WallStreet Tower Omaha
-
StreetsOfOmaha
- City Council
- Posts: 6854
- Joined: Sun Feb 08, 2004 10:46 pm
WallStreet Tower Omaha
Slowest. Demo. EVER.
"The right to have access to every building in the city by private motorcar in an age when everyone possesses such a vehicle is actually the right to destroy the city."
Lewis Mumford, The Highway and the City, 1963
Lewis Mumford, The Highway and the City, 1963
-
thenewguy
- County Board
- Posts: 4455
- Joined: Sat Oct 20, 2007 2:50 am
- Location: Council Bluffs
WallStreet Tower Omaha
StreetsOfOmaha wrote:Slowest. Demo. EVER.
AMEN.
-
DTO Luv
- City Council
- Posts: 9644
- Joined: Sun Jun 06, 2004 9:22 pm
WallStreet Tower Omaha
It's actually moving along quite well.
I know I've been on 480 coming back into Omaha many times but I don't know why I never noticed until yesterday how the old UP looks from the interstate. It's quite jarring seeing the back side being demoed from up there.
I know I've been on 480 coming back into Omaha many times but I don't know why I never noticed until yesterday how the old UP looks from the interstate. It's quite jarring seeing the back side being demoed from up there.
DTO
-
Brad
- Photographer
- Posts: 1036745
- Joined: Sun Feb 29, 2004 12:03 am
- Location: Omaha, NE
WallStreet Tower Omaha
I think it is moving along fine. It will be totally gone by spring. They are doing a lot of "behind the scenes demo" so it will go fast.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
the1wags
- County Board
- Posts: 3854
- Joined: Thu Dec 02, 2004 1:43 am
- Location: Denver
WallStreet Tower Omaha
Yeah things are moving along better than what it would seem. They have been preparing parts of the roof for removal. This is due to how some of the upper floors were constructed with open spaces. They couldn't just hit a beam or a large roof section would have come crashing down. Also, they have had bobcats with jackhammer attachments running around in the building for the past couple weeks. As soon as the roof prep work is done and they come down, I suspect things will pick up quickly.
Even if they had removed the whole building by January or so, I wouldn't expect to see construction start on the new tower until springtime (March-April) anyways. I'm sure they will have the old building out by then.
Even if they had removed the whole building by January or so, I wouldn't expect to see construction start on the new tower until springtime (March-April) anyways. I'm sure they will have the old building out by then.
-
StreetsOfOmaha
- City Council
- Posts: 6854
- Joined: Sun Feb 08, 2004 10:46 pm
WallStreet Tower Omaha
Ha. I know it's moving along, guys. It's just going ridiculously slow. I don't care how much "behind the scenes" demo they're doing. When you consider that the entire tower could be up by now if they had started construction when they started demo... You start to wonder.
I'm aware that they weren't going to start construction until a certain percentage of units was reserved, anyway, so they're not in any rush to clear the site.
I'm aware that they weren't going to start construction until a certain percentage of units was reserved, anyway, so they're not in any rush to clear the site.
"The right to have access to every building in the city by private motorcar in an age when everyone possesses such a vehicle is actually the right to destroy the city."
Lewis Mumford, The Highway and the City, 1963
Lewis Mumford, The Highway and the City, 1963
-
OmahaJaysCU
- Planning Board
- Posts: 2191
- Joined: Tue Aug 30, 2005 11:00 pm
WallStreet Tower Omaha
True, but I would rather complain about how slow it is going rather than complaining about the lack of new high rises in downtown like we did...StreetsOfOmaha wrote:Slowest. Demo. EVER.
never mind, we do that anyway....
-
StreetsOfOmaha
- City Council
- Posts: 6854
- Joined: Sun Feb 08, 2004 10:46 pm
WallStreet Tower Omaha
I'd rather there were no cause for complaint. 8)
"The right to have access to every building in the city by private motorcar in an age when everyone possesses such a vehicle is actually the right to destroy the city."
Lewis Mumford, The Highway and the City, 1963
Lewis Mumford, The Highway and the City, 1963
-
icejammer
- County Board
- Posts: 3569
- Joined: Tue Oct 05, 2004 4:39 pm
- Location: Council Bluffs
WallStreet Tower Omaha
