Heartwood Preserve (144th Dodge/Pacific)

West Omaha, Sarpy and Nebraska metro counties.

Moderators: nebugeater, Omaha Cowboy, Brad, BRoss

Bob from Omaha
Planning Board
Posts: 3079
Joined: Wed Sep 08, 2004 3:00 pm
Location: Metro Detroit Michigan

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Bob from Omaha »

mgoett wrote: Wed Mar 03, 2021 9:22 pm Looks like an opportunity for Schwab to jump on since they want to increase jobs here instead of Cali
They do??? Not Texas and Colorado?
NEDodger
Parks & Recreation
Posts: 1334
Joined: Sun Apr 13, 2014 1:19 am

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by NEDodger »

mgoett wrote: Wed Mar 03, 2021 9:22 pm Looks like an opportunity for Schwab to jump on since they want to increase jobs here instead of Cali
I personally don't see this being the case. However, IF it does happen.....you can bet those would be going into Joe Ricketts' new office building on the other side of Dodge.
User avatar
BRoss
IT Director
Posts: 10003318
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by BRoss »

A little mention on the Applied building today:

Heartland Preserve to showcase a park and creative water basins
Applied chairman Steve Menzies conceived the Heartwood redevelopment project that also is to include the company's new operations campus on a 50-acre stretch southwest of 144th and Pacific Streets.

Construction of that operations campus remains largely suspended as Applied officials continue to evaluate the impact of COVID-19 on the building design, Emanuel said last week.

It's been six months since Applied first suspended construction at the site to “protect” workers and suppliers and to reassess the layout. At the time, Emanuel said the pause was expected to last three to six months.

Emanuel said he has "no doubt" the future operations hub will be built. He said some "behind-the-scenes" and off-site construction assembly work is taking place currently.
I'm hopeful that they are still saying it will be built instead of not commenting.
User avatar
Omaha Cowboy
The Don
Posts: 1013704
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Omaha Cowboy »

HR Paperstacks wrote: Sun Mar 28, 2021 11:36 am A little mention on the Applied building today:

Heartland Preserve to showcase a park and creative water basins
Applied chairman Steve Menzies conceived the Heartwood redevelopment project that also is to include the company's new operations campus on a 50-acre stretch southwest of 144th and Pacific Streets.

Construction of that operations campus remains largely suspended as Applied officials continue to evaluate the impact of COVID-19 on the building design, Emanuel said last week.

It's been six months since Applied first suspended construction at the site to “protect” workers and suppliers and to reassess the layout. At the time, Emanuel said the pause was expected to last three to six months.

Emanuel said he has "no doubt" the future operations hub will be built. He said some "behind-the-scenes" and off-site construction assembly work is taking place currently.
I'm hopeful that they are still saying it will be built instead of not commenting.
Well, we’ve definitely hit that 6 month max time frame.. It’s good to read that Applied Chairman Emanuel is say he has “no doubt” the operations building will be built.. I agree- Let’s hope this cones to fruition...

Ciao..LiO...Peace
Go Cowboys!
User avatar
iamjacobm
City Council
Posts: 10795
Joined: Sat Apr 10, 2010 6:52 am
Location: Chicago

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by iamjacobm »

Not all doom and gloom. A request to increase the buildable commercial SF in the development plan by 1 million square feet and add 763 additional apartment units to the initial plan. Seems they have ideas of building more than the initial plan shot for.

https://planning.cityofomaha.org/images ... ril/05.pdf
LetsBeReal22
New to the Neighborhood
Posts: 44
Joined: Tue Jan 26, 2021 10:47 am

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by LetsBeReal22 »

This is certainly great news! And they raised the heights of the buildings a bit.
charlie123
Home Owners Association
Posts: 108
Joined: Wed Sep 01, 2010 1:52 pm
Location: Omaha Metro Area

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by charlie123 »

The big yellow crane is back up again at the Applied Site. Are they adding more steel to the building now? It's hard to see what's going on over there w/the hill, etc in the visual way
GLASSHOLE23
New to the Neighborhood
Posts: 27
Joined: Wed Dec 02, 2020 12:09 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by GLASSHOLE23 »

Word on the street is that they are receiving 30 some truckloads of iron soon. Tentative start back up date is June 1st. That's what I was told, hopefully it's correct.
User avatar
Omaha Cowboy
The Don
Posts: 1013704
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Omaha Cowboy »

Great news if true..and one of my friend confirmed the Big Yellow crane is back up as well..

