
I just hope this area of Cuming Street goes on a road diet to make this area a seamless cross from the Baseball field.
Though this street being a major artery to Eppley Airfield, who knows if it would be even possible without affecting incoming and outgoing passengers.






Looks like a ghostown, since most of the buildings are under construction but once this area is complete, it looks like this area will become vibrant!

I didn't know what Millwork Commons area was. I thought Milwork Commons, were the buildings bordering Cuming street. Since Cuming Street is large and discourages crossing over to the other side of the street, this in a way was a discouragement of exploring the area.
This is my first time seeing Millwork commons, and quite impressed of the area. Never really knew what the Millwork Commons was.
The area has the perfect ingredients of becoming another destination neighborhood. I'm impressed with the narrow cobblestone streets that give the Old Market feel.
I just hope this area of Cuming Street goes on a road diet to make this area a seamless cross from the Baseball field.
Though this street being a major artery to Eppley Airfield, who knows if it would be even possible without affecting incoming and outgoing passengers.






Looks like a ghostown, since most of the buildings are under construction but once this area is complete, it looks like this area will become vibrant!

Home sweet, home...Omaha!
-
F0R_L1F3
- Home Owners Association
- Posts: 155
- Joined: Sun Oct 01, 2023 12:24 am
Re: Millwork Commons
Maybe some signage near Cuming would help improve more traffic from the outside. That'd be cool as a small little detail to maybe encourage people to come.
-
Renovator2559
- Human Relations
- Posts: 944
- Joined: Tue May 23, 2023 2:48 pm
- Location: Midtown Omaha
Re: Millwork Commons
Signage would workF0R_L1F3 wrote: Wed May 29, 2024 1:08 pm Maybe some signage near Cuming would help improve more traffic from the outside. That'd be cool as a small little detail to maybe encourage people to come.
Also that street with all the construction going on is a barrier for entry at the moment.
This part of Cuming Street is not pedestrian friendly, the median is basic, thin bland suburban style median that is very difficult to cross. Some of the crossings don't even have painted crosswalks, despite there being a cross, do not cross light.

