They had to be vertical by March.Doctor Fate wrote: Tue Jan 21, 2025 12:14 pm Does anyone recall what the required timeline was for White Lotus to begin work here?
Civic Square (former Civic Auditorium)
-
Garrett
- County Board
- Posts: 4692
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Civic Square (former Civic Auditorium)
OMA-->CHI-->NYC
-
Doctor Fate
- Parks & Recreation
- Posts: 1275
- Joined: Tue Feb 20, 2018 5:31 pm
- Location: DC Metro
Re: Civic Square (former Civic Auditorium)
And then it reverts to the city or the city can buy it back?Garrett wrote: Tue Jan 21, 2025 12:18 pmThey had to be vertical by March.Doctor Fate wrote: Tue Jan 21, 2025 12:14 pm Does anyone recall what the required timeline was for White Lotus to begin work here?
-
Garrett
- County Board
- Posts: 4692
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Civic Square (former Civic Auditorium)
Found the sale document from July, 2023.Doctor Fate wrote: Tue Jan 21, 2025 12:47 pmAnd then it reverts to the city or the city can buy it back?Garrett wrote: Tue Jan 21, 2025 12:18 pmThey had to be vertical by March.Doctor Fate wrote: Tue Jan 21, 2025 12:14 pm Does anyone recall what the required timeline was for White Lotus to begin work here?
https://cityclerk.cityofomaha.org/wp-co ... -43475.pdf
On page 8:
Section 5.c.ii. of the Purchase Agreement shall be deleted in its entirety and replaced
with the following language which shall become the new paragraph 5.c.3.:
Right to Repurchase. Buyer shall Commence Construction (as defined below), as set
forth in the amended Redevelopment Plan, within two years of Closing. Buyer
understands and agrees that it will make its best efforts to complete installation of a
minimum of fifty percent (50%) of the public infrastructure within eighteen (18)
months of Closing. “Commence Construction” shall mean the commencement of the
construction of the footings, foundations and/or road work for a minimum of fifty
percent of the total proposed infrastructure and building structures or fifty percent of
the proposed building structures.. Buyer acknowledges and understands that any
application for tax increment financing must be submitted to the City and approved by
the Omaha City Council prior to the Commence Construction requirement can be
fulfilled. If Buyer fails to satisfy this requirement and upon notice to the Buyer and
sixty (60) days to cure, the City shall have the option to repurchase the Property for the
Purchase Price. A memorandum of this right to repurchase shall be recorded against
the Property at Closing.
Last edited by Garrett on Tue Jan 21, 2025 1:56 pm, edited 1 time in total.
OMA-->CHI-->NYC
-
Huskerbum
- New to the Neighborhood
- Posts: 45
- Joined: Sun Apr 21, 2024 2:22 pm
Re: Civic Square (former Civic Auditorium)
Time to move on…
-
MadJack
- Home Owners Association
- Posts: 202
- Joined: Tue Jul 12, 2016 10:46 am
Re: Civic Square (former Civic Auditorium)
It'll be fun to watch what happens when Arun's time runs out in March.
-
Dusty
- Human Relations
- Posts: 790
- Joined: Wed May 25, 2011 10:53 pm
- Location: Central Florida
Re: Civic Square (former Civic Auditorium)
I don't think anyone is disappointed this development is not getting built. I do like the Civic Square name.
They can keep that! LOL!
They can keep that! LOL!
Omaha's Transit Future starts now. Let's make the change!
Omaha Transit Network
Omaha Transit Network
-
Doctor Fate
- Parks & Recreation
- Posts: 1275
- Joined: Tue Feb 20, 2018 5:31 pm
- Location: DC Metro
Re: Civic Square (former Civic Auditorium)
Has White Lotus even done anything here in the years they’ve had this?
-
nebport5
- Planning Board
- Posts: 2802
- Joined: Sun Jun 06, 2004 3:13 pm
- Location: 68102
Re: Civic Square (former Civic Auditorium)
I wouldn't be surprised to see Noddle get involved.MadJack wrote: Wed Jan 22, 2025 6:39 pm It'll be fun to watch what happens when Arun's time runs out in March.
-
Garrett
- County Board
- Posts: 4692
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Civic Square (former Civic Auditorium)
They put up the sign with the planDoctor Fate wrote: Wed Jan 22, 2025 8:21 pm Has White Lotus even done anything here in the years they’ve had this?