Ciao..LiO...Peace
Go Cowboys!
Cermak
Planning Board
Posts: 2315
Joined: Thu Nov 29, 2018 1:02 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Cermak »

Does anyone know the square footage on this building ? I’m guessing 150-200k.
User avatar
BRoss
IT Director
Posts: 10003318
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by BRoss »

The Applied building is back on!

Applied Underwriters to relaunch campus construction
Cindy Gonzalez, Omaha World-Hearld wrote:Company spokesman Bart Emanuel said this past week that, after observing federal pandemic guidelines and increased vaccinations, Applied is comfortable with resuming work at the 50-acre office campus southwest of 144th and Pacific Streets.

Work is to resume in June. Emanuel, director of development and construction, said he expects up to 150 workers at the building site when things return to full swing.

...

Originally, Emanuel predicted construction to stall for three to six months. He said that during the past eight or so months, Applied leaders also were reviewing the building's design and other details in light of COVID. He said the company has not downsized its plan, and will move forward with the same vision that calls for open floor plans and high ceilings.
User avatar
Omaha Cowboy
The Don
Posts: 1013704
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Omaha Cowboy »

HR Paperstacks wrote: Sun Apr 18, 2021 9:49 pm The Applied building is back on!

Applied Underwriters to relaunch campus construction
Cindy Gonzalez, Omaha World-Hearld wrote:Company spokesman Bart Emanuel said this past week that, after observing federal pandemic guidelines and increased vaccinations, Applied is comfortable with resuming work at the 50-acre office campus southwest of 144th and Pacific Streets.

Work is to resume in June. Emanuel, director of development and construction, said he expects up to 150 workers at the building site when things return to full swing.

...

Originally, Emanuel predicted construction to stall for three to six months. He said that during the past eight or so months, Applied leaders also were reviewing the building's design and other details in light of COVID. He said the company has not downsized its plan, and will move forward with the same vision that calls for open floor plans and high ceilings.
Great news indeed :thumb: ...

Ciao..LiO...Peace
Go Cowboys!
ita
County Board
Posts: 4732
Joined: Thu Jul 12, 2018 4:11 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by ita »

The UBT building has the elevator shaft up. It's got some good height to it.
User avatar
BRoss
IT Director
Posts: 10003318
Joined: Fri Aug 04, 2006 7:39 pm
Location: West Central Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by BRoss »

Got out there tonight and grabbed a few photos:

Image

Image

Image

Image

Image
User avatar
Omaha Cowboy
The Don
Posts: 1013704
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Omaha Cowboy »

Looks good..

Thanks for the pic update :thumb: ...

Ciao..LiO...Peace
Go Cowboys!
jjohanning98
New to the Neighborhood
Posts: 5
Joined: Wed Jun 23, 2021 8:52 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by jjohanning98 »

Just read the latest press release ( https://bit.ly/3j3IxHb) and was surprised to see the following: ""Construction will start later in the year on the residential area at the south-western corner of Pacific St. and Applied Parkway. It will consist of 234 single-family residences in duplex and town house home styles." This seems to be referring to the residential district behind Millard North. I thought they were planning single family detached homes for this area. Being right behind Millard North, I would think the highest demand for this location would be from families with kids. Given the fact there is virtually no new construction options for single family detached homes in Millard school district (except out near Gretna), it seems bizarre to me that they would build duplexes here.
User avatar
Garrett
County Board
Posts: 4612
Joined: Wed Nov 26, 2008 6:29 pm
Location: New York City