Slowest demo ever? Short of implosion, this is about as fast as one could hope for removing this structure without significant risk to neighboring structures. Let's be a little realistic here in our expectations.
"Destiny is not a matter of chance, it is a matter of choice; it is not a thing to be waited for, it is a thing to be achieved."
--William Jennings Bryan
--William Jennings Bryan
-
Brad
- Photographer
- Posts: 1036745
- Joined: Sun Feb 29, 2004 12:03 am
- Location: Omaha, NE
WallStreet Tower Omaha
like the1wags said, the top2 floors of that structure are completely different than the lower floors. once the top is removed, that thing is coming down fast.icejammer wrote:Slowest demo ever? Short of implosion, this is about as fast as one could hope for removing this structure without significant risk to neighboring structures. Let's be a little realistic here in our expectations.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
thenewguy
- County Board
- Posts: 4455
- Joined: Sat Oct 20, 2007 2:50 am
- Location: Council Bluffs
WallStreet Tower Omaha
Brad wrote:like the1wags said, the top2 floors of that structure are completely different than the lower floors. once the top is removed, that thing is coming down fast.icejammer wrote:Slowest demo ever? Short of implosion, this is about as fast as one could hope for removing this structure without significant risk to neighboring structures. Let's be a little realistic here in our expectations.
Man i hope so.... just so i can sort of get a point of reference for when we'll see the shell of this bird up, it took like 2 years from start to finish for FNB, right? I'm thinking that we could see it be up (not finished) by this time next year? Or am i off base?
-
Ben
- Parks & Recreation
- Posts: 1071
- Joined: Tue Nov 21, 2006 6:57 pm
- Location: Westside
WallStreet Tower Omaha
I'd like to add F-ing ugliest Sales Center. EVER.StreetsOfOmaha wrote:Slowest. Demo. EVER.
Especially sitting directly across from the recently refurbished 'Matt Co. Bar and Grill. It wasn't so bad when they were both trashy and under construction, but now that place just looks awful. Thank goodness its only temporary (but knowing how long its gonna take to sell that place out, temporary is a term that should be used lightly)....
-
DTO Luv
- City Council
- Posts: 9644
- Joined: Sun Jun 06, 2004 9:22 pm
WallStreet Tower Omaha
I think at some point they would have an on-site sales center in the tower.
DTO
-
adam186
- Planning Board
- Posts: 2264
- Joined: Mon Sep 06, 2004 7:29 am
- Location: Omaha
WallStreet Tower Omaha
Doubt it, considering it cost them $2.1 million to build this one feature 5 different floorplans.DTO Luv wrote:I think at some point they would have an on-site sales center in the tower.
Ben, now that they have a sales center, I think they remaining units will sell fairly quickly. Chill out, I don't think it looks that bad.
-
InvestmentBanker
- New to the Neighborhood
- Posts: 4
- Joined: Tue Nov 27, 2007 5:52 am
- Location: Omaha/Boston
WallStreet Tower Omaha
Didn't the OWH say that it would take 24-30 months to build the structure after demolition? I thought they started demo in February/March and said it would take 9 months to a year...did I miss something, or are we all just getting anxious? I can't wait for this thing!
-
Coyote
- City Council
- Posts: 34365
- Joined: Tue Nov 18, 2003 5:18 pm
- Yahoo Messenger: jestcoyote
- Location: Aksarben Village
WallStreet Tower Omaha
The last that I have heard was Demolition Completion by May 2008 - Construction completion by January-February of 2011.
-
Omaha Cowboy
- The Don
- Posts: 1013748
- Joined: Wed Jan 07, 2004 11:31 am
- Location: West Omaha
WallStreet Tower Omaha
If the Demolition is completed by January/February of 2008..And construction of the tower foundation starts by Spring of 2008, I would expect the tower to be completed by spring of 2010..
The actual time of construction will be greatly determined by whether they choose concrete or steel..If they go concrete, it will most likely extend the construction time frame by 6 months..
..Ciao..LiO....Peace
The actual time of construction will be greatly determined by whether they choose concrete or steel..If they go concrete, it will most likely extend the construction time frame by 6 months..
..Ciao..LiO....Peace
Go Cowboys!
-
HskrFanMike
- Parks & Recreation
- Posts: 1322
- Joined: Tue Jun 21, 2005 5:40 pm
