Cool! Any idea how deep they need to excavate for the base?
jjjjhskr
Human Relations
Posts: 650
Joined: Sun Mar 13, 2005 11:31 am
Location: O!

Re: Omaha Streetcar - CONSTRUCTION

Post by jjjjhskr »

Any idea why, when they’ve been tearing up streets, that they couldn’t lay tracks at the same time the streets were repaired?
Back Home in Omaha!
Mapguy
Home Owners Association
Posts: 138
Joined: Wed Oct 03, 2018 3:32 pm

Re: Omaha Streetcar - CONSTRUCTION

Post by Mapguy »

I would assume the concrete base has to be at least 6 inches deep to go below the frost line and prevent frost upheaval.
almighty_tuna
City Council
Posts: 106344
Joined: Tue Apr 13, 2004 1:34 pm
Location: Somewhere between downtown and Colorado

Re: Omaha Streetcar - CONSTRUCTION

Post by almighty_tuna »

Six inches! Hopefully deeper than that. Omaha code specifies 42" as frost line depth for permanent structure foundations and footings.
User avatar
Brad
Photographer
Posts: 1036437
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE

Re: Omaha Streetcar - CONSTRUCTION

Post by Brad »

I was able to get a cross-section of the Omaha Streetcar plans and I added a typical Omaha street cross-section below it (Below the Blue Line).

I really only see one minor difference between a typical street and a streetcar street, and that is an extra 4" of Aggerate below the pavement.

Streetcar Street = 10" Pavement, 10" Aggerate Base, 12" of subgrade prep.
Typical Omaha Street = 10" Pavement, 6" Aggerate Base, 12" of subgrade prep.

Cross-Section:
Farnam Cross Section.jpg
You do not have the required permissions to view the files attached to this post.
stadsborgare
Library Board
Posts: 424
Joined: Sun Feb 01, 2009 9:33 am
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

I fought through traffic to get to that meeting in Blackstone, and boy did I learn a lot.

They covered mostly the west part of the route.

The first part of the mainline, 31st to 34th north side of street has a timeline January to August this year. By April you should start to see track being laid.

34th to 37th north side of street has a timeline February to November this year, start to see actual track laid in June.

37th to 39th north side of street has a timeline March 2026 to January 2027, see laying track in July.

Then when the north side of Farnam is all complete and opened back up to traffic, they will work their way back on the south side of the street starting at 39th going to 31st. Probably most of that is in 2027.

The station platforms come last. You probably won't see that go up till late 2027. And in the west portion of the route that runs through Midtown Crossing to Blackstone they will have their platforms in the middle of the street because the streetcar goes both ways on Farnam.

Mainline construction steps are as follows:

1, demolition
2, subdrains, gravel base, and electrical conduit
3, welding and placing track
4, gauge ties and reinforcing mat
5, encase in concrete
6, roadway pavement and striping


Image
stadsborgare
Library Board
Posts: 424
Joined: Sun Feb 01, 2009 9:33 am
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

Image

This is the stop at 37th & Farnam. The canopy is right in front of Shoeman's and Revival House. The island runs past the intersection to the Cottonwood Hotel side of 37th Street. So incidentally, north-south traffic on 37th will not be able to cross. And then a crosswalk at both ends of the island.
buildomaha
Human Relations
Posts: 700
Joined: Tue May 31, 2016 7:06 pm

Re: Omaha Streetcar - CONSTRUCTION

Post by buildomaha »

Honestly I’m all for making Farnam as useless as possible for single occupant drivers. It might prove the point that this entire stretch should be transit and ride share lanes exclusively.
#gohawks
User avatar
thenewguy
County Board
Posts: 4280
Joined: Fri Oct 19, 2007 9:50 pm
Location: Council Bluffs

Re: Omaha Streetcar - CONSTRUCTION

Post by thenewguy »

movin slower than pond water.
Go Cubs Go
User avatar
Busguy2010
City Council
Posts: 7257
Joined: Sat Apr 09, 2011 7:32 pm
Location: North Central Omaha

