WallStreet Tower Omaha
-
Stargazer
- County Board
- Posts: 4183
- Joined: Sat Dec 09, 2006 5:06 pm
- Location: Bennington
WallStreet Tower Omaha
Key point... it's just a picture.
Shoot for the Moon... if you miss, you'll land among the stars.
-
DTO Luv
- City Council
- Posts: 9644
- Joined: Sun Jun 06, 2004 9:22 pm
WallStreet Tower Omaha
A family lives in a 32 story tower alone. I think that would be kind of cool in a way.
http://www.cnn.com/video/#/video/us/200 ... alone.wftx
http://www.cnn.com/video/#/video/us/200 ... alone.wftx
DTO
-
Tornado
- Home Owners Association
- Posts: 189
- Joined: Sun Aug 17, 2008 3:52 pm
- Location: West Omaha
WallStreet Tower Omaha
I've been really, really waiting for some kind of update on the new tower design or date the the city council is supposed to vote on the changes and I'll we get is DTO's family story. :lol:
-
thenewguy
- County Board
- Posts: 4458
- Joined: Sat Oct 20, 2007 2:50 am
- Location: Council Bluffs
-
MTO
- City Council
- Posts: 7783
- Joined: Wed Mar 09, 2005 5:49 pm
- Location: Dundee
WallStreet Tower Omaha
I'm already to the point where I lost all faith. So if something ever does happen I can do cartwheels.
-
annad
- Home Owners Association
- Posts: 165
- Joined: Thu Nov 08, 2007 2:46 am
- Location: Country Club
WallStreet Tower Omaha
I went to an All About Omaha happy hour today at the Wall Street Tower show rooms. There was a rep from Towsend there (scott? steve?) and they announced to our group that they met their sales goals this week, and that they have secured letters of commitment from two financiers this week as well. He said we can expect a ground breaking (or building, I suppose, since the dirt hole is definitely broken ground already) announcement within I think 60 days (90? Ben?).
I chatted with him later and he said they're very much committed to the project and very excited about Omaha. I asked him what other tenants he hoped to bring to the project and he talked about the data center thing for a while. I asked him about the Hyatt Place and he said there's actually a Plan B that he hopes happens instead - full service with some meeting space, and a "better" brand, he said - which would probably take up more space. Not sure if Hyatt would still come to the market if this falls through, but either way, sounds like it's going to happen.
Ben, what else do you remember?
I chatted with him later and he said they're very much committed to the project and very excited about Omaha. I asked him what other tenants he hoped to bring to the project and he talked about the data center thing for a while. I asked him about the Hyatt Place and he said there's actually a Plan B that he hopes happens instead - full service with some meeting space, and a "better" brand, he said - which would probably take up more space. Not sure if Hyatt would still come to the market if this falls through, but either way, sounds like it's going to happen.
Ben, what else do you remember?
-
thenewguy
- County Board
- Posts: 4458
- Joined: Sat Oct 20, 2007 2:50 am
- Location: Council Bluffs
WallStreet Tower Omaha
i hope you're right. I'd like to NOT see a data center there (unless, of course, it means actually getting it up). I'd enjoy SOMETHING downtown that will make it more viable to all those who think downtown is a desert of retail/necessities/things to make life better. Downtown needs a drug store....that sells liquor.annad wrote:I went to an All About Omaha happy hour today at the Wall Street Tower show rooms. There was a rep from Towsend there (scott? steve?) and they announced to our group that they met their sales goals this week, and that they have secured letters of commitment from two financiers this week as well. He said we can expect a ground breaking (or building, I suppose, since the dirt hole is definitely broken ground already) announcement within I think 60 days (90? Ben?).
I chatted with him later and he said they're very much committed to the project and very excited about Omaha. I asked him what other tenants he hoped to bring to the project and he talked about the data center thing for a while. I asked him about the Hyatt Place and he said there's actually a Plan B that he hopes happens instead - full service with some meeting space, and a "better" brand, he said - which would probably take up more space. Not sure if Hyatt would still come to the market if this falls through, but either way, sounds like it's going to happen.
Ben, what else do you remember?