OMA-->CHI-->NYC
-
Toto
- Home Owners Association
- Posts: 141
- Joined: Wed Jan 24, 2007 4:20 pm
- Location: Omaha
Re: Civic Square (former Civic Auditorium)
Looking at the White Lotus website and socials, I don't think they did a damn thing anywhere in 2024! They broke ground on something in the builders district that will take 16 years to complete, but that's it. Omaha needs to run them out of the civic site immediately.Garrett wrote: Wed Jan 22, 2025 9:33 pmThey put up the sign with the planDoctor Fate wrote: Wed Jan 22, 2025 8:21 pm Has White Lotus even done anything here in the years they’ve had this?
Toto
-
Garrett
- County Board
- Posts: 4692
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Civic Square (former Civic Auditorium)
Honestly I hope the city has grown to the point that it can just start depending on developers with proven track records. Omaha has a relatively shaky history with local developers, though there are some bright spots. Shamrock took forever with the Capitol District, White Lotus fumbled the Civic site, Rod Yates did jack |expletive| with Crossroads and then managed to make an even bigger |expletive| of himself in Gretna, etc.Toto wrote: Wed Jan 22, 2025 9:41 pmLooking at the White Lotus website and socials, I don't think they did a damn thing anywhere in 2024! They broke ground on something in the builders district that will take 16 years to complete, but that's it. Omaha needs to run them out of the civic site immediately.Garrett wrote: Wed Jan 22, 2025 9:33 pmThey put up the sign with the planDoctor Fate wrote: Wed Jan 22, 2025 8:21 pm Has White Lotus even done anything here in the years they’ve had this?
Meanwhile, it seems in the last few years, other local developers have really started to make big hits, particularly NuStyle and Noddle, and hopefully developing the MOO Tower and Campus will launch Lanoha into another level too. On top of that, proven national developers like Woodbury and Hines seem to be increasingly involved in big projects.
OMA-->CHI-->NYC
-
ita
- County Board
- Posts: 4745
- Joined: Thu Jul 12, 2018 4:11 pm
Re: Civic Square (former Civic Auditorium)
Just a couple points regarding the City's right of reversion. The way I read it is that the City may exercise its right of reversion if White Lotus does not Commence Construction, as defined under the that same section 5, within two years of closing. Based on public record, they recorded the deed in September 2023. So, I think White Lotus has until September to show it's "commenced construction" and if it hasn't, the City may or may not exercise its right of reversion at that point.
-
Garrett
- County Board
- Posts: 4692
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Civic Square (former Civic Auditorium)
I think we're on the 18 month timeline for installation of 50% of public infrastructure though, which hasn't happened either, which would put us at March.ita wrote: Thu Jan 23, 2025 9:03 am Just a couple points regarding the City's right of reversion. The way I read it is that the City may exercise its right of reversion if White Lotus does not Commence Construction, as defined under the that same section 5, within two years of closing. Based on public record, they recorded the deed in September 2023. So, I think White Lotus has until September to show it's "commenced construction" and if it hasn't, the City may or may not exercise its right of reversion at that point.
OMA-->CHI-->NYC
-
ita
- County Board
- Posts: 4745
- Joined: Thu Jul 12, 2018 4:11 pm
Re: Civic Square (former Civic Auditorium)
True, but the 18 month timeline is for the developer to make its "best efforts", whatever that means, but I don't think it triggers the right of reversion. I could be wrong though. In any case, if they haven't done anything by March, it's safe to say, that they'll miss the September 2025 deadline.Garrett wrote: Thu Jan 23, 2025 9:46 amI think we're on the 18 month timeline for installation of 50% of public infrastructure though, which hasn't happened either, which would put us at March.ita wrote: Thu Jan 23, 2025 9:03 am Just a couple points regarding the City's right of reversion. The way I read it is that the City may exercise its right of reversion if White Lotus does not Commence Construction, as defined under the that same section 5, within two years of closing. Based on public record, they recorded the deed in September 2023. So, I think White Lotus has until September to show it's "commenced construction" and if it hasn't, the City may or may not exercise its right of reversion at that point.