Re: Omaha Streetcar - CONSTRUCTION

Post by Busguy2010 »

thenewguy wrote: Thu Jan 22, 2026 5:20 am movin slower than pond water.
I thought that too. To see the number 2028 when its already been, what 3 years since the Mutual-streetcar package deal was announced officially?
User avatar
Brad
Photographer
Posts: 1036437
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE

Re: Omaha Streetcar - CONSTRUCTION

Post by Brad »

-They had to design the entire system.
-They had to get MUD and OPPD to evaluate their plans and make their own plans
-MUD has rebuilt a large portion of their infrastructure along the line
-Now that utility work has been completed in some areas, streetcar construction is under way.

I think a lot of people don't understand the complex process and have very unrealistic expectations.
almighty_tuna
City Council
Posts: 106344
Joined: Tue Apr 13, 2004 1:34 pm
Location: Somewhere between downtown and Colorado

Re: Omaha Streetcar - CONSTRUCTION

Post by almighty_tuna »

Brad wrote: Thu Jan 22, 2026 12:13 pm I think a lot of people don't understand the complex process and have very unrealistic expectations.
Yep, lots of moving parts, not just slapping tracks in a street and calling it good. Who would have thought installing new permanent infrastructure amidst existing infrastructure would take time?? I mean, it's only a train getting dropped in the middle of the city!
User avatar
Busguy2010
City Council
Posts: 7257
Joined: Sat Apr 09, 2011 7:32 pm
Location: North Central Omaha

Re: Omaha Streetcar - CONSTRUCTION

Post by Busguy2010 »

almighty_tuna wrote: Thu Jan 22, 2026 12:25 pm
Brad wrote: Thu Jan 22, 2026 12:13 pm I think a lot of people don't understand the complex process and have very unrealistic expectations.
Yep, lots of moving parts, not just slapping tracks in a street and calling it good. Who would have thought installing new permanent infrastructure amidst existing infrastructure would take time?? I mean, it's only a train getting dropped in the middle of the city!
I completely understand and appreciate the complexities behind the reason why its taking so long. BUT, maybe we wouldn't have "unrealistic expectations" if at every update, the can doesn't get kicked further down the road. It's happened enough times that I think they didn't even realize how much of a PITA it would be, or they just didn't want the public to get the idea it would take so long, as not to be an obstacle to get the ball rolling. So at this point, I see 2028, and I think "Oh, you mean 2029..." Or 2030. I'd like to ride this thing once before I die lol. Christ.
User avatar
nebugeater
City Council
Posts: 110837
Joined: Wed Aug 04, 2004 6:07 pm
Location: Gretna NE

Re: Omaha Streetcar - CONSTRUCTION

Post by nebugeater »

Busguy2010 wrote: Thu Jan 22, 2026 12:40 pm
almighty_tuna wrote: Thu Jan 22, 2026 12:25 pm
Brad wrote: Thu Jan 22, 2026 12:13 pm I think a lot of people don't understand the complex process and have very unrealistic expectations.
Yep, lots of moving parts, not just slapping tracks in a street and calling it good. Who would have thought installing new permanent infrastructure amidst existing infrastructure would take time?? I mean, it's only a train getting dropped in the middle of the city!
I completely understand and appreciate the complexities behind the reason why its taking so long. BUT, maybe we wouldn't have "unrealistic expectations" if at every update, the can doesn't get kicked further down the road. It's happened enough times that I think they didn't even realize how much of a PITA it would be, or they just didn't want the public to get the idea it would take so long, as not to be an obstacle to get the ball rolling. So at this point, I see 2028, and I think "Oh, you mean 2029..." Or 2030. I'd like to ride this thing once before I die lol. Christ.
In the meantime, while you patiently wait, just use this.