Go Cubs Go
-
ShawJ
- Parks & Recreation
- Posts: 1573
- Joined: Wed Jan 31, 2007 11:58 pm
WallStreet Tower Omaha
Well, that's great if true. I'm certainly not ready to believe it yet though due to similar sounding stories in the past.annad wrote:I went to an All About Omaha happy hour today at the Wall Street Tower show rooms. There was a rep from Towsend there (scott? steve?) and they announced to our group that they met their sales goals this week, and that they have secured letters of commitment from two financiers this week as well. He said we can expect a ground breaking (or building, I suppose, since the dirt hole is definitely broken ground already) announcement within I think 60 days (90? Ben?).
I'm far from losing hope in this project, though.
-
mcarch
- Library Board
- Posts: 422
- Joined: Fri Jun 15, 2007 6:44 pm
- Location: Elkhorn
WallStreet Tower Omaha
Well, maybe they could do all of it... the Data Center, Plan A, and Plan B... and then build it to the original plans![/left]
-
Ben
- Parks & Recreation
- Posts: 1071
- Joined: Tue Nov 21, 2006 6:57 pm
- Location: Westside
WallStreet Tower Omaha
other details to add to AnnaD's comments:
They're actually going to contract on units, not just taking reservations. The vast majority of reservations they had have converted over to full contracts, they've had very few pull deposits back at this stage. They're currently in the process of going back to those folks that had pulled their deposits over the last year or so due to lack of a timetable and trying to get them to buy back in, and they sounded relatively optimistic they'd get a few of them back.
It WON'T be possible to add the portion of the building that was scrapped. Units that were supposed to be middles have now been fully converted to corners, and there's glass exposure all the way around the building, so no addition can be made.
As far as plans ahead, first thing was to convert the letters of commitment to actual loans and get the terms and conditions all ironed out with the banks. Secondly they've got to move forward on getting contracts with the remaining reservations and finalize the hotel plans. I think they said 60-90 days for groundbreaking, with stuff this fall being preliminary test bores and footing work, with nothing coming above ground level until the springtime. Sorry, if they said move in dates/completion, I didn't catch it.
The guy from Townsend was very positive on Omaha and the downtown renewal saying that they've had successes here that they don't think would have been possible down in KC (where they're based). They've gotten lots of support from the city, and said that there's a sense of civic pride here not found elsewhere. One of the big momentum swings they got was when the downtown ballpark actually got going on construction. Virtually all of the units on the northeast corner of the building (those with the best views of the ballpark) are already sold.
I'm now very confident that this project is actually moving forward. Excited to see that they've been able to find a way to be flexible and make things work in the current economy without sacrificing much - same height, same unit floorplans, same building amenities. Expect to see official announcements of much of this stuff within the next couple of weeks.
They're actually going to contract on units, not just taking reservations. The vast majority of reservations they had have converted over to full contracts, they've had very few pull deposits back at this stage. They're currently in the process of going back to those folks that had pulled their deposits over the last year or so due to lack of a timetable and trying to get them to buy back in, and they sounded relatively optimistic they'd get a few of them back.
It WON'T be possible to add the portion of the building that was scrapped. Units that were supposed to be middles have now been fully converted to corners, and there's glass exposure all the way around the building, so no addition can be made.
As far as plans ahead, first thing was to convert the letters of commitment to actual loans and get the terms and conditions all ironed out with the banks. Secondly they've got to move forward on getting contracts with the remaining reservations and finalize the hotel plans. I think they said 60-90 days for groundbreaking, with stuff this fall being preliminary test bores and footing work, with nothing coming above ground level until the springtime. Sorry, if they said move in dates/completion, I didn't catch it.
The guy from Townsend was very positive on Omaha and the downtown renewal saying that they've had successes here that they don't think would have been possible down in KC (where they're based). They've gotten lots of support from the city, and said that there's a sense of civic pride here not found elsewhere. One of the big momentum swings they got was when the downtown ballpark actually got going on construction. Virtually all of the units on the northeast corner of the building (those with the best views of the ballpark) are already sold.
I'm now very confident that this project is actually moving forward. Excited to see that they've been able to find a way to be flexible and make things work in the current economy without sacrificing much - same height, same unit floorplans, same building amenities. Expect to see official announcements of much of this stuff within the next couple of weeks.
Last edited by Ben on Wed Aug 05, 2009 3:55 pm, edited 1 time in total.