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Garrett »

jjohanning98 wrote: Wed Jun 23, 2021 8:57 pm Just read the latest press release ( https://bit.ly/3j3IxHb) and was surprised to see the following: ""Construction will start later in the year on the residential area at the south-western corner of Pacific St. and Applied Parkway. It will consist of 234 single-family residences in duplex and town house home styles." This seems to be referring to the residential district behind Millard North. I thought they were planning single family detached homes for this area. Being right behind Millard North, I would think the highest demand for this location would be from families with kids. Given the fact there is virtually no new construction options for single family detached homes in Millard school district (except out near Gretna), it seems bizarre to me that they would build duplexes here.
Southwest corner of Pacific/Applied would indicate it's the section between the big Applied Campus and Pacific, not behind Millard North.
OMA-->CHI-->NYC
User avatar
Brad
Photographer
Posts: 1036415
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Brad »

Garrett wrote: Wed Jun 23, 2021 9:11 pm
jjohanning98 wrote: Wed Jun 23, 2021 8:57 pm Just read the latest press release ( https://bit.ly/3j3IxHb) and was surprised to see the following: ""Construction will start later in the year on the residential area at the south-western corner of Pacific St. and Applied Parkway. It will consist of 234 single-family residences in duplex and town house home styles." This seems to be referring to the residential district behind Millard North. I thought they were planning single family detached homes for this area. Being right behind Millard North, I would think the highest demand for this location would be from families with kids. Given the fact there is virtually no new construction options for single family detached homes in Millard school district (except out near Gretna), it seems bizarre to me that they would build duplexes here.
Southwest corner of Pacific/Applied would indicate it's the section between the big Applied Campus and Pacific, not behind Millard North.
This is the residential area on the SW area:
applied.JPG
You do not have the required permissions to view the files attached to this post.
User avatar
iamjacobm
City Council
Posts: 10795
Joined: Sat Apr 10, 2010 6:52 am
Location: Chicago

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by iamjacobm »

The site Brad shows are the big lots that went for like 250k+ for the dirt alone, houses there might push a million bucks. The press release comment must be a typo regarding the location b/c the for sale housing north of Pacific by Millard North is supposed to be on much smaller lots which would fit the townhouse description.
User avatar
Brad
Photographer
Posts: 1036415
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Brad »

iamjacobm wrote: Wed Jun 23, 2021 10:07 pm The site Brad shows are the big lots that went for like 250k+ for the dirt alone, houses there might push a million bucks. The press release comment must be a typo regarding the location b/c the for sale housing north of Pacific by Millard North is supposed to be on much smaller lots which would fit the townhouse description.
Page 6 and 7 show the proposed lots for the area behind Millard North:
https://planning.cityofomaha.org/images ... ril/01.pdf

This went before the planning board in April, so I am not sure if its been to City Council or not.
ita
County Board
Posts: 4732
Joined: Thu Jul 12, 2018 4:11 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by ita »

jjohanning98 wrote: Wed Jun 23, 2021 8:57 pm Just read the latest press release ( https://bit.ly/3j3IxHb) and was surprised to see the following: ""Construction will start later in the year on the residential area at the south-western corner of Pacific St. and Applied Parkway. It will consist of 234 single-family residences in duplex and town house home styles." This seems to be referring to the residential district behind Millard North. I thought they were planning single family detached homes for this area. Being right behind Millard North, I would think the highest demand for this location would be from families with kids. Given the fact there is virtually no new construction options for single family detached homes in Millard school district (except out near Gretna), it seems bizarre to me that they would build duplexes here.
I think we assume families need SFH, but townhomes and duplexes seem to be cheaper to build (hopefully more affordable for buyers), increase density, and are scarce in number in Omaha. I think it's a good move. I think we have to move away from the thought that every family of four needs a 2000 sq ft house and 8000 sq ft lot in the suburbs.