Image
For the record  NEBUGEATER does not equal BUGEATER    !!!!!!!
User avatar
Garrett
County Board
Posts: 4623
Joined: Wed Nov 26, 2008 6:29 pm
Location: New York City

Re: Omaha Streetcar - CONSTRUCTION

Post by Garrett »

Busguy2010 wrote: Thu Jan 22, 2026 12:40 pm
almighty_tuna wrote: Thu Jan 22, 2026 12:25 pm
Brad wrote: Thu Jan 22, 2026 12:13 pm I think a lot of people don't understand the complex process and have very unrealistic expectations.
Yep, lots of moving parts, not just slapping tracks in a street and calling it good. Who would have thought installing new permanent infrastructure amidst existing infrastructure would take time?? I mean, it's only a train getting dropped in the middle of the city!
I completely understand and appreciate the complexities behind the reason why its taking so long. BUT, maybe we wouldn't have "unrealistic expectations" if at every update, the can doesn't get kicked further down the road. It's happened enough times that I think they didn't even realize how much of a PITA it would be, or they just didn't want the public to get the idea it would take so long, as not to be an obstacle to get the ball rolling. So at this point, I see 2028, and I think "Oh, you mean 2029..." Or 2030. I'd like to ride this thing once before I die lol. Christ.
At this point, 2028 is the most locked in timeline. Annoying and slow as that is, that’s building transit in America for you.
OMA-->CHI-->NYC
User avatar
Busguy2010
City Council
Posts: 7257
Joined: Sat Apr 09, 2011 7:32 pm
Location: North Central Omaha

Re: Omaha Streetcar - CONSTRUCTION

Post by Busguy2010 »

Garrett wrote: Fri Jan 23, 2026 3:14 pm At this point, 2028 is the most locked in timeline. Annoying and slow as that is, that’s building transit in America for you.
It's good to know at least the utility work is pretty much done, so maybe they stand a chance to hit that 2028 goal. But I won't be the least bit surprised if it becomes "Ope, hit a few snags, it'll be late 2028 or early 2029."

I've been dreaming of this thing for nearly 30 years. This particular route almost 15. Dammit, if I get one more delay... :lol: :gun:
stadsborgare
Library Board
Posts: 424
Joined: Sun Feb 01, 2009 9:33 am
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

Busguy2010 wrote: Fri Jan 23, 2026 3:35 pm
Garrett wrote: Fri Jan 23, 2026 3:14 pm At this point, 2028 is the most locked in timeline. Annoying and slow as that is, that’s building transit in America for you.
It's good to know at least the utility work is pretty much done, so maybe they stand a chance to hit that 2028 goal. But I won't be the least bit surprised if it becomes "Ope, hit a few snags, it'll be late 2028 or early 2029."

I've been dreaming of this thing for nearly 30 years. This particular route almost 15. Dammit, if I get one more delay... :lol: :gun:
Though 2028...or 2029 seems far off still, the good thing is we are seeing the actual progress and completion of each step being made, and no more "60 to 90 days" talk like when will they even begin.

And the most exciting part of the construction is not far away at all! They'll be laying the rails no later than this spring! Something we can see. Which will be in....60 to 90 days.
User avatar
thenewguy
County Board
Posts: 4280
Joined: Fri Oct 19, 2007 9:50 pm
Location: Council Bluffs

Re: Omaha Streetcar - CONSTRUCTION

Post by thenewguy »

Busguy2010 wrote: Thu Jan 22, 2026 12:40 pm
almighty_tuna wrote: Thu Jan 22, 2026 12:25 pm
Brad wrote: Thu Jan 22, 2026 12:13 pm I think a lot of people don't understand the complex process and have very unrealistic expectations.
Yep, lots of moving parts, not just slapping tracks in a street and calling it good. Who would have thought installing new permanent infrastructure amidst existing infrastructure would take time?? I mean, it's only a train getting dropped in the middle of the city!
I completely understand and appreciate the complexities behind the reason why its taking so long. BUT, maybe we wouldn't have "unrealistic expectations" if at every update, the can doesn't get kicked further down the road. It's happened enough times that I think they didn't even realize how much of a PITA it would be, or they just didn't want the public to get the idea it would take so long, as not to be an obstacle to get the ball rolling. So at this point, I see 2028, and I think "Oh, you mean 2029..." Or 2030. I'd like to ride this thing once before I die lol. Christ.
my point exactly. It has nothing to do with the fact that it takes a long time to get it all done, but the initial timeline was one thing, then another, then another. It seemed like KC's went more smoothly/quicker, but maybe that's because it wasn't as forefront in my mind as ours is. I know it's not the same exact set of circumstances in each city, but to your point, the kicking of the can down the road has made it seem like it is taking longer than it should
Go Cubs Go
User avatar
iamjacobm
City Council
Posts: 10797
Joined: Sat Apr 10, 2010 6:52 am
Location: Chicago