-
DTO Luv
- City Council
- Posts: 9644
- Joined: Sun Jun 06, 2004 9:22 pm
-
StreetsOfOmaha
- City Council
- Posts: 6854
- Joined: Sun Feb 08, 2004 10:46 pm
WallStreet Tower Omaha
Thanks Anna and Ben!!!
Those updates bring a new injection of hope and confidence. I REALLY hope there is an official announcement, with a finalized loan and construction timetable.
While we have a considerable head start, there will be a time during which WST and RFP II are going up concurrently. Along with the TD Ameritrade Park construction, that will be an impressive view coming into Downtown from Abbott Drive in 2010 and 2011!!!!
Those updates bring a new injection of hope and confidence. I REALLY hope there is an official announcement, with a finalized loan and construction timetable.
While we have a considerable head start, there will be a time during which WST and RFP II are going up concurrently. Along with the TD Ameritrade Park construction, that will be an impressive view coming into Downtown from Abbott Drive in 2010 and 2011!!!!
"The right to have access to every building in the city by private motorcar in an age when everyone possesses such a vehicle is actually the right to destroy the city."
Lewis Mumford, The Highway and the City, 1963
Lewis Mumford, The Highway and the City, 1963
-
Stargazer
- County Board
- Posts: 4183
- Joined: Sat Dec 09, 2006 5:06 pm
- Location: Bennington
WallStreet Tower Omaha
Wow, I wouldn't have expected to have heard anything like this from a salesperson.The guy from Townsend was very positive on Omaha and the downtown renewal saying that they've had successes here that they don't think would have been possible down in KC (where they're based).
I do still have my fingers crossed.
Shoot for the Moon... if you miss, you'll land among the stars.
-
justnick
- Human Relations
- Posts: 892
- Joined: Mon Sep 01, 2008 8:47 pm
- Location: Downtown
WallStreet Tower Omaha
Optimism, Yay!
-
Big E
- City Council
- Posts: 8184
- Joined: Thu Jan 27, 2005 5:12 pm
-
MTO
- City Council
- Posts: 7783
- Joined: Wed Mar 09, 2005 5:49 pm
- Location: Dundee
WallStreet Tower Omaha
It's just to bad the building turned out so skinny I hope that doesn't diminish it's over all presents on the skyline. But alright! we are getting a tower crane soon.
-
DTO Luv
- City Council
- Posts: 9644
- Joined: Sun Jun 06, 2004 9:22 pm
WallStreet Tower Omaha
I think with it being more slender it will actually look taller. Especially next to UPC. It will like like a giraffe next to an elephant.
DTO
-
annad
- Home Owners Association
- Posts: 165
- Joined: Thu Nov 08, 2007 2:46 am
- Location: Country Club
WallStreet Tower Omaha
Can't tell how sarcastic you're being here about the sales pitch, Stargazer, but I will say, I honestly don't think he was being sales-y when we were chatting. Sure, he has a job to do in representing his company and making everyone feel all happy, but he truly seemed to have an appreciation for Omaha and our general awesomeness.Stargazer wrote:Wow, I wouldn't have expected to have heard anything like this from a salesperson.The guy from Townsend was very positive on Omaha and the downtown renewal saying that they've had successes here that they don't think would have been possible down in KC (where they're based).
I do still have my fingers crossed.
-
Garrett
- County Board
- Posts: 4768
- Joined: Thu Nov 27, 2008 12:29 am
- Location: New York City
WallStreet Tower Omaha
It almost sounds like a Hyatt Regency but I would think the a separate tower for that, wonder what is would be.annad wrote: I asked him about the Hyatt Place and he said there's actually a Plan B that he hopes happens instead - full service with some meeting space, and a "better" brand, he said - which would probably take up more space. Not sure if Hyatt would still come to the market if this falls through, but either way, sounds like it's going to happen.
Ben, what else do you remember?
OMA-->CHI-->NYC
-
Bobcat
- Home Owners Association
- Posts: 154
- Joined: Thu Dec 07, 2006 8:34 pm
- Location: Downtown Omaha
WallStreet Tower Omaha
Townsend Company couldn't pull this project off when the good times were rollin'. It would be awesome to see them pull it off during a recession. If it happens it would be one of the only high rise / tower condo projects to break ground and be completed in the entire world since the economic crisis began in late 2007.
