I mean we didn't even get renderings of the Grain Silo design until October 2016, so 10 years feels like a stretchOverlookedFarm wrote: Tue Oct 04, 2016 12:33 pm Here is a rendering of the farm buildings farm-garden area
One thing to point out is, the area between MNHS and Wycliffe, is like the 3rd highest point in Douglas CO. Should be spectacular views. my only concern is how the amphitheater will "fit" next to MN and Boys town.
My property backs to the west farm, I think it will be great for me. Boys Town kinda stopped caring this year.
Heartwood Preserve (144th Dodge/Pacific)
Moderators: nebugeater, Omaha Cowboy, Brad, BRoss
-
Garrett
- County Board
- Posts: 4616
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Boys Town and farmland (144th Dodge)
OMA-->CHI-->NYC
-
TreeKiid
- New to the Neighborhood
- Posts: 34
- Joined: Wed Mar 14, 2018 8:48 am
- Location: Gayville
Re: Heartwood Preserve (144th Dodge/Pacific)
Google earth has a pretty good record of this. You can see that earth was not starting to be moved until summer 2018. Earth still being moved in 2019. The early stages of the parking structure going up in March 2020. Steel for the East wing in 2021. Full structure enclosed in fall of 2022. After this point there seems to be very little change visible at the satellite imagery level other than finishing drives up to the building and landscaping.
-
zippy
- Library Board
- Posts: 297
- Joined: Wed Mar 09, 2005 5:55 pm
- Location: Harvey Oaks
Re: Heartwood Preserve (144th Dodge/Pacific)
According to some crappy cellphone pics, Jay Noddle's presentation at St Wenceslaus church was on October 3, 2016.
-
BRoss
- IT Director
- Posts: 10003321
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
Honestly, I'm not really trying to argue about it. I just live very close by and have a short walk over there, which is why I frequent the area and have been following this all very closely. I've called it out a few times now because it doesn't align with how I've remembered things going. I certainly could be misremembering things at times, but when I hear some of these outlandish timelines of how long this development has actually been going, it makes me look back to see what has really happened.Stan wrote: Tue Oct 21, 2025 8:16 am Come on down to 30Hop where you can see BRoss and OverlookedFarm argue about earth works. ;)
I remember the developers coming to my neighborhood park to present their vision and I hadn't even closed on my house in this area until December of 2017 (I actually pulled out my paperwork to confirm this). So when I read this latest claim, I spent probably around an hour going back through this thread, the articles posted around then, and historic imagery on Google Earth to understand the timeline more. I don't doubt that some minor things happened earlier than I was aware, but the fact is this development wasn't even initially announced until 2016 and this forum tends to start discussions on major developments at the first hint of something.
That said, I do love 30Hop...I was there again this past Sunday.
-
almighty_tuna
- City Council
- Posts: 106344
- Joined: Tue Apr 13, 2004 1:34 pm
- Location: Somewhere between downtown and Colorado
Re: Heartwood Preserve (144th Dodge/Pacific)
Has it improved? Mrs Tuna and I went there in the spring-ish and found the service meh and the food quite overpriced for what felt like a menu that was generally whatever Sysco or US Foods told them would be easy to warm up in the back.BRoss wrote: Tue Oct 21, 2025 9:26 pm That said, I do love 30Hop...I was there again this past Sunday.
-
BRoss
- IT Director
- Posts: 10003321
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
I've been there a few times this summer and it's been ok on the service. I had an undercooked burger once but it's been pretty good since. They have a pretty decent beer selection too. There are definitely cheaper options though.almighty_tuna wrote: Wed Oct 22, 2025 8:12 amHas it improved? Mrs Tuna and I went there in the spring-ish and found the service meh and the food quite overpriced for what felt like a menu that was generally whatever Sysco or US Foods told them would be easy to warm up in the back.BRoss wrote: Tue Oct 21, 2025 9:26 pm That said, I do love 30Hop...I was there again this past Sunday.