Re: Omaha Streetcar - CONSTRUCTION

Post by iamjacobm »

Looks like KC's initial line started utility relocation work in Nov 2013 and they started operations in May 2016 so took them about 2.5 years. Omaha's utility work started in Sept 2023 and expected to open later in 2028 so ~5 years.

It does appear that KC was able to keep existing bridges while Omaha has to replace 2 bridges, also KC's first phase was 2 miles Omaha's will be 3 mile.

No idea if our utilities are more of a mess below grade than KC's were. It does seem like the bridges/utility work here have been a huge undertaking that wasn't as much of the case in KC and OKC at least as I can find online.
User avatar
skinzfan23
City Council
Posts: 11573
Joined: Mon Feb 09, 2004 11:26 am
Location: Omaha/Bellevue

Re: Omaha Streetcar - CONSTRUCTION

Post by skinzfan23 »

skinzfan23 wrote: Tue Dec 23, 2025 4:12 pm Any idea when they are going to turn on the decorative light on the new Harney St bridge? The bridge has been open for almost a month and is totally dark at night except for the lights on the east and west side of the bridge.
Noticed on Saturday that they decorative streetlights are now on.
stadsborgare
Library Board
Posts: 424
Joined: Sun Feb 01, 2009 9:33 am
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

Image
I wanted to see if there was any progress besides just tearing up the street, and today I found it.

It appears they are digging down to a precise depth, so the next phase can begin. This is at 31st and Farnam, where they first started cutting up concrete. They have the concrete cut up on the north side of the street all the way up to 34th thus far.
Image
Last edited by stadsborgare on Sat Feb 07, 2026 4:15 pm, edited 4 times in total.
stadsborgare
Library Board
Posts: 424
Joined: Sun Feb 01, 2009 9:33 am
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

The streetcar barn is starting to get enclosed.
Image

Image
User avatar
skinzfan23
City Council
Posts: 11573
Joined: Mon Feb 09, 2004 11:26 am
Location: Omaha/Bellevue

Re: Omaha Streetcar - CONSTRUCTION

Post by skinzfan23 »

Funny I took a quick update photo from the Jays’ game too:

Image
User avatar
Brad
Photographer
Posts: 1036437
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE

Re: Omaha Streetcar - CONSTRUCTION

Post by Brad »

View of the Streetcar Barn from the Aksarben Terrace at the CHI Health Center.

1.
20260216881A2203.jpg
.
You do not have the required permissions to view the files attached to this post.
User avatar
Zephyr
Human Relations
Posts: 645
Joined: Sun Feb 08, 2004 7:35 pm
Location: Omaha

Re: Omaha Streetcar - CONSTRUCTION

Post by Zephyr »

A little update on the maintenance facility:
https://growomaha.com/project/streetcar ... acility-3/

Some photos of the interior:
https://www.facebook.com/share/p/15xRyu5ZbUz/
stadsborgare
Library Board
Posts: 424
Joined: Sun Feb 01, 2009 9:33 am
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

Maintenance facility, southeast side

Image
last week


Image
this week
User avatar
Busguy2010
City Council
Posts: 7257
Joined: Sat Apr 09, 2011 7:32 pm
Location: North Central Omaha

Re: Omaha Streetcar - CONSTRUCTION

Post by Busguy2010 »