It's crazy that all those estate lots are called for. Also four builders are attached to the 234 home duplex/townhome portion.
jjohanning98
New to the Neighborhood
Posts: 5
Joined: Wed Jun 23, 2021 8:52 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by jjohanning98 »

For years they've talked about having a variety of housing options for all demographics, and on their website they have the "Heartwood Oaks" area (East of the Estate Area on the map) that says it will be "cottages, townhouses, and small apartment buildings," and the Heartwood Row area is supposed to have more apartments and condos. That's why it doesn't make sense to me. It now sounds like the only options will be the million dollar estates or townhomes/duplexes/apartments. Why wouldn't they include a middle of the road option for average families in Omaha? Especially when it's located in a highly desirable school district and there are no other new construction options in the area?
ita
County Board
Posts: 4732
Joined: Thu Jul 12, 2018 4:11 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by ita »

jjohanning98 wrote: Thu Jun 24, 2021 9:02 am For years they've talked about having a variety of housing options for all demographics, and on their website they have the "Heartwood Oaks" area (East of the Estate Area on the map) that says it will be "cottages, townhouses, and small apartment buildings," and the Heartwood Row area is supposed to have more apartments and condos. That's why it doesn't make sense to me. It now sounds like the only options will be the million dollar estates or townhomes/duplexes/apartments. Why wouldn't they include a middle of the road option for average families in Omaha? Especially when it's located in a highly desirable school district and there are no other new construction options in the area?
Yeah, you're right. They were saying there would be more variety. I am wondering if the change to only duplexes and townhomes is market/demand driven or financially driven? Probably a bit of both. The most recent plans submitted in April to the planning board (referenced in an earlier post) still identified single family detached as possible home style. Maybe there will still be SFH's in the neighborhood. It could have just been a typo in the release; they did misidentified the location of the neighborhood.
riceweb
Human Relations
Posts: 606
Joined: Thu Mar 22, 2007 12:54 am
Location: Omaha, NE

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by riceweb »

iamjacobm wrote: Wed Jun 23, 2021 10:07 pm The site Brad shows are the big lots that went for like 250k+ for the dirt alone, houses there might push a million bucks. The press release comment must be a typo regarding the location b/c the for sale housing north of Pacific by Millard North is supposed to be on much smaller lots which would fit the townhouse description.
IMO, with housing prices the way they are, these homes will probably all be in the $1.5-2m range, similar to Linden Estates.

EDIT: at least for the larger single-family homes in the area. They're also building more traditional housing, which will be considerably cheaper (and smaller).
jjohanning98
New to the Neighborhood
Posts: 5
Joined: Wed Jun 23, 2021 8:52 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by jjohanning98 »

riceweb wrote: Thu Jun 24, 2021 10:47 am
iamjacobm wrote: Wed Jun 23, 2021 10:07 pm The site Brad shows are the big lots that went for like 250k+ for the dirt alone, houses there might push a million bucks. The press release comment must be a typo regarding the location b/c the for sale housing north of Pacific by Millard North is supposed to be on much smaller lots which would fit the townhouse description.
IMO, with housing prices the way they are, these homes will probably all be in the $1.5-2m range, similar to Linden Estates.

EDIT: at least for the larger single-family homes in the area. They're also building more traditional housing, which will be considerably cheaper (and smaller).
Yeah, but according to the this latest press release it doesn't sound like they are planning more "traditional housing" anymore-just the million dollar mansions and then duplexes/townhomes/apartments. I hope the press release is wrong about this, but after releasing extremely limited info, you would think when they actually do release info it would be accurate. Very frustrating for those of us families who have been excitedly awaiting this development for years.
jjohanning98
New to the Neighborhood
Posts: 5
Joined: Wed Jun 23, 2021 8:52 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by jjohanning98 »

I looked again at the Preliminary Plat approval request from November/December 2020 and the final plat approval from March/April 2021. The one from December includes a Development Plan which definitely include single family detached housing. The plat map/map of the lots on the most recent approval from April looks exactly the same as the previous one, so maybe single family detached housing is still in the plan. Considering the limited info being released, you would think they would get the info correct in the press release. I guess we just have to be patient and wait for more details...
ita
County Board
Posts: 4732
Joined: Thu Jul 12, 2018 4:11 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by ita »

jjohanning98 wrote: Thu Jun 24, 2021 1:58 pm I looked again at the Preliminary Plat approval request from November/December 2020 and the final plat approval from March/April 2021. The one from December includes a Development Plan which definitely include single family detached housing. The plat map/map of the lots on the most recent approval from April looks exactly the same as the previous one, so maybe single family detached housing is still in the plan. Considering the limited info being released, you would think they would get the info correct in the press release. I guess we just have to be patient and wait for more details...
Yes, the whole project has been fluid aside from some key elements like trails, the park and general location of stuff. There may yet be single family detached in the more affordable neighborhood.
User avatar
Omaha Cowboy
The Don
Posts: 1013704
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Omaha Cowboy »

Regardless, the size and scope of this project is massive and stretches miles.. The 10-20 year to near full completion time frame seems spot on to me.. Very ambitious project for a 1 million, mid major metropolitan area like Omaha..

