Saw a sign on Q Street near 204th St that said there's an upcoming information session about a new project. I'm assuming Q Street will be widened all the way to 204th?
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
Probably 204th & F. They have plans to widen the intersection for turn lanes on F Street this year.
Human Relations
Posts: 619
Joined: Thu Mar 22, 2007 12:54 am
Location: Omaha, NE
Seems like there are two projects, one on 204th at F, and another on Q itself, since the city has labeled it on the sign as "Q STREET PROJECT". But I haven't found any info online about it.
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
Oh, it might be the bridge replacement on the Elkhorn River. The TIP has it in FY 2027.
I've seen them list 192nd to 204th in the past TIPs and CIPs with a TBD year but it dropped off a while ago. So I don't think there's anything coming for that any time soon.
New to the Neighborhood
Posts: 36
Joined: Mon Feb 11, 2019 2:40 pm
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
Maybe it was the Douglas County Highway Plan that I used to see this project, which is why I haven't been seeing it in the TIP and CIP.cchandler790 wrote: ↑Mon May 13, 2024 10:44 pm [/img]Yes! In 2025 Q st will be widened from 192nd to 204th St.
![]()
Notice a little further down is has Construction Period UNK. Normally it will list a year when construction is tentatively set to happen. I've always viewed these pages without a construction year listed as more speculative. I would love to be wrong though. Hopefully something will get posted online in the next few days.

https://www.dcengineer.org/images/stori ... x_2024.pdf
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
Looks like you were right. I'm surprised they still listed the construction year as unknown in this fiscal year's plan, but Keep Omaha Moving now finally has the project listed:cchandler790 wrote: ↑Mon May 13, 2024 10:44 pmYes! In 2025 Q st will be widened from 192nd to 204th St.
https://keepomahamoving.com/projects/q- ... ct-c-28478
Public hearing is tomorrow night:
Construction will be 2025-2026.May 21, 2024
5pm to 7pm, brief presentation at 5:30pm
Millard Horizon High School
5300 George B. Lake Parkway
Omaha, NE 68022
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
Handout for the Q Street widening project: https://www.dcengineer.org/images/C-284 ... out-v4.pdf
New to the Neighborhood
Posts: 36
Joined: Mon Feb 11, 2019 2:40 pm
It's a very needed project! Glad it's getting done, with all the new developments. I wish 204th or highway 6 was an expressway.
New to the Neighborhood
Posts: 35
Joined: Thu Aug 17, 2023 12:09 am
I agree. I have no experience in transportation, but I feel like it was a huge missed opportunity to not make 204th into an expressway similar to west dodge. Just add in an interchange with west dodge road to the north, and curve to the west or east around gretna for another interchange with i-80. Would have helped with traffic on 204th through gretna and essentially served as a west o beltway, but now homes and businesses are built up to 204th and there are tons of signalized intersections being put up.cchandler790 wrote: ↑Tue May 21, 2024 9:41 pm It's a very needed project! Glad it's getting done, with all the new developments. I wish 204th or highway 6 was an expressway.
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
Presentation that has more info: https://keepomahamoving.com/application ... ebsite.pdf
Project will begin next year and last two construction seasons. Q Street will be closed during this time. OPPD will be replacing the large transmission poles beginning this fall.
No noise walls will be constructed along any of the project. An additional signal will go in at 201st Street. The only work being done on 204th is shorting the median noses; dual left turns will not be constructed there at this time (Q Street will be constructed with dual lefts, but initially only be striped for single).
Project will begin next year and last two construction seasons. Q Street will be closed during this time. OPPD will be replacing the large transmission poles beginning this fall.
No noise walls will be constructed along any of the project. An additional signal will go in at 201st Street. The only work being done on 204th is shorting the median noses; dual left turns will not be constructed there at this time (Q Street will be constructed with dual lefts, but initially only be striped for single).
Home Owners Association
Posts: 134
Joined: Thu Jan 13, 2022 11:21 am
I never seem learn and follow Waze and Google Maps to take 192nd North. If the Center Street intersection is not backed up, it is 3-4 minutes quicker than taking 204th. That is going from 192nd and Giles to Menards off 204th and Dodge.cchandler790 wrote: ↑Tue May 21, 2024 9:41 pm It's a very needed project! Glad it's getting done, with all the new developments. I wish 204th or highway 6 was an expressway.