Its a wonder how they ever budgeted for good looking buildings for the old streetcar barns. This looks like a bunker.
Stan
Library Board
Posts: 447
Joined: Thu Apr 09, 2020 8:55 am

Re: Omaha Streetcar - CONSTRUCTION

Post by Stan »

I wonder if the cast walls are to deaden sound of maintenance work being done inside.
BuildTaller
Home Owners Association
Posts: 164
Joined: Thu Mar 13, 2025 9:57 am

Re: Omaha Streetcar - CONSTRUCTION

Post by BuildTaller »

These are just cheap tilt-ups that will easily last a human lifetime. At least they didn't go cheap-cheap.
User avatar
Brad
Photographer
Posts: 1036437
Joined: Sat Feb 28, 2004 6:03 pm
Location: Omaha, NE

Re: Omaha Streetcar - CONSTRUCTION

Post by Brad »

Rail has been delivered!

Photos from Dave Seidel
Dave Seidel wrote: 1.
rail-2.jpg
2.
rail-1.jpg
You do not have the required permissions to view the files attached to this post.
Stan
Library Board
Posts: 447
Joined: Thu Apr 09, 2020 8:55 am

Re: Omaha Streetcar - CONSTRUCTION

Post by Stan »

So they just put them on the ground connected with cotter pins and we get the streetcar by the end of the week, right?
almighty_tuna
City Council
Posts: 106344
Joined: Tue Apr 13, 2004 1:34 pm
Location: Somewhere between downtown and Colorado

Re: Omaha Streetcar - CONSTRUCTION

Post by almighty_tuna »

That's ridiculously exciting and awesome to see!!
User avatar
skinzfan23
City Council
Posts: 11573
Joined: Mon Feb 09, 2004 11:26 am
Location: Omaha/Bellevue

Re: Omaha Streetcar - CONSTRUCTION

Post by skinzfan23 »

Awesome, thanks for the update. Been thinking of this moment for the last 20 years.
User avatar
Busguy2010
City Council
Posts: 7257
Joined: Sat Apr 09, 2011 7:32 pm
Location: North Central Omaha

Re: Omaha Streetcar - CONSTRUCTION

Post by Busguy2010 »

Cool to see the rails and the tower in the same photo. Full circle moment.
User avatar
thenewguy
County Board
Posts: 4280
Joined: Fri Oct 19, 2007 9:50 pm
Location: Council Bluffs

Re: Omaha Streetcar - CONSTRUCTION

Post by thenewguy »

it's not too late to halt construction. Email your local city council representative
Go Cubs Go
GenX
Parks & Recreation
Posts: 1207
Joined: Thu Feb 04, 2016 8:16 pm
Location: Omaha

Re: Omaha Streetcar - CONSTRUCTION

Post by GenX »

I was behind one of these trucks on I-80. I wondered briefly if they’d be for the streetcar, but didn’t think about it again until seeing these pics.
stadsborgare
Library Board
Posts: 424
Joined: Sun Feb 01, 2009 9:33 am
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

update on the hole they're digging to China
Image
stadsborgare
Library Board
Posts: 424
Joined: Sun Feb 01, 2009 9:33 am
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

Along 9th-10th & Capitol they are spreading the whole worksite with a gravel bed, which is I guess the first part of creating the foundation for the tracks.
Image

Image
User avatar
Busguy2010
City Council
Posts: 7257
Joined: Sat Apr 09, 2011 7:32 pm
Location: North Central Omaha

Re: Omaha Streetcar - CONSTRUCTION

Post by Busguy2010 »

Ooh! Very exciting. I'd guess it won't be very long then until this stretch is complete and they move on to the next section.
stadsborgare
Library Board
Posts: 424
Joined: Sun Feb 01, 2009 9:33 am
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

stadsborgare wrote: Wed Jan 21, 2026 7:46 pm Mainline construction steps are as follows:

1, demolition
2, subdrains, gravel base, and electrical conduit
3, welding and placing track
4, gauge ties and reinforcing mat
5, encase in concrete
6, roadway pavement and striping
This I got from one of their printouts.