I just hope I’m still around to see at least the nearly completed project…

Ciao..LiO…Peace
Go Cowboys!
User avatar
skinzfan23
City Council
Posts: 11559
Joined: Mon Feb 09, 2004 11:26 am
Location: Omaha/Bellevue

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by skinzfan23 »

Omaha's St. Wenceslaus Catholic Church to unveil $30.2 million project

Wow that is pretty impressive $30 Million renovation.

Image

Image

Image
The 60,000-square-foot church now has a sanctuary with seating for 1,400 people, a 2,600-square-foot day chapel with seating for 200 and a 5,000-square-foot new parish office. BCDM, an Omaha architecture firm, designed the new building.

Masses previously had been held in a much smaller space that had seating for 800. That space will become a reception hall and meeting space.

St. Wenceslaus' current capital campaign has raised more than $11.8 million to date, Daub said. The parish has 10,637 registered members.

The project included a new organ donated by a parish member. The organ took five weeks to install and features 3,747 pipes.

The pipes range in size from ones as small as a pen to as long as 32 feet.
User avatar
Brad
Photographer
Posts: 1036415
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Brad »

skinzfan23 wrote: Wed Jun 30, 2021 4:49 pm
Wow that is pretty impressive $30 Million renovation.
Its new construction. The "old" church is next to this.
ita
County Board
Posts: 4732
Joined: Thu Jul 12, 2018 4:11 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by ita »

Carson Group and Valmont finish new headquarters at Heartwood Preserve
Cindy Gonzales
Two new corporate headquarters are now ready for hundreds of employees to move in at west Omaha's Heartwood Preserve campus.

Construction has wrapped up on the first phase of the six-story Carson Group complex near 144th Street and West Dodge Road, said Bart Emanuel of Applied Underwriters, which is the driver and primary owner of the broader 500-acre Heartwood mixed-use project.

He said more than 150 employees have started to move into the Carson facility. JE Dunn Construction has also leased a floor of that building.

The Valmont Industries complex is also done, Emanuel said. The first 100 employees are expected to complete their move-in soon. The new facility is about 50% larger than Valmont's former base and will be occupied by up to 500 people.
Also, all the estate lots are called for with construction starting on home later this summer. The more affordable neighborhood north of Pacific will start later this year.
User avatar
Omaha Cowboy
The Don
Posts: 1013704
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Omaha Cowboy »

I drove some friends, in from out of town recently, around this expansive development..they live in the Dallas-Fort Worth Metroplex, where pretty much everything is done “big”..and they were pretty shocked with the expansive size and scope of Heartwood Reserve- even mentioning this would be a large development by Dallas standards..

That it’s happening in a 1 million population metro like Omaha, makes is just that more impressive..at least to me…

Ciao..LiO…Peace
Go Cowboys!
User avatar
ByrnesViceVersa
New to the Neighborhood
Posts: 39
Joined: Wed Jun 23, 2021 1:02 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by ByrnesViceVersa »

Omaha Cowboy wrote: Mon Jul 12, 2021 6:52 pm I drove some friends, in from out of town recently, around this expansive development..they live in the Dallas-Fort Worth Metroplex, where pretty much everything is done “big”..and they were pretty shocked with the expansive size and scope of Heartwood Reserve- even mentioning this would be a large development by Dallas standards..