-
nebport5
- Planning Board
- Posts: 2802
- Joined: Sun Jun 06, 2004 3:13 pm
- Location: 68102
Re: Civic Square (former Civic Auditorium)
The city has already been generous with the initial terms no? Still, I wouldn't worry too much about the city's ability to take it back if they think they have another developer lined up that has a better chance of success here. I'd also imagine Agarwal (without securing a grocery tenant) may not protest and waive the White(Lotus) Flag.ita wrote: Thu Jan 23, 2025 10:10 amTrue, but the 18 month timeline is for the developer to make its "best efforts", whatever that means, but I don't think it triggers the right of reversion. I could be wrong though. In any case, if they haven't done anything by March, it's safe to say, that they'll miss the September 2025 deadline.Garrett wrote: Thu Jan 23, 2025 9:46 amI think we're on the 18 month timeline for installation of 50% of public infrastructure though, which hasn't happened either, which would put us at March.ita wrote: Thu Jan 23, 2025 9:03 am Just a couple points regarding the City's right of reversion. The way I read it is that the City may exercise its right of reversion if White Lotus does not Commence Construction, as defined under the that same section 5, within two years of closing. Based on public record, they recorded the deed in September 2023. So, I think White Lotus has until September to show it's "commenced construction" and if it hasn't, the City may or may not exercise its right of reversion at that point.
I'm still intrigued by a multi developer partnership, á la Crossroads.
-
ita
- County Board
- Posts: 4745
- Joined: Thu Jul 12, 2018 4:11 pm
Re: Civic Square (former Civic Auditorium)
Agreed, the City has been more than generous. A multi-developer arrangement could work out, especially since they already platted the property into smaller parcels since White Lotus purchased it.nebport5 wrote: Thu Jan 23, 2025 11:54 amThe city has already been generous with the initial terms no? Still, I wouldn't worry too much about the city's ability to take it back if they think they have another developer lined up that has a better chance of success here. I'd also imagine Agarwal (without securing a grocery tenant) may not protest and waive the White(Lotus) Flag.ita wrote: Thu Jan 23, 2025 10:10 amTrue, but the 18 month timeline is for the developer to make its "best efforts", whatever that means, but I don't think it triggers the right of reversion. I could be wrong though. In any case, if they haven't done anything by March, it's safe to say, that they'll miss the September 2025 deadline.Garrett wrote: Thu Jan 23, 2025 9:46 amI think we're on the 18 month timeline for installation of 50% of public infrastructure though, which hasn't happened either, which would put us at March.ita wrote: Thu Jan 23, 2025 9:03 am Just a couple points regarding the City's right of reversion. The way I read it is that the City may exercise its right of reversion if White Lotus does not Commence Construction, as defined under the that same section 5, within two years of closing. Based on public record, they recorded the deed in September 2023. So, I think White Lotus has until September to show it's "commenced construction" and if it hasn't, the City may or may not exercise its right of reversion at that point.
I'm still intrigued by a multi developer partnership, á la Crossroads.
-
OmahaJaysCU
- Planning Board
- Posts: 2191
- Joined: Tue Aug 30, 2005 6:00 pm
Re: Civic Square (former Civic Auditorium)
I had heard the only reason this construction “started” was because the city put a timeline on that project. So they tore a 1970s addition off the building and let the rest sit.Toto wrote: Wed Jan 22, 2025 9:41 pmLooking at the White Lotus website and socials, I don't think they did a damn thing anywhere in 2024! They broke ground on something in the builders district that will take 16 years to complete, but that's it. Omaha needs to run them out of the civic site immediately.Garrett wrote: Wed Jan 22, 2025 9:33 pmThey put up the sign with the planDoctor Fate wrote: Wed Jan 22, 2025 8:21 pm Has White Lotus even done anything here in the years they’ve had this?
I strongly suspect there will be a new developer inserted on the Civic site (again) in the near term.
-
F0R_L1F3
- Home Owners Association
- Posts: 156
- Joined: Sun Oct 01, 2023 12:24 am
Re: Civic Square (former Civic Auditorium)
Yeah, they are working on the Mural in downtown Lincoln and that has progress started on it. I just don't see them being able to go with the Civic Square. Their development in Lincoln has plans for phases similar to how it was with Civic and the possibility for a downtown library. Hope a new owner comes in and as I mentioned before, if a stadium hypothetically went in here, something like a ballpark village from Saint Louis would be awesome!
-
PotatoeEatsFish
- Human Relations
- Posts: 796
- Joined: Wed Jul 22, 2015 11:59 pm
Re: Civic Square (former Civic Auditorium)
What is the point of all these firms over the years spending thousands on renderings and plans just to not do anything? I get building momentum for funding but if you don’t have any funding secured I struggle to see the point from a business perspective.