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
The draft 2025 Douglas County Six-Year Highway Improvement Plan came out recently. This project has been moved from FY 2025 to 2026.
Home Owners Association
Posts: 105
Joined: Tue May 02, 2023 1:53 pm
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
No idea. I assume changing budget priorities. Road construction projects constantly get delayed. It can be frustrating.
Photographer
Posts: 1036552
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE
I think they also do traffic counts and if its not growing as fast as they were thinking, they may change priorities a little.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
They setup a construction cam: https://app.truelook.cloud/dashboard/20 ... 6zhg6egdqm
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
Posting this here as well since it's related to this project:
BRoss wrote: ↑Fri Oct 24, 2025 10:00 pmSpeaking of this, Q Street between 192nd & 204th appears to be way behind schedule for this same reason - or perhaps other utilities. I've been wondering since early this summer if they needed to move some of the wooden poles for this. The larger transmission lines were done last year, but these were still left as is.
From looking at the webcams, they have also seemed to have had a lot of weather delays due to frequent rain making things soggy, sometimes for many days at a time due to pooling. While we haven't had a crazy amount of rain (we are still technically under average this year), it has been frequent enough to where things haven't really been able to dry out enough for long periods this year. And not having the right conditions will certainly delay things.
But either way, these poles still have not been addressed and it's clear now that they need to move before they can continue paving the north side as well as continuing east (there's single pole on the south side in the way). And with where we are in the year, that window is quickly coming to a close.
I'm guessing this will drag into the middle of next year at the earliest, although I hope I'm wrong.
Human Relations
Posts: 619
Joined: Thu Mar 22, 2007 12:54 am
Location: Omaha, NE
They had originally said Fall 2025, but they did a quiet update on the projects page to say late Spring 2026. It's wild how far off course this project is though.
However, I am hopeful that they can open two lanes relatively soon, since it looks like they could have 2 lanes relatively quickly? It's not too far between segments if they could just hurry up and partially complete that stretch?
However, I am hopeful that they can open two lanes relatively soon, since it looks like they could have 2 lanes relatively quickly? It's not too far between segments if they could just hurry up and partially complete that stretch?
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
Pouring on the east side today. Looks like the pole that has been blocking it has been moved. So maybe they'll open two lanes over winter.
You do not have the required permissions to view the files attached to this post.
Human Relations
Posts: 619
Joined: Thu Mar 22, 2007 12:54 am
Location: Omaha, NE
Looks like eastbound lanes might be fully paved now? Even just for business access through that area, seems like they'll want to open up those lanes ASAP while they continue work on the westbound lanes?
Human Relations
Posts: 619
Joined: Thu Mar 22, 2007 12:54 am
Location: Omaha, NE
OPPD did finally move the power lines so construction has continued with some more leveling ahead of paving.
Planning Board
Posts: 2136
Joined: Tue Mar 09, 2004 10:44 pm
Location: Omaha
Good to see some progress... I'm sure the businesses going in at 204th & Q are anxiously awaiting the completion.
FWIW, I don't think a single tenant has signed on for the two new retail buildings at the corner of 192nd & Q St. I imagine part of that is due to the construction mess... other part is probably ridiculously high rent rates for that location.
Human Relations
Posts: 619
Joined: Thu Mar 22, 2007 12:54 am
Location: Omaha, NE
And I looked a little closer at the cameras for this project, and it looks like they might still be doing some work to bury the lines, but the overhead ones are at least gone
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
Yeah they finally removed the ones on the north side about 3 weeks ago. I periodically check the web cams and was surprised to finally see them gone one day.
They finally started grading where they were over the last couple days. There hadn't been much movement since the last snow.
Home Owners Association
Posts: 190
Joined: Sun Mar 30, 2025 11:16 pm
I drove by the other day on 204th. They’ve installed new, slightly larger signal poles at 204th and Q. It also looked like the paving of the eastbound lanes from 204th to 192nd may have been complete.