-
icejammer
- County Board
- Posts: 3569
- Joined: Tue Oct 05, 2004 4:39 pm
- Location: Council Bluffs
WallStreet Tower Omaha
Considering the old UP building wasn't cleared from the site until mid-2008, can you honestly say that the good times were "rolling'" when they were trying to pull this off?Bobcat wrote:Townsend Company couldn't pull this project off when the good times were rollin'. It would be awesome to see them pull it off during a recession. If it happens it would be one of the only high rise / tower condo projects to break ground and be completed in the entire world since the economic crisis began in late 2007.
"Destiny is not a matter of chance, it is a matter of choice; it is not a thing to be waited for, it is a thing to be achieved."
--William Jennings Bryan
--William Jennings Bryan
-
MTO
- City Council
- Posts: 7783
- Joined: Wed Mar 09, 2005 5:49 pm
- Location: Dundee
WallStreet Tower Omaha
Are we supposed to read between some lines and see that plan B is another building with a dedicated hotel?
-
Bobcat
- Home Owners Association
- Posts: 154
- Joined: Thu Dec 07, 2006 8:34 pm
- Location: Downtown Omaha
WallStreet Tower Omaha
Please see my post on page 64 of this thread:icejammer wrote:Considering the old UP building wasn't cleared from the site until mid-2008, can you honestly say that the good times were "rolling'" when they were trying to pull this off?Bobcat wrote:Townsend Company couldn't pull this project off when the good times were rollin'. It would be awesome to see them pull it off during a recession. If it happens it would be one of the only high rise / tower condo projects to break ground and be completed in the entire world since the economic crisis began in late 2007.
"Prior to awarding the RFP the city said the following, found on page 12 of this thread:
"The developer must begin construction within six months of the successful negotiation and execution of a redevelopment agreement."
And then a quote from Townsend in the OWH on 12.14.05:
"Construction would begin in the spring or summer of 2007 and be completed in the spring or summer of 2009.""
-
icejammer
- County Board
- Posts: 3569
- Joined: Tue Oct 05, 2004 4:39 pm
- Location: Council Bluffs
WallStreet Tower Omaha
Hey, see my reply to your post about this a few months back. Construction couldn't have started in 2007, as the City hadn't closed the deal with Townsend (at no fault to Townshend, as far as we know) until late 2007. Care to explain how completion could have been accomplished by 2009, given the circumstances that unfolded?Bobcat wrote:Please see my post on page 64 of this thread:icejammer wrote:Considering the old UP building wasn't cleared from the site until mid-2008, can you honestly say that the good times were "rolling'" when they were trying to pull this off?Bobcat wrote:Townsend Company couldn't pull this project off when the good times were rollin'. It would be awesome to see them pull it off during a recession. If it happens it would be one of the only high rise / tower condo projects to break ground and be completed in the entire world since the economic crisis began in late 2007.
"Prior to awarding the RFP the city said the following, found on page 12 of this thread:
"The developer must begin construction within six months of the successful negotiation and execution of a redevelopment agreement."
And then a quote from Townsend in the OWH on 12.14.05:
"Construction would begin in the spring or summer of 2007 and be completed in the spring or summer of 2009.""
"Destiny is not a matter of chance, it is a matter of choice; it is not a thing to be waited for, it is a thing to be achieved."
--William Jennings Bryan
--William Jennings Bryan
-
Bobcat
- Home Owners Association
- Posts: 154
- Joined: Thu Dec 07, 2006 8:34 pm
- Location: Downtown Omaha
WallStreet Tower Omaha
Icejammer: The article below is from Feb. 07. Notice the last sentence by the developer. Townsend and company clearly are in need of a lesson on how to deal with the media. The developer really needs to do the explaning here, not the forumers. Sales should have started immediately after the RFP was awarded. In 2005, condo projects in St. Louis were selling out with just floor plans and handouts, not to mention long lines forming for the lotteries. The company missed a huge opportunity all which would have cost very little, certainly less than a $4m sales office that took forever to materialize and still hasn't accomplished the same goals.
When this article ran in the OWH Townsend was still claiming 2009 and then quickly changed it to 2011.