-
Brad
- Photographer
- Posts: 1036422
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Heartwood Preserve (144th Dodge/Pacific)
New 4 story, Class A office going on the lot south of Valmont:
Building Permit wrote:Heartwood Place - 166050 SF -
Original Description: New 170,000GSF 4 story class A commercial multitenant office building with underground parking, gym facilities/locker room & showers, patio, balconies, firepit, and conference room

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
djc311
- Planning Board
- Posts: 2087
- Joined: Tue Mar 09, 2004 10:44 pm
- Location: Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
Awesome! Hopefully this one has funding and will be finished outside AND inside within a reasonable amount of time.Brad wrote: Thu Oct 30, 2025 2:28 pm New 4 story, Class A office going on the lot south of Valmont:
Building Permit wrote:Heartwood Place - 166050 SF -
Original Description: New 170,000GSF 4 story class A commercial multitenant office building with underground parking, gym facilities/locker room & showers, patio, balconies, firepit, and conference room
-
Ben
- Parks & Recreation
- Posts: 1053
- Joined: Tue Nov 21, 2006 12:57 pm
- Location: Westside
Re: Heartwood Preserve (144th Dodge/Pacific)
For all of the debate we've had here, seems like they've identified a market need. Per recent announcements, they've hit the 20% presale mark necessary to begin the process to move forward.djc311 wrote: Wed Aug 20, 2025 8:56 amUltimately, to each their own. But if you're spending nearly $3 MILLION dollars on a condo just to live next door, above or below someone else in a glorified apartment building, then you are doing much better than me and have a lot less cares in the world than I do.Nosebot wrote: Tue Aug 19, 2025 9:13 pmGarrett wrote: Tue Aug 19, 2025 9:01 pm 3, 6 floor condo buildings to be built by an Arizona developer
https://growomaha.com/arizona-develope ... est-omaha/
Grow Omaha wrote:
Raymond Partners of Scottsdale, Ariz., plans to break ground in late 2025 or early 2026 on The Residences at Heartwood Preserve, a three-building condominium project surrounding an outdoor courtyard and swimming pool. Each building will be six stories high. The project will be built in three phases with Building 1 slated to open in the fall of 2028.
The site is on the southwest corner of Applied Parkway & Canopy Avenue just south of Valmont Industries’ global headquarters. Immediately to the east of the The Residences, is The Row, a walkable, mixed-use area, which will serve as Heartwood Preserve’s “downtown” area. So far, one building – a 4-story office building for Olsson – is currently under development in The Row.
Condo units in The Residences at Heartwood Preserve range from 1,730 sq. ft. to 3,073 sq. ft. Current offering prices start at $995,900 and go up to nearly $2.8 million per condo unit. The largest units have three bedrooms plus a den. Estimated Home Owners Association dues range from $865 to $1,537 per month.![]()
What services is the HOA doing for me that I'm paying apartment rent prices for? sheesh
Even if you're 65, retired and rich... why would you live in this thing?
Funny thing is, the people that will buy these (if they sell) will be the same ones that get charged $1 for a bag at Aldi for their groceries...![]()
-
Garrett
- County Board
- Posts: 4616
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Heartwood Preserve (144th Dodge/Pacific)
Well that's good to hear. Looks like this is for Phase I, for 7+ units of the 35 in one building. Grow Omaha is saying Phase I will be open in fall 2028.Ben wrote: Fri Oct 31, 2025 8:46 amFor all of the debate we've had here, seems like they've identified a market need. Per recent announcements, they've hit the 20% presale mark necessary to begin the process to move forward.djc311 wrote: Wed Aug 20, 2025 8:56 amUltimately, to each their own. But if you're spending nearly $3 MILLION dollars on a condo just to live next door, above or below someone else in a glorified apartment building, then you are doing much better than me and have a lot less cares in the world than I do.Nosebot wrote: Tue Aug 19, 2025 9:13 pmGarrett wrote: Tue Aug 19, 2025 9:01 pm 3, 6 floor condo buildings to be built by an Arizona developer
https://growomaha.com/arizona-develope ... est-omaha/
Grow Omaha wrote:
Raymond Partners of Scottsdale, Ariz., plans to break ground in late 2025 or early 2026 on The Residences at Heartwood Preserve, a three-building condominium project surrounding an outdoor courtyard and swimming pool. Each building will be six stories high. The project will be built in three phases with Building 1 slated to open in the fall of 2028.
