192nd Street Bridge North of Dodge

Trains, Planes, and Automobiles (and Streetcars!).
User avatar
mcarch
Library Board
Posts: 419
Joined: Fri Jun 15, 2007 6:44 pm
Location: Elkhorn

192nd Street Bridge North of Dodge

Post by mcarch »

So, I remember, but cannot find, that once the 180th Street Bridge was done over the Railroad Tracks that 2-5 years after, the 192nd Street bridge was next. I looked at the 6-year plan on the DC Engineering Site and did not see this project, nor can I find anything on it in Omaha City Site.

I do remember seeing preliminary plans from either the City/county on how they would work the Bridge and Blondo Street (and believe that document still exists here on the site). But now the piece of ground that they would need to use to work with to get the roads set-up with any sort of flow has been sold to a (I'll give anyone one guess) storage unit facility, and they are currently breaking ground.

So does anyone know the current status of the 192nd Street Bridge over the UP Tracks at Blond Street?

Thanks!
mcarch
User avatar
Brad
Photographer
Posts: 1036652
Joined: Sun Feb 29, 2004 12:03 am
Location: Omaha, NE

Re: 192nd Street Bridge North of Dodge

Post by Brad »

mcarch wrote: Fri Jun 17, 2022 1:20 am But now the piece of ground that they would need to use to work with to get the roads set-up with any sort of flow has been sold

So does anyone know the current status of the 192nd Street Bridge over the UP Tracks at Blond Street?
I laid out the storage units site plan and it does take in to account the 192nd street bridge. There is a triangle shaped lot along the east side of the storage units that is for the bridge.

The bridge plans were on the engineers website last summer.
User avatar
BRoss
IT Director
Posts: 10003410
Joined: Sat Aug 05, 2006 12:39 am
Location: West Central Omaha

Re: 192nd Street Bridge North of Dodge

Post by BRoss »

User avatar
mcarch
Library Board
Posts: 419
Joined: Fri Jun 15, 2007 6:44 pm
Location: Elkhorn

Re: 192nd Street Bridge North of Dodge

Post by mcarch »

Brad wrote: Fri Jun 17, 2022 3:36 am I laid out the storage units site plan and it does take in to account the 192nd street bridge. There is a triangle shaped lot along the east side of the storage units that is for the bridge.

The bridge plans were on the engineers website last summer.
But still no word on when construction is supposed to happen?
Thank you for posting that here! That is the plan!
mcarch
User avatar
Brad
Photographer
Posts: 1036652
Joined: Sun Feb 29, 2004 12:03 am
Location: Omaha, NE

Re: 192nd Street Bridge North of Dodge

Post by Brad »

mcarch wrote: Mon Jun 20, 2022 5:32 am But still no word on when construction is supposed to happen?
Not that I ever heard. I would assume at a minimum they would wait for 180th street to get completed all the way to Maple.