Jobbers Canyon Truther

IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
City Council
Posts: 110947
Joined: Wed Aug 04, 2004 6:07 pm
Location: Gretna NE
Any chance this is completed before 2027? 
For the record NEBUGEATER does not equal BUGEATER !!!!!!!
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
It was originally supposed to be done by the end of last year. Hopefully it will be done by this summer. I think the paving of the westbound lanes will go pretty quickly once they finish grading.
Human Relations
Posts: 619
Joined: Thu Mar 22, 2007 12:54 am
Location: Omaha, NE
Facebook tells me this is now projected for August. Absolutely ridiculous how this timeline has shifted out for a very straightforward project.
Is Harrison going to be ripped up now soon?
Is Harrison going to be ripped up now soon?
Planning Board
Posts: 2136
Joined: Tue Mar 09, 2004 10:44 pm
Location: Omaha
I was wondering the same thing because they have yard signs with QR codes on them mentioning a road construction project will begin soon. I haven't been able to scan the code when I'm driving by.
There's one sign about 2-3 blocks south of Harrison on 180th. I've also seen them on Harrison. Harrison should be 4 lanes all the way out to 204th, IMO.
Whatever they're going to tear up, I need to plan to avoid.
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
I would hope it doesn't take until August. The grading for the westbound lanes looks pretty close to where they just need to pour the cement. And the traffic signals have started to go up too.
For Harrison, are they talking 216th? It was supposed to start last August but looking at the webcam, it hasn't started yet. As for the rest of Harrison, MAPA is looking at that along with 168th:
MAPA 2026 TIP wrote: 2025-004 168th Street & Harrison Street Corridors Improvements
The project will design the 168th Street corridor from approximately V to Harrison Street and Harrison Street from 157th Street to 204th Street using the City’s Complete Streets process to identify the community’s needs, context of the area, and identify safety issues that need to be addressed. We anticipate that this will include widening of 168th Street and Harrison Street as well as providing sidewalk and/or trail access to provide connectivity, as appropriate. This project will coordinate closely with Sarpy County’s 168th St. Hwy 370 - Harrison St. project and the City’s 168th Street project from Q to Center, which is currently being constructed. This project will further determine overall project cost needs for construction and help to write an application to apply for federal funds for a shovel-ready project.
The project will include 168th Street from V Street to Harrison Street as well as Harrison Street from 156th to 204th Streets. The project will be closely coordinated with Sarpy County’s current 168th St. Hwy 370 - Harrison St. project currently funded through MAPA.
Photographer
Posts: 1036552
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE
That webcam of Harrison & 216 is in a weird spot, quite a bit west near 222nd street. Here is an aerial I took on November 3. 2025, showing the progress at 216 & Harrison.
You do not have the required permissions to view the files attached to this post.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
City Council
Posts: 110947
Joined: Wed Aug 04, 2004 6:07 pm
Location: Gretna NE
Can I see some more photos from November 6, 2026? IF the right ones are there, I might plan a trip to Vegas.
For the record NEBUGEATER does not equal BUGEATER !!!!!!!
Photographer
Posts: 1036552
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE
LOL.... 2025

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
City Council
Posts: 110947
Joined: Wed Aug 04, 2004 6:07 pm
Location: Gretna NE
Photographer
Posts: 1036552
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE
Apparently the Harrison Street portion may open later this week or early next week. Still some paving to complete on 216th Street.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
IT Director
Posts: 10003376
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha
It's now been pushed out to September. It is honestly crazy this stretch has seen such big delays.
https://www.dcengineer.org/images/2026. ... 4th_St.pdfDouglas County Engineer wrote:The anticipated completion date for our Q Street closure from 192nd Street to 204th Street has been revised to September 2026, reflecting the time required for utility relocations.
Planning Board
Posts: 2136
Joined: Tue Mar 09, 2004 10:44 pm
Location: Omaha
It’s ridiculous… it’s a mile and they’ve had the entire street closed the whole time, unlike many widening proejcts like 168th where they keep one lane open in each direction.
They said it’s due to utilities. It’s not rocket science, they knew where the utilities were before they started.
They said it’s due to utilities. It’s not rocket science, they knew where the utilities were before they started.