The site is on the southwest corner of Applied Parkway & Canopy Avenue just south of Valmont Industries’ global headquarters. Immediately to the east of the The Residences, is The Row, a walkable, mixed-use area, which will serve as Heartwood Preserve’s “downtown” area. So far, one building – a 4-story office building for Olsson – is currently under development in The Row.
Condo units in The Residences at Heartwood Preserve range from 1,730 sq. ft. to 3,073 sq. ft. Current offering prices start at $995,900 and go up to nearly $2.8 million per condo unit. The largest units have three bedrooms plus a den. Estimated Home Owners Association dues range from $865 to $1,537 per month.![]()
What services is the HOA doing for me that I'm paying apartment rent prices for? sheesh
Even if you're 65, retired and rich... why would you live in this thing?
Funny thing is, the people that will buy these (if they sell) will be the same ones that get charged $1 for a bag at Aldi for their groceries...![]()
Encouraging signals that Omaha can sell some high end condos if nothing else.
OMA-->CHI-->NYC
-
skinzfan23
- City Council
- Posts: 11564
- Joined: Mon Feb 09, 2004 11:26 am
- Location: Omaha/Bellevue
Re: Heartwood Preserve (144th Dodge/Pacific)
That is good that they hit the 20% mark, but numbers wise that is still only 7 condos. Still remarkable that there are that many people willing to pay that amt.
-
Garrett
- County Board
- Posts: 4616
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Heartwood Preserve (144th Dodge/Pacific)
It's also only been 2 months since the announcement, so that buoys my optimism a little bitskinzfan23 wrote: Fri Oct 31, 2025 9:16 am That is good that they hit the 20% mark, but numbers wise that is still only 7 condos. Still remarkable that there are that many people willing to pay that amt.
OMA-->CHI-->NYC
-
djc311
- Planning Board
- Posts: 2087
- Joined: Tue Mar 09, 2004 10:44 pm
- Location: Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
That is good new for the developer and area - not how I'd choose to spend the money if I had it, but that's the benefit of having different housing options to choose from.Ben wrote: Fri Oct 31, 2025 8:46 amFor all of the debate we've had here, seems like they've identified a market need. Per recent announcements, they've hit the 20% presale mark necessary to begin the process to move forward.djc311 wrote: Wed Aug 20, 2025 8:56 amUltimately, to each their own. But if you're spending nearly $3 MILLION dollars on a condo just to live next door, above or below someone else in a glorified apartment building, then you are doing much better than me and have a lot less cares in the world than I do.Nosebot wrote: Tue Aug 19, 2025 9:13 pmGarrett wrote: Tue Aug 19, 2025 9:01 pm 3, 6 floor condo buildings to be built by an Arizona developer
https://growomaha.com/arizona-develope ... est-omaha/
Grow Omaha wrote:
Raymond Partners of Scottsdale, Ariz., plans to break ground in late 2025 or early 2026 on The Residences at Heartwood Preserve, a three-building condominium project surrounding an outdoor courtyard and swimming pool. Each building will be six stories high. The project will be built in three phases with Building 1 slated to open in the fall of 2028.
The site is on the southwest corner of Applied Parkway & Canopy Avenue just south of Valmont Industries’ global headquarters. Immediately to the east of the The Residences, is The Row, a walkable, mixed-use area, which will serve as Heartwood Preserve’s “downtown” area. So far, one building – a 4-story office building for Olsson – is currently under development in The Row.
Condo units in The Residences at Heartwood Preserve range from 1,730 sq. ft. to 3,073 sq. ft. Current offering prices start at $995,900 and go up to nearly $2.8 million per condo unit. The largest units have three bedrooms plus a den. Estimated Home Owners Association dues range from $865 to $1,537 per month.![]()
What services is the HOA doing for me that I'm paying apartment rent prices for? sheesh
Even if you're 65, retired and rich... why would you live in this thing?
Funny thing is, the people that will buy these (if they sell) will be the same ones that get charged $1 for a bag at Aldi for their groceries...![]()
-
Brad
- Photographer
- Posts: 1036422
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Heartwood Preserve (144th Dodge/Pacific)
Yesterday I noticed a brand new barn being built on Blossom Ave by the Broadmoor Apartment building.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
Stan
- Library Board
- Posts: 447
- Joined: Thu Apr 09, 2020 8:55 am
Re: Heartwood Preserve (144th Dodge/Pacific)
It's a new Ikea concept. ;)Brad wrote: Wed Dec 03, 2025 12:47 pm Yesterday I noticed a brand new barn being built on Blossom Ave by the Broadmoor Apartment building.