WallStreet Tower Omaha
I would expect it to take several months to finish cleanup and digging the hole for the foundation before construction could begin. When they built the 1st National Tower, they blew up the Medical Arts tower at Easter and didn't start the footings until Labor Day. Right now, I'd say it will be summer 08 at the earliest before construction begins.Omaha Cowboy wrote:If the Demolition is completed by January/February of 2008..And construction of the tower foundation starts by Spring of 2008, I would expect the tower to be completed by spring of 2010....Ciao..LiO....Peace
-
adam186
- Planning Board
- Posts: 2264
- Joined: Mon Sep 06, 2004 7:29 am
- Location: Omaha
WallStreet Tower Omaha
Good point, however, they already know the construction method and everything going into this, so I'm assuming it was factor when determining a time frame.Omaha Cowboy wrote:The actual time of construction will be greatly determined by whether they choose concrete or steel..If they go concrete, it will most likely extend the construction time frame by 6 months..
-
StreetsOfOmaha
- City Council
- Posts: 6854
- Joined: Sun Feb 08, 2004 10:46 pm
WallStreet Tower Omaha
So are they doing concrete or steel? I'm guessing concrete.
"The right to have access to every building in the city by private motorcar in an age when everyone possesses such a vehicle is actually the right to destroy the city."
Lewis Mumford, The Highway and the City, 1963
Lewis Mumford, The Highway and the City, 1963
-
Erik
- Parks & Recreation
- Posts: 1540
- Joined: Wed Sep 08, 2004 5:55 am
I'll bet..
Streets, I'll bet whatever takes the longest to do, so apparently it will be concrete..
Concrete made in Thailand that gets shipped over by a ferry boat..
Concrete made in Thailand that gets shipped over by a ferry boat..
-
StreetsOfOmaha
- City Council
- Posts: 6854
- Joined: Sun Feb 08, 2004 10:46 pm
WallStreet Tower Omaha
You know they say all the best concrete comes from Thailand.
"The right to have access to every building in the city by private motorcar in an age when everyone possesses such a vehicle is actually the right to destroy the city."
Lewis Mumford, The Highway and the City, 1963
Lewis Mumford, The Highway and the City, 1963
-
SaOmaha
- Library Board
- Posts: 276
- Joined: Tue Sep 20, 2005 1:24 am
- Location: Omaha
Re: I'll bet..
I get your point.Erik wrote:Streets, I'll bet whatever takes the longest to do, so apparently it will be concrete..
Concrete made in Thailand that gets shipped over by a ferry boat..
Wet Concrete is never imported. It is made locally. The Concrete mix maybe imported
We are not building TrumpTower Chicago. At over 90 stores tall, the concrete skyscraper would be the world’s tallest of its type. When I viewed the construction by webcam, it took about a week to pour a floor.
Learn more about this tower
http://www.trumpchicago.com/
Is some way, WallStreet Tower Omaha is our version of Trump Tower Chicago without the hotel.
-
adam186
- Planning Board
- Posts: 2264
- Joined: Mon Sep 06, 2004 7:29 am
- Location: Omaha
WallStreet Tower Omaha
FYI, Concrete = aggregate mixed with cement; Cement = bonding mixture
-
InvestmentBanker
- New to the Neighborhood
- Posts: 4
- Joined: Tue Nov 27, 2007 5:52 am
- Location: Omaha/Boston
WallStreet Tower Omaha
My brother spoke to the developer today and he mentioned that it will indeed be concrete and glass, not steel. He went on to say that concrete has always been the material, and thus a part of the proposed schedule. The developer mentioned that they are on their schedule of 10-12 month demo and 2-2.5 year construction after that. If that is the case, and they started in March, I guess that means the old UP will be gone between Dec-Feb? If that is true, then building done Jan-July 2010? Thoughts?
-
almighty_tuna
- City Council
- Posts: 106423
- Joined: Tue Apr 13, 2004 6:34 pm
- Location: Somewhere between downtown and Colorado
WallStreet Tower Omaha
I think it sucks that it will take that long to build, but only because i'm impatient! I don't care what it's constructed out of, I'm just glad it's eventually going to be there.InvestmentBanker wrote:Thoughts?
-
Brad
- Photographer
- Posts: 1036745
- Joined: Sun Feb 29, 2004 12:03 am
- Location: Omaha, NE
WallStreet Tower Omaha
While debating with some fellow forum members a few weeks ago, I guessed spring 2010