#Save(TheBaseandSidesof)TheUglyGrainSilos2025
-
Doctor Fate
- Parks & Recreation
- Posts: 1275
- Joined: Tue Feb 20, 2018 5:31 pm
- Location: DC Metro
Re: Civic Square (former Civic Auditorium)
Do we have any idea why White Lotus has done nothing? Struggling to find tenants? Lack of interest? Tetrad had that problem with finding a major office tenant and then demanded all that |expletive| from the city.
I hope that when White Lotus runs out of a time, the city can find a national developer instead of another local one with no urban core portfolio.
I hope that when White Lotus runs out of a time, the city can find a national developer instead of another local one with no urban core portfolio.
-
Garrett
- County Board
- Posts: 4692
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Civic Square (former Civic Auditorium)
I think Tetrad and White Lotus are just both small time developers who managed to get awarded this huge project. 4 square blocks is massive, especially when you consider how tough its been to fill single square block developments or even smaller.
OMA-->CHI-->NYC
-
skip
- Library Board
- Posts: 277
- Joined: Tue Dec 06, 2022 1:36 pm
- Location: Midtown
Re: Civic Square (former Civic Auditorium)
I've always thought this with projects that don't workout. Like they had to spend tens of thousands if not hundreds of thousands on renderings, architects, design planning, etc.. Why not commit and finish the project? These developers are a bunch of half-steppers.PotatoeEatsFish wrote: Tue Jan 28, 2025 7:19 pm What is the point of all these firms over the years spending thousands on renderings and plans just to not do anything? I get building momentum for funding but if you don’t have any funding secured I struggle to see the point from a business perspective.
except you NuStyle and Noddle, love you both xoxo
-
iamjacobm
- City Council
- Posts: 10811
- Joined: Sat Apr 10, 2010 6:52 am
- Location: Chicago
Re: Civic Square (former Civic Auditorium)
Avoiding the sunk cost fallacy is probably one of the key strengths to have as a RE developer.skip wrote: Wed Jan 29, 2025 7:59 amI've always thought this with projects that don't workout. Like they had to spend tens of thousands if not hundreds of thousands on renderings, architects, design planning, etc.. Why not commit and finish the project? These developers are a bunch of half-steppers.PotatoeEatsFish wrote: Tue Jan 28, 2025 7:19 pm What is the point of all these firms over the years spending thousands on renderings and plans just to not do anything? I get building momentum for funding but if you don’t have any funding secured I struggle to see the point from a business perspective.
except you NuStyle and Noddle, love you both xoxo
-
Athomsfere
- Planning Board
- Posts: 2300
- Joined: Mon Sep 14, 2015 10:03 pm
Re: Civic Square (former Civic Auditorium)
I really wish we would go back to much smaller plats.Garrett wrote: Tue Jan 28, 2025 8:03 pm I think Tetrad and White Lotus are just both small time developers who managed to get awarded this huge project. 4 square blocks is massive, especially when you consider how tough its been to fill single square block developments or even smaller.
Four square blocks would be a lot nicer, more usable as ~40+ buildings of mixed styles, age and height than what we do now: ~4 buildings...
-
Garrett
- County Board
- Posts: 4692
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Civic Square (former Civic Auditorium)
I agree. Smaller buildings are easier to develop and make blocks way more dynamic and enjoyable. There's a reason Blackstone and the Old Market are amongst the most successful areas of the city.Athomsfere wrote: Wed Jan 29, 2025 10:28 amI really wish we would go back to much smaller plats.Garrett wrote: Tue Jan 28, 2025 8:03 pm I think Tetrad and White Lotus are just both small time developers who managed to get awarded this huge project. 4 square blocks is massive, especially when you consider how tough its been to fill single square block developments or even smaller.
Four square blocks would be a lot nicer, more usable as ~40+ buildings of mixed styles, age and height than what we do now: ~4 buildings...
OMA-->CHI-->NYC
-
Louie
- County Board
- Posts: 4935
- Joined: Fri Dec 23, 2011 4:23 pm
- Location: Dundee
Re: Civic Square (former Civic Auditorium)
Completely agree. My assumption as to why they haven't done that is that it's easier to have control/say over what gets built with a single parcel/developer than multiple.
-
Athomsfere
- Planning Board
- Posts: 2300
- Joined: Mon Sep 14, 2015 10:03 pm
Re: Civic Square (former Civic Auditorium)
Yup. I got your gist. But I just mean even further than a few developers who would likely each fill a block. Give it to dozens of developers.Louie wrote: Wed Jan 29, 2025 11:11 am Completely agree. My assumption as to why they haven't done that is that it's easier to have control/say over what gets built with a single parcel/developer than multiple.