I've seen it too while we've been over there ice skating, but couldn't see any details on what it might be.
-
BRoss
- IT Director
- Posts: 10003321
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
That reminds me that I forgot to post my pics from the 23rd.Brad wrote: Wed Dec 03, 2025 12:47 pm Yesterday I noticed a brand new barn being built on Blossom Ave by the Broadmoor Apartment building.
Event venue barn:
They've also started the grading for the condos:
And the bricks are finally starting to go in on Heartwood Row:
You do not have the required permissions to view the files attached to this post.
-
BRoss
- IT Director
- Posts: 10003321
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
I posted about it couple pages back:Stan wrote: Wed Dec 03, 2025 1:00 pm I've seen it too while we've been over there ice skating, but couldn't see any details on what it might be.
BRoss wrote: Tue May 20, 2025 11:17 am Grow Omaha is reporting a new barn will be going in where the old barn was until it fell apart and that it will be used as an event venue.
Grow Omaha wrote:Developers of Heartwood Preserve are planning to raise a new barn. According to a building permit, a 3,358 sq. ft. barn structure will be built in the park that is adjacent to South 144th Street and will serve as an event venue. The new barn honors the area’s heritage as Heartwood Preserve was previously the Boy’s Town west farm.
-
Stan
- Library Board
- Posts: 447
- Joined: Thu Apr 09, 2020 8:55 am
Re: Heartwood Preserve (144th Dodge/Pacific)
Ah, my mistake, but I must have referenced the piece in my mind from your post when my kids asked what it was and I just told them it was an event space.
-
Brad
- Photographer
- Posts: 1036422
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Heartwood Preserve (144th Dodge/Pacific)
The Row at Heartwood Preserve:
1. 2. The new Barn at Heartwood Preserve:
3. 4. .
1. 2. The new Barn at Heartwood Preserve:
3. 4. .
You do not have the required permissions to view the files attached to this post.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
BRoss
- IT Director
- Posts: 10003321
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
Nice, thanks for the update! Much better than the crappy cell phone pictures I post
I haven't been over there for a few weeks now other than driving to 30 Hop last week to meet a friend. But the barn is really coming along now. The Olsson building doesn't look like much has happened with though. The first floor has been boarded up for a while now and I've hoped to see the finishing touches put on it. I'm guessing they are focusing more on interior work on the upper floors at this point to get the office space ready.
Did you see how far they are on the bricks on Heartwood Row? From your photos it looks like the barricades are gone now. I've been looking forward to that finally being done for the last few years now and was pleasantly surprised to see them finally start on it the last time I walked over there.
-
Brad
- Photographer
- Posts: 1036422
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Heartwood Preserve (144th Dodge/Pacific)
Sorry it was a really brief visit. I didn’t even look. Snapped a couple photos and then continued on with my Christmas shopping.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
BRoss
- IT Director
- Posts: 10003321
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
I made it out there today and only the westbound side is done and only to 147th, but they had a good portion of the intersection done.Brad wrote: Sat Dec 20, 2025 11:45 am Sorry it was a really brief visit. I didn’t even look. Snapped a couple photos and then continued on with my Christmas shopping.
There's also a crane onsite for the condos and it looks like they've already started on the parking lot. I could see bases for the light poles.
And with it being pretty nice today, the skating rink was really busy too.
-
almighty_tuna
- City Council
- Posts: 106344
- Joined: Tue Apr 13, 2004 1:34 pm
- Location: Somewhere between downtown and Colorado
Re: Heartwood Preserve (144th Dodge/Pacific)
In the last couple of days I noticed that some of the top floor of the west wing of the Applied Underwriters looks like it has finished lighting vs the regular construction bulbs. Maybe there's some progress sneaking in?!