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
thenewguy
- County Board
- Posts: 4455
- Joined: Sat Oct 20, 2007 2:50 am
- Location: Council Bluffs
WallStreet Tower Omaha
I just wish that they were able to give a time table of events... i.e. :
fall 2008: frame of building up
spring 2009: glass complete, work starts on ground floor units
fall 2009: 60% of units complete, residents start moving in
spring 2010: total completion, eOmaha-forumers can stop fidgeting over this project
Something like that, so we can see what the new skyline will look like
fall 2008: frame of building up
spring 2009: glass complete, work starts on ground floor units
fall 2009: 60% of units complete, residents start moving in
spring 2010: total completion, eOmaha-forumers can stop fidgeting over this project
Something like that, so we can see what the new skyline will look like
-
DTO Luv
- City Council
- Posts: 9644
- Joined: Sun Jun 06, 2004 9:22 pm
WallStreet Tower Omaha
I'm half way-half way thinking about getting a place there. Even if it's a lower floor unit, the public roof would be worth it.
DTO
-
the1wags
- County Board
- Posts: 3854
- Joined: Thu Dec 02, 2004 1:43 am
- Location: Denver
WallStreet Tower Omaha
Units start at around 200k. Your mortgage would be double what you are paying now. Plus the big tax jump. You must be planning on either....
A. Getting a new job and/or a huge raise.
B. Selling crack.
C. Eating dog food.
A. Getting a new job and/or a huge raise.
B. Selling crack.
C. Eating dog food.
-
Brad
- Photographer
- Posts: 1036745
- Joined: Sun Feb 29, 2004 12:03 am
- Location: Omaha, NE
WallStreet Tower Omaha
You never know. He called out Delicious Omaha Steaks from Upstream the other night "poor people food".the1wags wrote: C. Eating dog food.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
the1wags
- County Board
- Posts: 3854
- Joined: Thu Dec 02, 2004 1:43 am
- Location: Denver
WallStreet Tower Omaha
I took a bunch of photos of them working on removing the roof. Should have pics up this evening.
-
Big E
- City Council
- Posts: 8181
- Joined: Thu Jan 27, 2005 5:12 pm
WallStreet Tower Omaha
Selling crack isn't as lucrative as you think. See 24th and Leavenworth for proof of that.
D'Shawn strikes me as more of a designer cocaine dealer. There's real money in that.
-Big E
D'Shawn strikes me as more of a designer cocaine dealer. There's real money in that.
-Big E
Stable genius.
-
DTO Luv
- City Council
- Posts: 9644
- Joined: Sun Jun 06, 2004 9:22 pm
WallStreet Tower Omaha
the1wags wrote:Units start at around 200k. Your mortgage would be double what you are paying now.
My daddy's going to buy it for. But not my real dad, he's a |expletive|.
Well with the building not even opening for another 2-3 years alot can change. I didn't say I was going to buy it tomorrow.
DTO
-
StreetsOfOmaha
- City Council
- Posts: 6854
- Joined: Sun Feb 08, 2004 10:46 pm
WallStreet Tower Omaha
Yeah, I can't decide if I'd rather get a place at Wallstreet Tower or Old Market Center.
You haven't heard of Old Market Center? It's the amazing, mixed use, 30 story tower that's going to be announced and completed before Wallstreet. :;):
You haven't heard of Old Market Center? It's the amazing, mixed use, 30 story tower that's going to be announced and completed before Wallstreet. :;):
"The right to have access to every building in the city by private motorcar in an age when everyone possesses such a vehicle is actually the right to destroy the city."
Lewis Mumford, The Highway and the City, 1963
Lewis Mumford, The Highway and the City, 1963
-
OmahaJaysCU
- Planning Board
- Posts: 2191
- Joined: Tue Aug 30, 2005 11:00 pm
WallStreet Tower Omaha
it will also be completed before 1113 Howard as well...StreetsOfOmaha wrote:Yeah, I can't decide if I'd rather get a place at Wallstreet Tower or Old Market Center.
You haven't heard of Old Market Center? It's the amazing, mixed use, 30 story tower that's going to be announced and completed before Wallstreet. :;):
-
thenewguy
- County Board
- Posts: 4455
- Joined: Sat Oct 20, 2007 2:50 am
- Location: Council Bluffs
WallStreet Tower Omaha
Oh, how awesome that would be if it were trueStreetsOfOmaha wrote:Yeah, I can't decide if I'd rather get a place at Wallstreet Tower or Old Market Center.
You haven't heard of Old Market Center? It's the amazing, mixed use, 30 story tower that's going to be announced and completed before Wallstreet. :;):
-
the1wags
- County Board
- Posts: 3854
- Joined: Thu Dec 02, 2004 1:43 am
- Location: Denver
WallStreet Tower Omaha
Here's the pics from above on Friday. Though it seems from the ground that work has stopped, that's not the case.
As you can see, if they had just hit the beams I've marked in red, there would be a large roof section that would have collapsed. Taken about 11:30.

