Capitol District (NWC 10th & Capitol)
-
MTO
- City Council
- Posts: 7783
- Joined: Wed Mar 09, 2005 5:49 pm
- Location: Dundee
-
RNcyanide
- Planning Board
- Posts: 2778
- Joined: Thu Mar 28, 2013 3:37 pm
- Location: Boston
Re: Official: Shamrock Development (10th and Capitol)
60-90 days?GetUrban wrote:Talked with someone directly involved again this morning. He said the contract is being finalized/signed and it will start any day now. He also said the hotel still has the original 330-350 rooms but there have been some changes to the exterior materials...nothing specific given as far as exactly what changed. Not to worry. That's all I've got for now.
When fortune smiles on something as violent and ugly as revenge, it seems proof like no other that not only does God exist, you're doing his will.
The Bride
The Bride
-
Bob from Omaha
- Planning Board
- Posts: 3079
- Joined: Wed Sep 08, 2004 8:00 pm
- Location: Metro Detroit Michigan
Re: Official: Shamrock Development (10th and Capitol)
Nope... 2 or three monthsRNcyanide wrote:60-90 days?GetUrban wrote:Talked with someone directly involved again this morning. He said the contract is being finalized/signed and it will start any day now. He also said the hotel still has the original 330-350 rooms but there have been some changes to the exterior materials...nothing specific given as far as exactly what changed. Not to worry. That's all I've got for now.
-
MadMartin8
- Planning Board
- Posts: 2958
- Joined: Sun Mar 11, 2012 5:48 pm
- Location: Beyond Thunderdome
Re: Official: Shamrock Development (10th and Capitol)
I'm hearing 1440 to 2160 hours.Bob from Omaha wrote:Nope... 2 or three monthsRNcyanide wrote:60-90 days?GetUrban wrote:Talked with someone directly involved again this morning. He said the contract is being finalized/signed and it will start any day now. He also said the hotel still has the original 330-350 rooms but there have been some changes to the exterior materials...nothing specific given as far as exactly what changed. Not to worry. That's all I've got for now.
No posts exist for this topic
-
GetUrban
- Planning Board
- Posts: 2650
- Joined: Sun Nov 23, 2008 9:07 pm
- Location: Omaha
Re: Official: Shamrock Development (10th and Capitol)
Sorry for the good news!
He said "They are some big, ugly red brick buildings"
...and then they were gone.
...and then they were gone.
-
BRoss
- IT Director
- Posts: 10003423
- Joined: Sat Aug 05, 2006 12:39 am
- Location: West Central Omaha
Re: Official: Shamrock Development (10th and Capitol)
Sounds more like 60-90 hours. That would be great to see this thing finally kick off.
-
MadMartin8
- Planning Board
- Posts: 2958
- Joined: Sun Mar 11, 2012 5:48 pm
- Location: Beyond Thunderdome
Re: Official: Shamrock Development (10th and Capitol)
Are you hearing things as well?HR Paperstacks wrote:Sounds more like 60-90 hours. That would be great to see this thing finally kick off.
No posts exist for this topic
-
OmahaJaysCU
- Planning Board
- Posts: 2191
- Joined: Tue Aug 30, 2005 11:00 pm
Re: Official: Shamrock Development (10th and Capitol)
To further my comment the other day, sounds like the reason we haven't seen any progress is closing on the site. Obviously, you need to have financing locked up in order to do so, but once closed expect progress almost immediately.
Let's keep our fingers crossed. We're right there!
Let's keep our fingers crossed. We're right there!
-
BRoss
- IT Director
- Posts: 10003423
- Joined: Sat Aug 05, 2006 12:39 am
- Location: West Central Omaha
Re: Official: Shamrock Development (10th and Capitol)
No, I'm just basing this off of what GetUrban said.MadMartin8 wrote:Are you hearing things as well?HR Paperstacks wrote:Sounds more like 60-90 hours. That would be great to see this thing finally kick off.
-
S33
- County Board
- Posts: 4430
- Joined: Wed May 07, 2008 5:15 pm
Re: Official: Shamrock Development (10th and Capitol)
TIF and their main anchor tenant, the hotel, were supposedly squared away in 2013. Then there was 2.5 years of delay in acquiring financing, and suddenly Shamrock is waiting on a signature.
Right... I'm guessing there are some serious issues with finding someone to bankroll this project, and I wouldn't bet a penny that we see progress before the CWS.