-
BRoss
- IT Director
- Posts: 10003321
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
I walked the trail behind it a few weeks ago and it's looking pretty close. But this has really been one of the slowest projects I have ever seen.almighty_tuna wrote: Wed Mar 04, 2026 10:12 am In the last couple of days I noticed that some of the top floor of the west wing of the Applied Underwriters looks like it has finished lighting vs the regular construction bulbs. Maybe there's some progress sneaking in?!
-
Garrett
- County Board
- Posts: 4616
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Heartwood Preserve (144th Dodge/Pacific)
I hear it will be opening shortly after the heat death of the universe
OMA-->CHI-->NYC
-
BRoss
- IT Director
- Posts: 10003321
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
This past weekend I walked through here again and noticed a new building going up. It started before winter and they've already poured a parking lot. I had thought it was the condos that were previously announced and was confused because those were supposed to be the next lot over. But apparently there's a new office building going in here. This is just south of Valmont.
I got a very crappy cell phone photo of the sign from across Allied Parkway during sunset: I also saw that the two story building being built just west of Gunderson's has a tenant now. B. Morton Design is coming this summer. The bricks have finally now been fully placed on Heartwood Row, but I have some concerns about it. The bricks are very uneven and there's been a bunch that already have the corners chipped away. I've seen this area a few times now since they started and the unevenness seems to be getting worse and the chips were not something I had noticed before. It doesn't seem like this will age well with what is already occurring so early on.
I got a very crappy cell phone photo of the sign from across Allied Parkway during sunset: I also saw that the two story building being built just west of Gunderson's has a tenant now. B. Morton Design is coming this summer. The bricks have finally now been fully placed on Heartwood Row, but I have some concerns about it. The bricks are very uneven and there's been a bunch that already have the corners chipped away. I've seen this area a few times now since they started and the unevenness seems to be getting worse and the chips were not something I had noticed before. It doesn't seem like this will age well with what is already occurring so early on.
You do not have the required permissions to view the files attached to this post.
-
djc311
- Planning Board
- Posts: 2087
- Joined: Tue Mar 09, 2004 10:44 pm
- Location: Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
Building looks like pretty much any other glass office building constructed in Omaha over the past 20-30 years, perhaps even further back than that. Reminds me of 90th & Dodge area, TBH.BRoss wrote: Wed Mar 11, 2026 8:02 pm This past weekend I walked through here again and noticed a new building going up. It started before winter and they've already poured a parking lot. I had thought it was the condos that were previously announced and was confused because those were supposed to be the next lot over. But apparently there's a new office building going in here. This is just south of Valmont.
I got a very crappy cell phone photo of the sign from across Allied Parkway during sunset:
2026-03-08 19.00.03.jpg
I also saw that the two story building being built just west of Gunderson's has a tenant now. B. Morton Design is coming this summer.
2026-03-08 19.05.26.jpg
The bricks have finally now been fully placed on Heartwood Row, but I have some concerns about it. The bricks are very uneven and there's been a bunch that already have the corners chipped away. I've seen this area a few times now since they started and the unevenness seems to be getting worse and the chips were not something I had noticed before. It doesn't seem like this will age well with what is already occurring so early on.
-
BuildTaller
- Home Owners Association
- Posts: 163
- Joined: Thu Mar 13, 2025 9:57 am
-
almighty_tuna
- City Council
- Posts: 106344
- Joined: Tue Apr 13, 2004 1:34 pm
- Location: Somewhere between downtown and Colorado
Re: Heartwood Preserve (144th Dodge/Pacific)
It's okay. The design isn't worth a non-crappy photo.BRoss wrote: Wed Mar 11, 2026 8:02 pm I got a very crappy cell phone photo of the sign from across Allied Parkway during sunset:
-
Garrett
- County Board
- Posts: 4616
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Heartwood Preserve (144th Dodge/Pacific)
Off topic, have you had a _ in your name this whole time??almighty_tuna wrote: Thu Mar 12, 2026 1:56 pmIt's okay. The design isn't worth a non-crappy photo.BRoss wrote: Wed Mar 11, 2026 8:02 pm I got a very crappy cell phone photo of the sign from across Allied Parkway during sunset:
OMA-->CHI-->NYC
-
almighty_tuna
- City Council
- Posts: 106344
- Joined: Tue Apr 13, 2004 1:34 pm
- Location: Somewhere between downtown and Colorado
Re: Heartwood Preserve (144th Dodge/Pacific)
Lol, yeah. For the last 22 years or so!