If a beautiful landscaped median was installed similar to what Creighton at 24th has, with protected pedestrian bollards, this would enhance the connection of Millwork to the Baseball stadium.
Of course Cuming street would be slightly different, as Cuming street is a more high traffic area to the airport, so there would have to be a balance between cars and the pedestrian experience.
Home sweet, home...Omaha!
-
GenX
- Parks & Recreation
- Posts: 1216
- Joined: Thu Feb 04, 2016 8:16 pm
- Location: Omaha
Re: Millwork Commons
Cuming will never see a reduction in traffic volume, it’s simply too important of a thoroughfare. The best we would likely get would be something like the pedestrian bridges on Las Vegas Boulevard.Renovator2559 wrote: Thu May 30, 2024 3:37 pmSignage would workF0R_L1F3 wrote: Wed May 29, 2024 1:08 pm Maybe some signage near Cuming would help improve more traffic from the outside. That'd be cool as a small little detail to maybe encourage people to come.
Also that street with all the construction going on is a barrier for entry at the moment.
This part of Cuming Street is not pedestrian friendly, the median is basic, thin bland suburban style median that is very difficult to cross. Some of the crossings don't even have painted crosswalks, despite there being a cross, do not cross light.
If a beautiful landscaped median was installed similar to what Creighton at 24th has, with protected pedestrian bollards, this would enhance the connection of Millwork to the Baseball stadium.
Of course Cuming street would be slightly different, as Cuming street is a more high traffic area to the airport, so there would have to be a balance between cars and the pedestrian experience.
-
Renovator2559
- Human Relations
- Posts: 944
- Joined: Tue May 23, 2023 2:48 pm
- Location: Midtown Omaha
Re: Millwork Commons
This is not poorly designed, car centric Las Vegas. There's no need to even mention a city like Las Vegas that is anything but pedestrian friendly. Not a good example.
Pedestrian bridges are too expensive, a poor investment and have been shown to not be successful in the long run. Anyone that goes on wheels are at a disavantage and wouldn't use it.
Here's more detail as to pedestrian bridges are not a wise investment. It even talks about the Las Vegas strip.
Sounds like you misinterpreted, the idea suggested is to rebuild the median in this section to be slightly wider, with landscaping and a holding area for pedestrian with bollards, so that they can cross Cuming street in two parts.
Pedestrian bridges are too expensive, a poor investment and have been shown to not be successful in the long run. Anyone that goes on wheels are at a disavantage and wouldn't use it.
Here's more detail as to pedestrian bridges are not a wise investment. It even talks about the Las Vegas strip.
Sounds like you misinterpreted, the idea suggested is to rebuild the median in this section to be slightly wider, with landscaping and a holding area for pedestrian with bollards, so that they can cross Cuming street in two parts.
Home sweet, home...Omaha!
-
F0R_L1F3
- Home Owners Association
- Posts: 155
- Joined: Sun Oct 01, 2023 12:24 am
Re: Millwork Commons
Agreed and just touching up the area with more amenities for pedestrians as well such as some benches, maybe some statues or something to talk about the history of the city or state. Nothing super fancy or over the top, just some streetscaping and improvements for the quality of the walk and entrance.
-
jjjjhskr
- Human Relations
- Posts: 650
- Joined: Sun Mar 13, 2005 11:31 am
- Location: O!
Re: Millwork Commons
The businesses in Millwork Commons do not suffer from a lack of business. Whenever I’ve been there they’re busy and often packed with people. People are discovering this hidden gem.F0R_L1F3 wrote: Wed May 29, 2024 1:08 pm Maybe some signage near Cuming would help improve more traffic from the outside. That'd be cool as a small little detail to maybe encourage people to come.
Back Home in Omaha!
-
F0R_L1F3
- Home Owners Association
- Posts: 155
- Joined: Sun Oct 01, 2023 12:24 am
Re: Millwork Commons
I defiantly agree and it probably won't have a decrease or one that's impactful with residents going up and the hotels nearby but in an instance like the College World Series, having some character on the outside as a small little entrance wouldn't be that bad, gives it a little charm and maybe a few people here and there will check it out.jjjjhskr wrote: Sat Jun 01, 2024 1:40 pmThe businesses in Millwork Commons do not suffer from a lack of business. Whenever I’ve been there they’re busy and often packed with people. People are discovering this hidden gem.F0R_L1F3 wrote: Wed May 29, 2024 1:08 pm Maybe some signage near Cuming would help improve more traffic from the outside. That'd be cool as a small little detail to maybe encourage people to come.
-
halgy
- Home Owners Association
- Posts: 198
- Joined: Tue Apr 26, 2022 12:09 pm
- Location: Downtown Omaha
Re: Millwork Commons
I still wish it was a bit easier to get there. I'd imagine most people there either live in the nearby buildings, or drive. I'm in the middle zone where it is a bit too far to walk, but much too near to drive, so I just don't go. Here's to hoping that they'll extend the streetcar just a bit further north, either into Millwork Commons itself, or just south of there before jogging east to the new soccer stadium. That North Downtown area is getting great, and absolutely deserves to be better connected with the other popular downtown/midtown neighborhoods.jjjjhskr wrote: Sat Jun 01, 2024 1:40 pmThe businesses in Millwork Commons do not suffer from a lack of business. Whenever I’ve been there they’re busy and often packed with people. People are discovering this hidden gem.F0R_L1F3 wrote: Wed May 29, 2024 1:08 pm Maybe some signage near Cuming would help improve more traffic from the outside. That'd be cool as a small little detail to maybe encourage people to come.
-
iamjacobm
- City Council
- Posts: 10801
- Joined: Sat Apr 10, 2010 6:52 am
- Location: Chicago
Re: Millwork Commons
Pulling 10th street through Cuming to connect with 11th is still in the plans I believe. That will be helpful.
-
ita
- County Board
- Posts: 4736
- Joined: Thu Jul 12, 2018 4:11 pm
Re: Millwork Commons