Right... I'm guessing there are some serious issues with finding someone to bankroll this project, and I wouldn't bet a penny that we see progress before the CWS.
Socialism is a philosophy of failure, the creed of ignorance, and the gospel of envy, its inherent virtue is the equal sharing of misery. - Winston Churchill
-
Coyote
- City Council
- Posts: 34365
- Joined: Tue Nov 18, 2003 5:18 pm
- Yahoo Messenger: jestcoyote
- Location: Aksarben Village
Re: Official: Shamrock Development (10th and Capitol)
They have been looking at EB-5 financing since the beginning.
-
S33
- County Board
- Posts: 4430
- Joined: Wed May 07, 2008 5:15 pm
Re: Official: Shamrock Development (10th and Capitol)
So this entire development is being financed by tax-payers and foreign investors? That's not a rhetorical question, I seriously do not know. Haven't been able to really follow this stuff in a long timeCoyote wrote:They have been looking at EB-5 financing since the beginning.
Socialism is a philosophy of failure, the creed of ignorance, and the gospel of envy, its inherent virtue is the equal sharing of misery. - Winston Churchill
-
OmahaJaysCU
- Planning Board
- Posts: 2191
- Joined: Tue Aug 30, 2005 11:00 pm
Re: Official: Shamrock Development (10th and Capitol)
I think the EB5 went away...could be wrong.S33 wrote:So this entire development is being financed by tax-payers and foreign investors? That's not a rhetorical question, I seriously do not know. Haven't been able to really follow this stuff in a long timeCoyote wrote:They have been looking at EB-5 financing since the beginning.
-
Bobcat
- Home Owners Association
- Posts: 154
- Joined: Thu Dec 07, 2006 8:34 pm
- Location: Downtown Omaha
Re: Official: Shamrock Development (10th and Capitol)
No surprise there hasn't been an update from the developer since the groundbreaking covered by all of the local media outlets 10 months ago.
-
RNcyanide
- Planning Board
- Posts: 2778
- Joined: Thu Mar 28, 2013 3:37 pm
- Location: Boston
Re: Official: Shamrock Development (10th and Capitol)
As long as we don't make out like Cordish and Kansas City, at this point I'm fine with however they finance it.S33 wrote:So this entire development is being financed by tax-payers and foreign investors? That's not a rhetorical question, I seriously do not know. Haven't been able to really follow this stuff in a long timeCoyote wrote:They have been looking at EB-5 financing since the beginning.
When fortune smiles on something as violent and ugly as revenge, it seems proof like no other that not only does God exist, you're doing his will.
The Bride
The Bride
-
RebelHeart
- New to the Neighborhood
- Posts: 3
- Joined: Thu Jan 29, 2015 7:11 pm
Re: Official: Shamrock Development (10th and Capitol)
Hi everyone! Forgive me as I have not had time to read through this entire thread so if the answer to my question is in there I apologize. I am just wondering if the 'Lanoha Tower' highrise is still in the works? I haven't seen any updated press releases or anything current on google, yet I see it mentioned in this thread. Any updates? Will it still be as high as the renderings from early 2014? Thank you.
-
RNcyanide
- Planning Board
- Posts: 2778
- Joined: Thu Mar 28, 2013 3:37 pm
- Location: Boston
Re: Official: Shamrock Development (10th and Capitol)
Welcome!RebelHeart wrote:Hi everyone! Forgive me as I have not had time to read through this entire thread so if the answer to my question is in there I apologize. I am just wondering if the 'Lanoha Tower' highrise is still in the works? I haven't seen any updated press releases or anything current on google, yet I see it mentioned in this thread. Any updates? Will it still be as high as the renderings from early 2014? Thank you.
Lanoha is more of proposal than anything at the moment. Aside from running the ideas past the city and the paper, nothing more has been put toward it. The Civic redevelopment has more legs than this thing at the moment.
See this thread for more:
http://www.eomahaforums.com/viewtopic.p ... hilit=1416
When fortune smiles on something as violent and ugly as revenge, it seems proof like no other that not only does God exist, you're doing his will.