-
OmaHawk
- New to the Neighborhood
- Posts: 6
- Joined: Thu Jan 15, 2026 5:58 pm
Re: Heartwood Preserve (144th Dodge/Pacific)
Applied has communicated to the employees that move in will be around the first of the year.almighty_tuna wrote: Wed Mar 04, 2026 10:12 am In the last couple of days I noticed that some of the top floor of the west wing of the Applied Underwriters looks like it has finished lighting vs the regular construction bulbs. Maybe there's some progress sneaking in?!
-
almighty_tuna
- City Council
- Posts: 106344
- Joined: Tue Apr 13, 2004 1:34 pm
- Location: Somewhere between downtown and Colorado
Re: Heartwood Preserve (144th Dodge/Pacific)
Ooh! It's a race to the finish line now! Who's moving in first - Mutual or Allied lol
They're making progress. I noticed last night that there are now TWO whole floors on the west wing of the building that have finished lighting.
They're making progress. I noticed last night that there are now TWO whole floors on the west wing of the building that have finished lighting.
-
BuildTaller
- Home Owners Association
- Posts: 163
- Joined: Thu Mar 13, 2025 9:57 am
Re: Heartwood Preserve (144th Dodge/Pacific)
First what of which year?OmaHawk wrote: Wed Mar 18, 2026 5:12 pmApplied has communicated to the employees that move in will be around the first of the year.almighty_tuna wrote: Wed Mar 04, 2026 10:12 am In the last couple of days I noticed that some of the top floor of the west wing of the Applied Underwriters looks like it has finished lighting vs the regular construction bulbs. Maybe there's some progress sneaking in?!
-
BRoss
- IT Director
- Posts: 10003321
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
-
Mjs5050ss
- Home Owners Association
- Posts: 95
- Joined: Thu Feb 08, 2018 3:42 pm
Re: Heartwood Preserve (144th Dodge/Pacific)
It is my understanding that the move will cover 3 phases.OmaHawk wrote: Wed Mar 18, 2026 5:12 pmApplied has communicated to the employees that move in will be around the first of the year.almighty_tuna wrote: Wed Mar 04, 2026 10:12 am In the last couple of days I noticed that some of the top floor of the west wing of the Applied Underwriters looks like it has finished lighting vs the regular construction bulbs. Maybe there's some progress sneaking in?!
The first phase starts this summer, phase 2 in Q1 of '27, and phase 3 in Q3 of '27.
-
djc311
- Planning Board
- Posts: 2087
- Joined: Tue Mar 09, 2004 10:44 pm
- Location: Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
Must be "first of fiscal year"? LOLMjs5050ss wrote: Thu Mar 19, 2026 11:51 amIt is my understanding that the move will cover 3 phases.OmaHawk wrote: Wed Mar 18, 2026 5:12 pmApplied has communicated to the employees that move in will be around the first of the year.almighty_tuna wrote: Wed Mar 04, 2026 10:12 am In the last couple of days I noticed that some of the top floor of the west wing of the Applied Underwriters looks like it has finished lighting vs the regular construction bulbs. Maybe there's some progress sneaking in?!
The first phase starts this summer, phase 2 in Q1 of '27, and phase 3 in Q3 of '27.
-
WestOmahaDad
- New to the Neighborhood
- Posts: 2
- Joined: Fri Aug 22, 2025 4:46 pm
Re: Heartwood Preserve (144th Dodge/Pacific)
Looks like the first floor of the new office building is getting ready for new occupants. Any word on who is moving in? Restaurant? Retail stores? I think the outdoor area overlooking the park would be really nice for a restaurant. Who would we like to see there? Personally, something in between Charlston's and 30 Hop. Nice, but not expensive or sports bar. Block 16 (Or Block 144?) would be fantastic!
-
BRoss
- IT Director
- Posts: 10003321
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Heartwood Preserve (144th Dodge/Pacific)
Photo updates over the past week:
You do not have the required permissions to view the files attached to this post.
-
Brad
- Photographer
- Posts: 1036422
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Heartwood Preserve (144th Dodge/Pacific)
Thanks for the update, I haven't been out there in a while.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto