Re: $1.5 billion I-80/29 reconstruction project

Post by riceweb »

Busguy2010 wrote: Sat Feb 07, 2026 2:32 pm I'll kick rocks the day CB has a traffic problem. Heh. I think its funny they did this, but don't want a streetcar.
I really doubt CB (1) had much/any direct control over this project since it's a state/federal thing, (2) they paid much/any for it as the state and feds did most of this, and (3) the state of Iowa is a sponge for federal money. I'm pretty sure Iowa isn't even a real state, it's just a vehicle to pay highway contractors.
User avatar
Greg S
City Council
Posts: 8878
Joined: Thu Aug 26, 2004 10:46 am

Re: $1.5 billion I-80/29 reconstruction project

Post by Greg S »

I will say what they built will be sufficient for decades.
GenX
Parks & Recreation
Posts: 1202
Joined: Thu Feb 04, 2016 8:16 pm
Location: Omaha

Re: $1.5 billion I-80/29 reconstruction project

Post by GenX »

The speed limit, in areas where it was previously 55 mph, has been raised to 65 mph
Erik
Parks & Recreation
Posts: 1520
Joined: Wed Sep 08, 2004 12:55 am

Re: $1.5 billion I-80/29 reconstruction project

Post by Erik »

I really like how this reconstruction was built in CB.
Stan
Library Board
Posts: 447
Joined: Thu Apr 09, 2020 8:55 am

Re: $1.5 billion I-80/29 reconstruction project

Post by Stan »

GenX wrote: Wed Apr 22, 2026 2:44 pm The speed limit, in areas where it was previously 55 mph, has been raised to 65 mph
Even the state of Iowa wants people to move quicker through Council Bluffs.
User avatar
Greg S
City Council
Posts: 8878
Joined: Thu Aug 26, 2004 10:46 am

Re: $1.5 billion I-80/29 reconstruction project

Post by Greg S »

Erik wrote: Thu Apr 23, 2026 8:58 pm I really like how this reconstruction was built in CB.
I do too.
Mapguy
Home Owners Association
Posts: 137
Joined: Wed Oct 03, 2018 3:32 pm

Re: $1.5 billion I-80/29 reconstruction project

Post by Mapguy »

I wish they would do a similar layout with an express to separate all the through traffic. Say an express starting between 42nd and 60th (after the connection with 480)and ending at Giles Rd.

I think this would help traffic flow immensely.
halgy
Home Owners Association
Posts: 193
Joined: Tue Apr 26, 2022 12:09 pm
Location: Downtown Omaha

Re: $1.5 billion I-80/29 reconstruction project

Post by halgy »

Mapguy wrote: Sat Apr 25, 2026 9:28 am I wish they would do a similar layout with an express to separate all the through traffic. Say an express starting between 42nd and 60th (after the connection with 480)and ending at Giles Rd.

I think this would help traffic flow immensely.
When Iowa put in the express lanes, I assumed that the plan was to extend them across the river to enable a bypass of Omaha as well. Otherwise, I don't see how having fully separate express lanes to skip 2 exits in CB would be worth it. Considering all of the extra space needed for the duplicate ramps etc, I still doubt it would be worth it. Honestly, it might work half as well to just put up signs saying the inner two lanes of I-80 in Omaha are for through traffic, and the rest are for local traffic, and see if people stick to it.
User avatar
remline
Home Owners Association
Posts: 244
Joined: Wed Nov 13, 2024 10:38 am

Re: $1.5 billion I-80/29 reconstruction project

Post by remline »

halgy wrote: Sun Apr 26, 2026 8:10 am When Iowa put in the express lanes, I assumed that the plan was to extend them across the river to enable a bypass of Omaha as well. Otherwise, I don't see how having fully separate express lanes to skip 2 exits in CB would be worth it. Considering all of the extra space needed for the duplicate ramps etc, I still doubt it would be worth it. Honestly, it might work half as well to just put up signs saying the inner two lanes of I-80 in Omaha are for through traffic, and the rest are for local traffic, and see if people stick to it.
I agree, the express lanes seem like way more infrastructure than is needed. Maybe the traffic is higher during some parts of the day, and I just haven't experienced it at those times? Or perhaps they are wanting to be ready for the traffic 30 years in the future? Regardless, a minor disadvantage (at least for me) is the overwhelming number of highway signs that I need to parse when driving through CB.
User avatar
thenewguy
County Board
Posts: 4247
Joined: Fri Oct 19, 2007 9:50 pm
Location: Council Bluffs

Re: $1.5 billion I-80/29 reconstruction project

Post by thenewguy »

truthfully, traffic used to be pretty full on the interstate prior to the reconstruction. The express lane has done a lot to lessen the amount of merging and slowdowns that used to occur
Go Cubs Go
User avatar
skinzfan23
City Council
Posts: 11559
Joined: Mon Feb 09, 2004 11:26 am
Location: Omaha/Bellevue

Re: $1.5 billion I-80/29 reconstruction project

Post by skinzfan23 »

I agree, the design before was horrible and the pavement was in sad shape. It was never designed to handle the amount of traffic that it gets. Its hard to remember, but there used to be backups all the time going into and coming from Omaha due to the overcapacity on the stretch in CB.
User avatar
TitosBuritoBarn
Planning Board
Posts: 3241
Joined: Mon Nov 08, 2004 7:08 pm
Location: St. Louis

Re: $1.5 billion I-80/29 reconstruction project

Post by TitosBuritoBarn »

I think the part of the initial idea behind having the express lanes and the capacity is that the amount of truck traffic would continue to grow as rapidly as it had been. I don’t believe they’re seeing as much truck traffic as they anticipated.
"Video game violence is not a new problem. Who could forget in the wake of SimCity how children everywhere took up urban planning." - Stephen Colbert