The Bride
The Bride
-
realestate_zach
- New to the Neighborhood
- Posts: 31
- Joined: Fri Oct 31, 2014 2:40 pm
Re: Official: Shamrock Development (10th and Capitol)
EB-5 is used to "bridge the gap" between hotel's bank financing of 50%-60% and the principal investor capital contributed. It is pretty difficult to find a single investor (or small group of investors) to bring $30-$40Million to the table for a large scale hotel project like this. The TIF will be a portion of the equity as will the EB-5 money and capital from the developer. The last project of this scale in downtown, the Hilton, from my understanding was financed using public bonds. That hotel went up relatively easily as municipal bonds are readily marketable, the Shamrock Project is a larger scale than the Hilton and have thus had to get a bit more creative with the financing. So as a long answer to your question, the development is not being entirely financed by foreign investors, the EB-5 will only be for the hotel portion of the project. There will be relatively typical bank financing involved in addition to the TIF funds and EB-5 money. In my recent discussions with the developer, this project is moving forward and keeping the Shamrock folks pretty busy.S33 wrote:So this entire development is being financed by tax-payers and foreign investors? That's not a rhetorical question, I seriously do not know. Haven't been able to really follow this stuff in a long timeCoyote wrote:They have been looking at EB-5 financing since the beginning.
Apartment developers are the worst.
-
MTO
- City Council
- Posts: 7783
- Joined: Wed Mar 09, 2005 5:49 pm
- Location: Dundee
Re: Official: Shamrock Development (10th and Capitol)
Next week, right guys? I mean they're signing papers now could see something any day now, any day.


15-17, 26, 32
-
RNcyanide
- Planning Board
- Posts: 2778
- Joined: Thu Mar 28, 2013 3:37 pm
- Location: Boston
Re: Official: Shamrock Development (10th and Capitol)
Patience, padawan.MTO wrote:Next week, right guys? I mean they're signing papers now could see something any day now, any day.
When fortune smiles on something as violent and ugly as revenge, it seems proof like no other that not only does God exist, you're doing his will.
The Bride
The Bride
-
EastCB
- Library Board
- Posts: 390
- Joined: Thu Oct 05, 2006 4:30 pm
- Location: Council Bluffs
Re: Official: Shamrock Development (10th and Capitol)
So juvenile. MTO, put up the money or keep your mouth shut.
-
GetUrban
- Planning Board
- Posts: 2650
- Joined: Sun Nov 23, 2008 9:07 pm
- Location: Omaha
Re: Official: Shamrock Development (10th and Capitol)
I'm going to stop asking. It will be more fun to just be surprised.
Must be some national register of parking lots group fighting it tooth and nail behind the scenes.
Must be some national register of parking lots group fighting it tooth and nail behind the scenes.
He said "They are some big, ugly red brick buildings"
...and then they were gone.
...and then they were gone.
-
MadMartin8
- Planning Board
- Posts: 2958
- Joined: Sun Mar 11, 2012 5:48 pm
- Location: Beyond Thunderdome
Re: Official: Shamrock Development (10th and Capitol)
I wonder, looking back in the depths of this thread how many times we have heard it's going to happen "soon"? Perhaps that explains the cynic attitude.
Also, MTO should shut up or put up the money? That's pretty juvenile as well...
Also, MTO should shut up or put up the money? That's pretty juvenile as well...
No posts exist for this topic
-
RNcyanide
- Planning Board
- Posts: 2778
- Joined: Thu Mar 28, 2013 3:37 pm
- Location: Boston
Re: Official: Shamrock Development (10th and Capitol)
Maybe it would be better for the developers to keep a tighter lip and not give any confirmations about progress until all I's have been dotted and T's have been crossed. It might be torture for people like us, but it would be better for their image overall.MadMartin8 wrote:I wonder, looking back in the depths of this thread how many times we have heard it's going to happen "soon"? Perhaps that explains the cynic attitude.
Also, MTO should shut up or put up the money? That's pretty juvenile as well...
When fortune smiles on something as violent and ugly as revenge, it seems proof like no other that not only does God exist, you're doing his will.
The Bride
The Bride
-
MadMartin8
- Planning Board
- Posts: 2958
- Joined: Sun Mar 11, 2012 5:48 pm
- Location: Beyond Thunderdome
Re: Official: Shamrock Development (10th and Capitol)
Their biggest mistep was the "groundbreaking" without breaking any ground. All of the other stuff is just us being overactive in our "hearing" things.RNcyanide wrote:Maybe it would be better for the developers to keep a tighter lip and not give any confirmations about progress until all I's have been dotted and T's have been crossed. It might be torture for people like us, but it would be better for their image overall.MadMartin8 wrote:I wonder, looking back in the depths of this thread how many times we have heard it's going to happen "soon"? Perhaps that explains the cynic attitude.
Also, MTO should shut up or put up the money? That's pretty juvenile as well...
All I know is that until I see construction equipment, this project is just a hope and a dream... A Wall Street tower. No sense in sweating about it or hand wringing.
No posts exist for this topic
-
RNcyanide
- Planning Board
- Posts: 2778
- Joined: Thu Mar 28, 2013 3:37 pm
- Location: Boston
Re: Official: Shamrock Development (10th and Capitol)
Even WallStreet at least got a hole in the ground before they called it quitsies.
When fortune smiles on something as violent and ugly as revenge, it seems proof like no other that not only does God exist, you're doing his will.
The Bride
The Bride
-
GetUrban
- Planning Board
- Posts: 2650
- Joined: Sun Nov 23, 2008 9:07 pm
- Location: Omaha
Re: Official: Shamrock Development (10th and Capitol)
The Wallstreet hole was only there because the old UP building was demo'd, which the city paid for.
Even after all contracts are signed, it comes down to exactly when the general contractor and subs want to schedule and mobilize crews.
Even after all contracts are signed, it comes down to exactly when the general contractor and subs want to schedule and mobilize crews.
He said "They are some big, ugly red brick buildings"
...and then they were gone.
...and then they were gone.
-
RNcyanide
- Planning Board
- Posts: 2778
- Joined: Thu Mar 28, 2013 3:37 pm
- Location: Boston
Re: Official: Shamrock Development (10th and Capitol)
So assuming all is getting the green light, they probably won't start until the weather is a little better.GetUrban wrote:The Wallstreet hole was only there because the old UP building was demo'd, which the city paid for.
Even after all contracts are signed, it comes down to exactly when the general contractor and subs want to schedule and mobilize crews.
When fortune smiles on something as violent and ugly as revenge, it seems proof like no other that not only does God exist, you're doing his will.
The Bride
The Bride
-
GetUrban
- Planning Board
- Posts: 2650
- Joined: Sun Nov 23, 2008 9:07 pm
- Location: Omaha
Re: Official: Shamrock Development (10th and Capitol)
The weather could be a minor factor, but it's probably more a factor of pulling workers off of other work they already have going on, or finishing that work first, since in this region, I doubt many crews are sitting around waiting for something to do.
He said "They are some big, ugly red brick buildings"
...and then they were gone.
...and then they were gone.
-
S33
- County Board
- Posts: 4430
- Joined: Wed May 07, 2008 5:15 pm
Re: Official: Shamrock Development (10th and Capitol)
Thanks for the info.realestate_zach wrote:
EB-5 is used to "bridge the gap" between hotel's bank financing of 50%-60% and the principal investor capital contributed. It is pretty difficult to find a single investor (or small group of investors) to bring $30-$40Million to the table for a large scale hotel project like this. The TIF will be a portion of the equity as will the EB-5 money and capital from the developer. The last project of this scale in downtown, the Hilton, from my understanding was financed using public bonds. That hotel went up relatively easily as municipal bonds are readily marketable, the Shamrock Project is a larger scale than the Hilton and have thus had to get a bit more creative with the financing. So as a long answer to your question, the development is not being entirely financed by foreign investors, the EB-5 will only be for the hotel portion of the project. There will be relatively typical bank financing involved in addition to the TIF funds and EB-5 money. In my recent discussions with the developer, this project is moving forward and keeping the Shamrock folks pretty busy.
I actually love the idea of EB5. The general premise of it, is what built this country, and it attracts the best and brightest minds from around the world, or at least people who are wanting to live here bad enough to invest large sums of cash -- instead of illegally jumping a fence and becoming a financial liability the moment they gain entry.
My concern is whether or not the city knew EB5 would be an integral part of this plan. If they didn't know, to me, that shows incompetence. If they did know, did they take a moment to consult with an immigration attorney to discuss the complications and extended timeline for such a method?
Also: isn't it a concern that a developer with zero experience of projects on this magnitude, would assume that foreign investors would buy-in?
Hope it all works out, but it almost feels like everyone is "learning as they go" on this endeavor - but what the heck do I know, really...
Last edited by S33 on Sat Apr 25, 2015 6:48 pm, edited 1 time in total.
Socialism is a philosophy of failure, the creed of ignorance, and the gospel of envy, its inherent virtue is the equal sharing of misery. - Winston Churchill
-
S33
- County Board
- Posts: 4430
- Joined: Wed May 07, 2008 5:15 pm
Re: Official: Shamrock Development (10th and Capitol)
There is almost ZERO skilled labor available in this area. We are looking at hiring guys for 27/hr just to pull low-voltage cable.GetUrban wrote:The weather could be a minor factor, but it's probably more a factor of pulling workers off of other work they already have going on, or finishing that work first, since in this region, I doubt many crews are sitting around waiting for something to do.
Socialism is a philosophy of failure, the creed of ignorance, and the gospel of envy, its inherent virtue is the equal sharing of misery. - Winston Churchill
-
MTO
- City Council
- Posts: 7783
- Joined: Wed Mar 09, 2005 5:49 pm
- Location: Dundee
Re: Official: Shamrock Development (10th and Capitol)
So will they need a dig ticket before they start or at this scale do they find utilities and so forth on their own?
15-17, 26, 32
-
S33
- County Board
- Posts: 4430
- Joined: Wed May 07, 2008 5:15 pm
Re: Official: Shamrock Development (10th and Capitol)
I'm sure the little pink flags are more than adequate. Not like they will be drilling and pouring footings, or anything. LolMTO wrote:So will they need a dig ticket before they start or at this scale do they find utilities and so forth on their own?
Socialism is a philosophy of failure, the creed of ignorance, and the gospel of envy, its inherent virtue is the equal sharing of misery. - Winston Churchill
-
GetUrban
- Planning Board
- Posts: 2650
- Joined: Sun Nov 23, 2008 9:07 pm
- Location: Omaha
Re: Official: Shamrock Development (10th and Capitol)
That's a good point...you'll probably see all the utility locate flags and spray paint all over the place before they start digging.MTO wrote:So will they need a dig ticket before they start or at this scale do they find utilities and so forth on their own?
He said "They are some big, ugly red brick buildings"
...and then they were gone.
...and then they were gone.
-
iamjacobm
- City Council
- Posts: 10829
- Joined: Sat Apr 10, 2010 11:52 am
- Location: Chicago
Re: Official: Shamrock Development (10th and Capitol)
It is going to be buried in this thread somewhere, but I remember something about a bunch of old tanks and such from when this land had the plant on it. They will all have to be dugout.
-
GetUrban
- Planning Board
- Posts: 2650
- Joined: Sun Nov 23, 2008 9:07 pm
- Location: Omaha
Re: Official: Shamrock Development (10th and Capitol)
I wonder if they'll open the parking back up for Berkshire's events...might as well.
...That explains it....just waiting until Berkshire is done. Better get it going before the CWS though. ;-)
...That explains it....just waiting until Berkshire is done. Better get it going before the CWS though. ;-)
He said "They are some big, ugly red brick buildings"
...and then they were gone.
...and then they were gone.
-
S33
- County Board
- Posts: 4430
- Joined: Wed May 07, 2008 5:15 pm
Re: Official: Shamrock Development (10th and Capitol)
I just now realized that your avatar is a picture of Jobbers Canyon. Is it unrealistic to say that Jobbers had more potential than the Old Market itself?GetUrban wrote:I wonder if they'll open the parking back up for Berkshire's events...might as well.
...That explains it....just waiting until Berkshire is done. Better get it going before the CWS though. ;-)
Socialism is a philosophy of failure, the creed of ignorance, and the gospel of envy, its inherent virtue is the equal sharing of misery. - Winston Churchill
-
Linkin5
- County Board
- Posts: 4914
- Joined: Wed Feb 11, 2004 1:59 am
Re: Official: Shamrock Development (10th and Capitol)
The Old Market is part of Jobbers Canyon.S33 wrote:I just now realized that your avatar is a picture of Jobbers Canyon. Is it unrealistic to say that Jobbers had more potential than the Old Market itself?GetUrban wrote:I wonder if they'll open the parking back up for Berkshire's events...might as well.
...That explains it....just waiting until Berkshire is done. Better get it going before the CWS though. ;-)
-
S33
- County Board
- Posts: 4430
- Joined: Wed May 07, 2008 5:15 pm
Re: Official: Shamrock Development (10th and Capitol)
obviously my comment was distinguishing between what is now the old market, and what was once part of jobbers canyon, but has since been demolished
Socialism is a philosophy of failure, the creed of ignorance, and the gospel of envy, its inherent virtue is the equal sharing of misery. - Winston Churchill
-
Garrett
- County Board
- Posts: 4753
- Joined: Thu Nov 27, 2008 12:29 am
- Location: New York City
Re: Official: Shamrock Development (10th and Capitol)
If we still had Jobbers Canyon I doubt there would be a North Downtown.