I have to give the developers credit for securing the property and wedging themselves in the middle, all based off of very little track record and no track record of building new condominium buildings. At this point I really think the area should be graded and possibly made into a park and then put up for sale, hopefully to a corporation. Townsend can break even and the right tenant can make something happen with this fantastic piece of land.
When this article ran in the OWH Townsend was still claiming 2009 and then quickly changed it to 2011.
I have to give the developers credit for securing the property and wedging themselves in the middle, all based off of very little track record and no track record of building new condominium buildings. At this point I really think the area should be graded and possibly made into a park and then put up for sale, hopefully to a corporation. Townsend can break even and the right tenant can make something happen with this fantastic piece of land.
Brad wrote:Demolition of U.P. building will begin inside
http://www.omaha.com/index.php?u_page=1 ... id=2339305
Aside from some concrete barricades and orange construction barrels, evidence of demolition of the former Union Pacific headquarters in downtown Omaha still will be difficult to detect for a while.
The long-awaited 32-story condominium project will become Omaha's third-tallest building, behind First National Tower and the Woodmen Tower. Some $600 million has been invested in new construction in several blocks of downtown over the last few years.
When Mayor Mike Fahey chose the tower project more than two years ago over a competing proposal, he praised it as a development that would enhance the city's skyline and build on downtown's momentum.
A spokesman for the project's developer said he is eager to see activity humming at the WallStreet site, if only to reassure Omahans the project is real.
One-third of the building's 275 units are reserved.
The city requires that asbestos work be completed within 90 days and that all demolition be finished by May 2008, but Townsend intends to work more quickly: 60 days for asbestos removal with the entire building down by the end of October.
"We're as excited as anybody to get this started," said Troy Strawhecker, Townsend's Des Moines-based lead developer for the WallStreet project. "The building is ours now. We're going to go full speed ahead."
Imploding the 14-story building hasn't been ruled out.
-
MTO
- City Council
- Posts: 7783
- Joined: Wed Mar 09, 2005 5:49 pm
- Location: Dundee
WallStreet Tower Omaha
It kind of makes me wonder what would the block look like if Townsend never got it. Well at least he is red faced for now but he deserves worse for dragging the community on like this.
-
icejammer
- County Board
- Posts: 3569
- Joined: Tue Oct 05, 2004 4:39 pm
- Location: Council Bluffs
WallStreet Tower Omaha
Well, so far you haven't answered any of my questions, so I will assume that you have no rebuttal, and really just have an ax to grind with Townshend, for whatever reason. The timing on this project ran into a downward trend in demand that goes back to the late 2006; I really don't think you can blame Townshend for that, that's the hand they've been dealt, and bitching about it doesn't accomplish anything. And just what does St. Louis condo sales have to do with Omaha condo sales?Bobcat wrote:Icejammer: The article below is from Feb. 07. Notice the last sentence by the developer. Townsend and company clearly are in need of a lesson on how to deal with the media. The developer really needs to do the explaning here, not the forumers. Sales should have started immediately after the RFP was awarded. In 2005, condo projects in St. Louis were selling out with just floor plans and handouts, not to mention long lines forming for the lotteries. The company missed a huge opportunity all which would have cost very little, certainly less than a $4m sales office that took forever to materialize and still hasn't accomplished the same goals.
"Destiny is not a matter of chance, it is a matter of choice; it is not a thing to be waited for, it is a thing to be achieved."
--William Jennings Bryan
--William Jennings Bryan
-
Bobcat
- Home Owners Association
- Posts: 154
- Joined: Thu Dec 07, 2006 8:34 pm
- Location: Downtown Omaha
WallStreet Tower Omaha
Icejammer, I haven’t seen any questions in your posts, but will start with this. You claim that the agreement between city and Townsend didn’t close until late 2007, but as you can read from the article I posted above the agreement was closed by Feb. 2007 and possibly even January.
Construction on a project like this can take 2 years resulting in an 09 finish as was originally promised. It wasn’t started in 07 because, just as Townsend has been claiming for years, the pre sales benchmark hasn’t been achieved. Why? Because they did not market the project in 2005 when condo sales where booming (please see my St. Louis analogy). The market also does not care for a Celebrity style home placed into an architecturally boring 32 story tower.