I agree that better connections are needed in North Downtown and Millwork Commons. The active mobility plan was just released and there are some prioritized bike infrastructure in the area, mostly the east-west bike lane through Creighton and Builders District but also North to South on 16ths and one leg from Mike Fahey/MECA Drive on 10th, north to Cuming. Anyway, bus, electric bikes and scooters help connect that part of town right now from an alternative transit standpoint, but additional infrastructure improvements are needed to really connect it to downtown, the Riverfront and North Omaha.halgy wrote: Mon Jun 03, 2024 10:47 amI still wish it was a bit easier to get there. I'd imagine most people there either live in the nearby buildings, or drive. I'm in the middle zone where it is a bit too far to walk, but much too near to drive, so I just don't go. Here's to hoping that they'll extend the streetcar just a bit further north, either into Millwork Commons itself, or just south of there before jogging east to the new soccer stadium. That North Downtown area is getting great, and absolutely deserves to be better connected with the other popular downtown/midtown neighborhoods.jjjjhskr wrote: Sat Jun 01, 2024 1:40 pmThe businesses in Millwork Commons do not suffer from a lack of business. Whenever I’ve been there they’re busy and often packed with people. People are discovering this hidden gem.F0R_L1F3 wrote: Wed May 29, 2024 1:08 pm Maybe some signage near Cuming would help improve more traffic from the outside. That'd be cool as a small little detail to maybe encourage people to come.
-
Louie
- County Board
- Posts: 4896
- Joined: Fri Dec 23, 2011 4:23 pm
- Location: Dundee
Re: Millwork Commons
That would absolutely help.iamjacobm wrote: Mon Jun 03, 2024 11:01 am Pulling 10th street through Cuming to connect with 11th is still in the plans I believe. That will be helpful.
-
Coyote
- City Council
- Posts: 34366
- Joined: Tue Nov 18, 2003 11:18 am
- Location: Aksarben Village
-
Louie
- County Board
- Posts: 4896
- Joined: Fri Dec 23, 2011 4:23 pm
- Location: Dundee
Re: Millwork Commons
How recent was this?
-
Brad
- Photographer
- Posts: 1036467
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Millwork Commons
Looks like two years ago.Louie wrote: Tue Jun 04, 2024 11:23 amHow recent was this?
The connection has not started as far as I know, but is scheduled to be completed this year.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
Coyote
- City Council
- Posts: 34366
- Joined: Tue Nov 18, 2003 11:18 am
- Location: Aksarben Village
Re: Millwork Commons
What is the plans for this year? The UP railyard just north of Cumings? What will this intersection of 10th street and Cumings look like?Brad wrote: Tue Jun 04, 2024 12:59 pmLooks like two years ago.Louie wrote: Tue Jun 04, 2024 11:23 amHow recent was this?
The connection has not started as far as I know, but is scheduled to be completed this year.
-
Brad
- Photographer
- Posts: 1036467
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Millwork Commons
First post on this Page has most of that info:Coyote wrote: Tue Jun 04, 2024 1:09 pm
What is the plans for this year? The UP railyard just north of Cumings? What will this intersection of 10th street and Cumings look like?
Not sure what they will do with the UP Display track.Dusty wrote: Wed Jan 31, 2024 12:22 pm This is great! I was mainly hoping for the extension to Cuming St. Much more inviting to pull people across the street!
![]()
Guessing nothing will happen until after the CWS.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
Coyote
- City Council
- Posts: 34366
- Joined: Tue Nov 18, 2003 11:18 am
- Location: Aksarben Village
Re: Millwork Commons
Thanks!Brad wrote: Wed Jun 05, 2024 8:21 pm First post on this Page has most of that info:
Not sure what they will do with the UP Display track.Dusty wrote: Wed Jan 31, 2024 12:22 pm This is great! I was mainly hoping for the extension to Cuming St. Much more inviting to pull people across the street!
![]()
Guessing nothing will happen until after the CWS.
-
Brad
- Photographer
- Posts: 1036467
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Millwork Commons
View from the Ballpark
You do not have the required permissions to view the files attached to this post.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
Garrett
- County Board
- Posts: 4634
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Millwork Commons
It’s been good to see this neighborhood finally develop. I remember finding it years ago on Google maps and thinking it had a lot of potential, particularly with the existing building stock it had. Good to see it built upon so quickly.
OMA-->CHI-->NYC
-
skinzfan23
- City Council
- Posts: 11583
- Joined: Mon Feb 09, 2004 11:26 am
- Location: Omaha/Bellevue
Re: Millwork Commons
Thats a great shot, that you can't see the scope of from the ground.
-
ita
- County Board
- Posts: 4736
- Joined: Thu Jul 12, 2018 4:11 pm
Re: Millwork Commons
This district is looking really good. I love that they kept much of the existing building stock. I am looking forward to see this continue to grow.
-
iamjacobm
- City Council
- Posts: 10801
- Joined: Sat Apr 10, 2010 6:52 am
- Location: Chicago
Re: Millwork Commons
TIF request for more apartments and a hotel in Millwork.
"Approval of The FRAME APARTMENTS
AND MILLWORK HOTEL TIF
Redevelopment Project Plan
LOCATION: Northwest and Southeast of 13th and
Nicholas Streets"
"Approval of The FRAME APARTMENTS
AND MILLWORK HOTEL TIF
Redevelopment Project Plan
LOCATION: Northwest and Southeast of 13th and
Nicholas Streets"
-
halgy
- Home Owners Association
- Posts: 198
- Joined: Tue Apr 26, 2022 12:09 pm
- Location: Downtown Omaha
Re: Millwork Commons
They said on Grow Omaha last weekend that the city is planning on building parking structure in the neighborhood.
Glad to see the neighborhood continuing to build out. I really hope that the streetcar can be extended up there. It would really tie everything together.City Plans to Build Parking Garage in Millwork Commons
The City of Omaha plans to build a 600-stall parking garage at Millwork Commons. The city council approved a resolution on consent agenda to allow for the project to be delivered by a construction manager at risk. The parking garage will be located just east of the Ashton building on a parcel bounded by 11th, 12th and Nicholas streets and Millwork Avenue. The estimated cost is $25 to $30 million