Here's a look at the east copper addition. You can see its the same story with how the top floors were constructed. They will need to carefully remove the roof and then things will go back to full speed.

Here's another look at the west side around 4:30. Note the removed sections of concrete roof deck.

Overview. You can see that once they get the roof problem fixed and removed, the entire structure will be about 2 floors shorter.

As you can see, if they had just hit the beams I've marked in red, there would be a large roof section that would have collapsed. Taken about 11:30.

Here's a look at the east copper addition. You can see its the same story with how the top floors were constructed. They will need to carefully remove the roof and then things will go back to full speed.

Here's another look at the west side around 4:30. Note the removed sections of concrete roof deck.

Overview. You can see that once they get the roof problem fixed and removed, the entire structure will be about 2 floors shorter.

Last edited by the1wags on Mon Dec 03, 2007 2:20 am, edited 1 time in total.
-
thenewguy
- County Board
- Posts: 4455
- Joined: Sat Oct 20, 2007 2:50 am
- Location: Council Bluffs
WallStreet Tower Omaha
Here's for hopin! It will make quite a difference, it seems, to have that section done. That would leave 10 floors left to demolish, and if you peg March 21st (first day of spring) as a reference (rough guideline for them to complete demo by spring 2008), that gives 111 days to have the whole thing down. That's 11.1 days per floor, after that... Is that feasable? I mean looking at it from the p.o.v. of 10 floors in 4 months it's doable. But on the otherside, a floor in 11 days? At this rate, it seems somewhat out of reach. I'm hoping that they just start kickin' |expletive| and have it down sometime in feb, so they can prep the ground and floors start going up by july or august
I know, i'm dreamin'.
-
MTO
- City Council
- Posts: 7783
- Joined: Wed Mar 09, 2005 5:49 pm
- Location: Dundee
WallStreet Tower Omaha
This demolition is taking FOREVER! It is such a shame we couldn't blow the dam thing up.