In case you still aren’t clear on the explanation: completion could have easily been accomplished by 2009 by blowiing the sales threshold out of the water which could have easily happened soon after the RFP was awarded. A pre sell out could have occurred, as they were in new condo projects in markets all across the U.S. in 2005, with a $15,000 to $20,000 sales and marketing blitz effort. Instead the momentum floundered and sales didn’t start until, as you pointed out, a weakening demand had set in.
Construction on a project like this can take 2 years resulting in an 09 finish as was originally promised. It wasn’t started in 07 because, just as Townsend has been claiming for years, the pre sales benchmark hasn’t been achieved. Why? Because they did not market the project in 2005 when condo sales where booming (please see my St. Louis analogy). The market also does not care for a Celebrity style home placed into an architecturally boring 32 story tower.
In case you still aren’t clear on the explanation: completion could have easily been accomplished by 2009 by blowiing the sales threshold out of the water which could have easily happened soon after the RFP was awarded. A pre sell out could have occurred, as they were in new condo projects in markets all across the U.S. in 2005, with a $15,000 to $20,000 sales and marketing blitz effort. Instead the momentum floundered and sales didn’t start until, as you pointed out, a weakening demand had set in.
-
HskrFanMike
- Parks & Recreation
- Posts: 1322
- Joined: Tue Jun 21, 2005 5:40 pm
WallStreet Tower Omaha
A 2009 completion was never possible, as the original plan didn't set a realistic plan for demolition of the old UP building. I believe they originally predicted 3 months total. Instead, demolition took about a year and a half due to asbestos remediation, and they haven't even begun site preparation. A good sales push would have had the building well underway by now, but no where near completion.Bobcat wrote:Icejammer, I haven’t seen any questions in your posts, but will start with this. You claim that the agreement between city and Townsend didn’t close until late 2007, but as you can read from the article I posted above the agreement was closed by Feb. 2007 and possibly even January.
Construction on a project like this can take 2 years resulting in an 09 finish as was originally promised. It wasn’t started in 07 because, just as Townsend has been claiming for years, the pre sales benchmark hasn’t been achieved. Why? Because they did not market the project in 2005 when condo sales where booming (please see my St. Louis analogy). The market also does not care for a Celebrity style home placed into an architecturally boring 32 story tower.
In case you still aren’t clear on the explanation: completion could have easily been accomplished by 2009 by blowiing the sales threshold out of the water which could have easily happened soon after the RFP was awarded. A pre sell out could have occurred, as they were in new condo projects in markets all across the U.S. in 2005, with a $15,000 to $20,000 sales and marketing blitz effort. Instead the momentum floundered and sales didn’t start until, as you pointed out, a weakening demand had set in.
-
icejammer
- County Board
- Posts: 3569
- Joined: Tue Oct 05, 2004 4:39 pm
- Location: Council Bluffs
WallStreet Tower Omaha
If that's the case and there was all this demand in Omaha, why didn't other condo projects take off and fly with pre-sells in this time frame? The only one that did well was Riverfront Place. Most of the other condo projects downtown are in the same boat as Wallstreet - the only difference being the others were rehabs of existing property, if they had to build new, they would be sitting the same way. How is that the developers fault that demand tanked just as they were kicking things off?Bobcat wrote:In case you still aren’t clear on the explanation: completion could have easily been accomplished by 2009 by blowiing the sales threshold out of the water which could have easily happened soon after the RFP was awarded. A pre sell out could have occurred, as they were in new condo projects in markets all across the U.S. in 2005, with a $15,000 to $20,000 sales and marketing blitz effort. Instead the momentum floundered and sales didn’t start until, as you pointed out, a weakening demand had set in.
"Destiny is not a matter of chance, it is a matter of choice; it is not a thing to be waited for, it is a thing to be achieved."
--William Jennings Bryan
--William Jennings Bryan
-
Bobcat
- Home Owners Association
- Posts: 154
- Joined: Thu Dec 07, 2006 8:34 pm
- Location: Downtown Omaha
WallStreet Tower Omaha
Riverfront did well because it was developed by experienced developers that had a keen understanding of the market. They didn’t flood the market with more than 200 condos. They built what the market could support (just 36 or so). They also had a better-designed product that wasn’t directly out of the Celebrity home catalog. The developers also did what they said they would do and met the dates that they laid out at the beginning of the project. This is in stark contrast to the approach Townsend has taken with the Wall Street Tower.icejammer wrote:
If that's the case and there was all this demand in Omaha, why didn't other condo projects take off and fly with pre-sells in this time frame? The only one that did well was Riverfront Place.