That it’s happening in a 1 million population metro like Omaha, makes is just that more impressive..at least to me…

Ciao..LiO…Peace
This development in general is huge for any city in the US. It would be awesome if it was downtown but at least it's somewhere here.
USER HAS BEEN DEACTIVATED BY FORUM ADMINS DO TO SPAM
User avatar
Omaha Cowboy
The Don
Posts: 1013704
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Omaha Cowboy »

ByrnesViceVersa wrote: Mon Jul 12, 2021 7:31 pm
Omaha Cowboy wrote: Mon Jul 12, 2021 6:52 pm I drove some friends, in from out of town recently, around this expansive development..they live in the Dallas-Fort Worth Metroplex, where pretty much everything is done “big”..and they were pretty shocked with the expansive size and scope of Heartwood Reserve- even mentioning this would be a large development by Dallas standards..

That it’s happening in a 1 million population metro like Omaha, makes is just that more impressive..at least to me…

Ciao..LiO…Peace
This development in general is huge for any city in the US. It would be awesome if it was downtown but at least it's somewhere here.
It agree it is..

As it relates to wishing it was downtown, we’ll just have to be patient with it. The hope for $500 million Riverfront Redevelopment plan downtown, is that as it progresses through to final completion in 2024, it will attract/spur additional and significant developments for our core. The $101 million dollar Luminarium Science Center/Museum is a perfect example of this…

Ciao..LiO…Peace
Go Cowboys!
User avatar
iamjacobm
City Council
Posts: 10795
Joined: Sat Apr 10, 2010 6:52 am
Location: Chicago

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by iamjacobm »

This total development is basically the same land area as everything north of Leavenworth and west of 10th out to the 480 loop. It is massive and it is also a greenfield which is much more simple to build on. Ignore the thoughts of wanting this downtown, it was never an option.
User avatar
Omaha Cowboy
The Don
Posts: 1013704
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Omaha Cowboy »

From an overall land mass perspective, no..a massive Heartwood Preserve type development really isn’t feasible or possible in the downtown core..

But from a development perspective, working with the feasible Riverfront Redevelopment Plan currently underway, the hope is attracting amenities which enhances the vision of a mixed use, walkable/livable 24/7 downtown core.. The plan gives the core a realistically good chance of achieving this- working within the current downtown land area..

Heartwood Preserve downtown is square peg into round hole..but I understand the reasoning for the comment- from an amenities/development standpoint…

Ciao..LiO…Peace
Go Cowboys!
User avatar
Garrett
County Board
Posts: 4612
Joined: Wed Nov 26, 2008 6:29 pm
Location: New York City

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Garrett »

It would obviously be nice if all of this was going downtown. But if we want mass transit to be viable in all parts of the city, good, dense, walkable developments like this will be key. To a degree it's almost infill when you consider how much farther west the city is stretching these days. Better to have this on 144th than 204th.
OMA-->CHI-->NYC
User avatar
Omaha Cowboy
The Don
Posts: 1013704
Joined: Wed Jan 07, 2004 5:31 am
Location: West Omaha

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by Omaha Cowboy »

Garrett wrote: Tue Jul 13, 2021 12:41 pm
It would obviously be nice if all of this was going downtown. But if we want mass transit to be viable in all parts of the city, good, dense, walkable developments like this will be key. To a degree it's almost infill when you consider how much farther west the city is stretching these days. Better to have this on 144th than 204th.
Agreed :thumb:

Ciao..LiO…Peace
Go Cowboys!
User avatar
GrandpaaSmucker
Parks & Recreation
Posts: 1879
Joined: Wed Jun 28, 2017 3:09 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by GrandpaaSmucker »

Snapped this picture through my windshield today (07-29-21) of the Carson building going up on the Southwest corner of 144th & Dodge.

Image
ita
County Board
Posts: 4732
Joined: Thu Jul 12, 2018 4:11 pm

Re: Heartwood Preserve (144th Dodge/Pacific)

Post by ita »

GrandpaaSmucker wrote: Thu Jul 29, 2021 3:24 pm Snapped this picture through my windshield today (07-29-21) of the Carson building going up on the Southwest corner of 144th & Dodge.

Image
Thanks for the pic. I have been meaning to take one. That is actually the Union Bank & Trust building. Carson is the finished one west of this one.