-
snick
- New to the Neighborhood
- Posts: 6
- Joined: Fri Jan 28, 2022 6:49 pm
Re: Civic Square (former Civic Auditorium)
Fencing and heavy equipment showed up today. Looked like they are starting to push dirt around.
-
Garrett
- County Board
- Posts: 4692
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
-
OmahaJaysCU
- Planning Board
- Posts: 2191
- Joined: Tue Aug 30, 2005 6:00 pm
Re: Civic Square (former Civic Auditorium)
Heard a rumor that white lotus is putting on a show. They had a performance clause in their agreement with the city. They’ll push some dirt around so they can claim they started. There’s another project that is being floated there by a competing developer(it’s not a high rise, sorry).
-
Garrett
- County Board
- Posts: 4692
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Civic Square (former Civic Auditorium)
I figured this is what was happening.OmahaJaysCU wrote: Wed Mar 26, 2025 7:57 pm Heard a rumor that white lotus is putting on a show. They had a performance clause in their agreement with the city. They’ll push some dirt around so they can claim they started. There’s another project that is being floated there by a competing developer(it’s not a high rise, sorry).
But also, don’t kill my dreams for a 100 story mega tower that’s definitely in demand because of the streetcar.
OMA-->CHI-->NYC
-
jjjjhskr
- Human Relations
- Posts: 652
- Joined: Sun Mar 13, 2005 11:31 am
- Location: O!
Re: Civic Square (former Civic Auditorium)
Shocking but true, there are White Lotus trailers on this site
Back Home in Omaha!
-
Garrett
- County Board
- Posts: 4692
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
-
jjjjhskr
- Human Relations
- Posts: 652
- Joined: Sun Mar 13, 2005 11:31 am
- Location: O!
Re: Civic Square (former Civic Auditorium)
Back Home in Omaha!
-
riceweb
- Human Relations
- Posts: 619
- Joined: Thu Mar 22, 2007 12:54 am
- Location: Omaha, NE
Re: Civic Square (former Civic Auditorium)
Really feels like Civic Square, Crossroads, and Avenue One have dragged things out so much they'll all now be canceled because of the impending real estate collapse.
-
Garrett
- County Board
- Posts: 4692
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Civic Square (former Civic Auditorium)
Of the 3, I have the most faith in Crossroads since it has a legit national developer with meat on its bones, but we’ll |expletive| see.riceweb wrote: Fri Apr 04, 2025 4:35 pm Really feels like Civic Square, Crossroads, and Avenue One have dragged things out so much they'll all now be canceled because of the impending real estate collapse.
If the impending downtown boom busts out because of this trade war I’m gonna lose it
OMA-->CHI-->NYC
-
Louie
- County Board
- Posts: 4935
- Joined: Fri Dec 23, 2011 4:23 pm
- Location: Dundee
Re: Civic Square (former Civic Auditorium)
Planting soybeans.
-
ita
- County Board
- Posts: 4745
- Joined: Thu Jul 12, 2018 4:11 pm
Re: Civic Square (former Civic Auditorium)
If I remember correctly, they were trying to get permission to have it designated for aguse to reduce the tax assessment last year or two years ago. White Lotus had contract with a local farmer.
-
Doctor Fate
- Parks & Recreation
- Posts: 1275
- Joined: Tue Feb 20, 2018 5:31 pm
- Location: DC Metro
Re: Civic Square (former Civic Auditorium)
I would be quite upset if that happens. These are the major projects that could stall out (though some have really dragged regardless) or be significantly delayed:Garrett wrote: Fri Apr 04, 2025 4:39 pm
If the impending downtown boom busts out because of this trade war I’m gonna lose it
- Crossroads
- Civic Square
- The Beam
- Project Health
- 3rd convention center hotel
- Union Omaha Stadium
- Mutual Midtown Campus redevelopment
- The Stitch
Any I am forgetting?
-
skinzfan23
- City Council
- Posts: 11628
- Joined: Mon Feb 09, 2004 11:26 am
- Location: Omaha/Bellevue
Re: Civic Square (former Civic Auditorium)
I didn’t really like the interview from lotus on kmtv. He didn’t sound very promising, and kept saying that he doesn’t want to put a definitive timeline to things. Doesn’t breed much confidence.
https://www.3newsnow.com/central-omaha/ ... n-date-set