Most of the other condo projects downtown are in the same boat as Wallstreet - the only difference being the others were rehabs of existing property, if they had to build new, they would be sitting the same way.
Disagree completely. The rehabs (Paxton, Beebe Runyan, 1101 Jackson) are completed and people are living in them. The project costs for the rehabs were substantial and the developments were seen through to fruition. Please see Jlofts and the Lofts at Soma for examples of new projects that are being completed and/or constructed during weakening demand. Why and how? Well, I think I’ve answered those questions in this post.
Of course it’s not the fault of the developers that demand has “tanked”. It is the developer’s fault that they didn’t kick off sales during a more robust sales period – when the RFP was awarded. It is also their fault that they misjudged the market completely with both the number of condos they introduced and the product they are proposing for the site. Please read the RFP that was submitted by Townsend. Not a market study in site or experience developing new condo towers.How is that the developers fault that demand tanked just as they were kicking things off?
-
DTO Luv
- City Council
- Posts: 9644
- Joined: Sun Jun 06, 2004 9:22 pm
-
Stargazer
- County Board
- Posts: 4183
- Joined: Sat Dec 09, 2006 5:06 pm
- Location: Bennington
WallStreet Tower Omaha
Nice. Did you use that zip line to get over there?
Shoot for the Moon... if you miss, you'll land among the stars.
-
Big E
- City Council
- Posts: 8184
- Joined: Thu Jan 27, 2005 5:12 pm
WallStreet Tower Omaha
New and re- sale prices in SoMa have dropped dramatically, by the way. There's still the same demand for $500K condos. People are just paying $400K for them now.Bobcat wrote:Please see Jlofts and the Lofts at Soma for examples of new projects that are being completed and/or constructed during weakening demand. Why and how? Well, I think I’ve answered those questions in this post.
Stable genius.
-
DTO Luv
- City Council
- Posts: 9644
- Joined: Sun Jun 06, 2004 9:22 pm
WallStreet Tower Omaha
Thanks.Stargazer wrote:Nice. Did you use that zip line to get over there?
DTO
-
StreetsOfOmaha
- City Council
- Posts: 6854
- Joined: Sun Feb 08, 2004 10:46 pm
WallStreet Tower Omaha
Interesting. RFP Tower II prices are going up at the end of this month.Big E wrote:New and re- sale prices in SoMa have dropped dramatically, by the way. There's still the same demand for $500K condos. People are just paying $400K for them now.Bobcat wrote:Please see Jlofts and the Lofts at Soma for examples of new projects that are being completed and/or constructed during weakening demand. Why and how? Well, I think I’ve answered those questions in this post.
"The right to have access to every building in the city by private motorcar in an age when everyone possesses such a vehicle is actually the right to destroy the city."
Lewis Mumford, The Highway and the City, 1963
Lewis Mumford, The Highway and the City, 1963
-
Tornado
- Home Owners Association
- Posts: 189
- Joined: Sun Aug 17, 2008 3:52 pm
- Location: West Omaha
WallStreet Tower Omaha
DTO...............thanks for the shot, looks really cool. The WST from that angle really seems to balance out the skyline. I'm not sure if the height is a tad exaggerated or not but it looks fairly close to what is should look like.
-
Erik
- Parks & Recreation
- Posts: 1540
- Joined: Wed Sep 08, 2004 5:55 am
WallStreet Tower Omaha
Next time a downtown condo scraper is announced, I promise to not get excited for half a decade later.
-
MTO
- City Council
- Posts: 7783
- Joined: Wed Mar 09, 2005 5:49 pm
- Location: Dundee
WallStreet Tower Omaha
According to DTO's picture the wallstreet tower is a night walker, no reflection. spooky
15-17, 26, 32
-
mcarch
- Library Board
- Posts: 422
- Joined: Fri Jun 15, 2007 6:44 pm
- Location: Elkhorn
WallStreet Tower Omaha
The building itself should have been taller/bigger. His pic. is great, prob. spot on.