Re: Omaha Streetcar - CONSTRUCTION
Second Concrete pour happened this morning.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
Re: Omaha Streetcar - CONSTRUCTION
On 10th Street? They only did half of that 160-foot section on Tuesday.
-
Brad
- Photographer
- Posts: 1036458
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Omaha Streetcar - CONSTRUCTION
Correct, second pour on 10th street.stadsborgare wrote: Thu Apr 30, 2026 2:42 pmOn 10th Street? They only did half of that 160-foot section on Tuesday.
Farman in Midtown crossing is getting close, possible next week? The rails are in and parallel with the rubber, but they still need more rebar under them.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
Re: Omaha Streetcar - CONSTRUCTION
8th Street between the parks is getting close, too.Brad wrote: Thu Apr 30, 2026 2:48 pmCorrect, second pour on 10th street.stadsborgare wrote: Thu Apr 30, 2026 2:42 pmOn 10th Street? They only did half of that 160-foot section on Tuesday.
Farman in Midtown crossing is getting close, possible next week? The rails are in and parallel with the rubber, but they still need more rebar under them.

-
Brad
- Photographer
- Posts: 1036458
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Omaha Streetcar - CONSTRUCTION
Oh yeah, putting in the forms. That could be early next week for concrete. I was hoping to get down there this weekend but with Berkshire in town, I might avoid it.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
Re: Omaha Streetcar - CONSTRUCTION
"Streetcar Scoreboard"
I wanted to measure the progress in some way, because obviously I have too much time on my hands, and here's what I come up with.
There are 71 blocks of streetcar line that must be completed, not counting the roughly 1 block of track from the line to the maintenance facility.
Actually because the way they are constructing it, they are putting in the westbound rails from Turner Blvd to 40th, then when they are finished with that, they will work their way back from 40th to Turner for the eastbound rails. So I count each block there twice.
Then it turns 1 block south to Harney Street for the trip back to downtown.
So, of those 71 blocks, pavement is dug up for 8 blocks in Midtown, plus I think about 8 more in downtown. That's 16. Maybe there's more than 8 in downtown, but I haven't walked up Farnam toward the Courthouse to determine what is mainline prep from underground utilities work. So I'll go with 16 for now.
Then of those 16, rails are on site at 4 of them. 3 of them have the rails aligned. 2 of them have forms and rebar put up under and around the rails, and 1 has had cement poured.
So the score at the beginning of May is 71-16-4-3-2-1.
It's going to be an exciting summer.
I wanted to measure the progress in some way, because obviously I have too much time on my hands, and here's what I come up with.
There are 71 blocks of streetcar line that must be completed, not counting the roughly 1 block of track from the line to the maintenance facility.
Actually because the way they are constructing it, they are putting in the westbound rails from Turner Blvd to 40th, then when they are finished with that, they will work their way back from 40th to Turner for the eastbound rails. So I count each block there twice.
Then it turns 1 block south to Harney Street for the trip back to downtown.
So, of those 71 blocks, pavement is dug up for 8 blocks in Midtown, plus I think about 8 more in downtown. That's 16. Maybe there's more than 8 in downtown, but I haven't walked up Farnam toward the Courthouse to determine what is mainline prep from underground utilities work. So I'll go with 16 for now.
Then of those 16, rails are on site at 4 of them. 3 of them have the rails aligned. 2 of them have forms and rebar put up under and around the rails, and 1 has had cement poured.
So the score at the beginning of May is 71-16-4-3-2-1.
It's going to be an exciting summer.
-
Brad
- Photographer
- Posts: 1036458
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Omaha Streetcar - CONSTRUCTION
Photo Update:
1. Farnam Street Looking West from 8th Street. 2. 8th Street looking north from Farnam 3. 8th street looking south from Douglas 4. 10th street looking north from Dodge 5. Farnam at Midtown Crossing
.
1. Farnam Street Looking West from 8th Street. 2. 8th Street looking north from Farnam 3. 8th street looking south from Douglas 4. 10th street looking north from Dodge 5. Farnam at Midtown Crossing
.
You do not have the required permissions to view the files attached to this post.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
skinzfan23
- City Council
- Posts: 11580
- Joined: Mon Feb 09, 2004 11:26 am
- Location: Omaha/Bellevue
Re: Omaha Streetcar - CONSTRUCTION
Great photo updates and analysis of streetcar completion.
-
jjjjhskr
- Human Relations
- Posts: 650
- Joined: Sun Mar 13, 2005 11:31 am
- Location: O!
Re: Omaha Streetcar - CONSTRUCTION
I just realized that they’ll be replacing the 10th St bridge between Farnam and Douglas for the street car. That should be fun.
Back Home in Omaha!
-
MetcalfeHarrison
- Home Owners Association
- Posts: 79
- Joined: Fri Jul 15, 2022 1:19 pm
Re: Omaha Streetcar - CONSTRUCTION
It shouldn't be a bridge replacement, just putting the rail into the existing deck. I think they'll use special low-profile rail similar to what the KC riverfront extension did unless something has changed.jjjjhskr wrote: Mon May 04, 2026 3:58 pm I just realized that they’ll be replacing the 10th St bridge between Farnam and Douglas for the street car. That should be fun.
-
Brad
- Photographer
- Posts: 1036458
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Omaha Streetcar - CONSTRUCTION
I didn't have time to stop and take a photo, but they built the curve through 10th and Capitol.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
skinzfan23
- City Council
- Posts: 11580
- Joined: Mon Feb 09, 2004 11:26 am
- Location: Omaha/Bellevue
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
-
thenewguy
- County Board
- Posts: 4290
- Joined: Fri Oct 19, 2007 9:50 pm
- Location: Council Bluffs
Re: Omaha Streetcar - CONSTRUCTION
it's been a pain for a lot of businesses, but it's encouraging to see it finally going in. Seems like it's going pretty fast now
Go Cubs Go
-
Stan
- Library Board
- Posts: 451
- Joined: Thu Apr 09, 2020 8:55 am
Re: Omaha Streetcar - CONSTRUCTION
What's the consensus in getting a great deal of the downtown work to a good point before the CWS or are they just going to put in a lot of "Mind the mess" signs beforehand?
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
Re: Omaha Streetcar - CONSTRUCTION
Well, the points at which they are starting first - 10th Street onto Capitol, and down on 8th Street between the parks - seems to suggest to me they want those parts done first before the busy tourist season with CWS.Stan wrote: Mon May 11, 2026 7:56 am What's the consensus in getting a great deal of the downtown work to a good point before the CWS or are they just going to put in a lot of "Mind the mess" signs beforehand?
I mean, they could have started instead with the part up Farnam from 8th to 10th or from 10th to 13th, or the part north of the parks going under the 480 bridge, but those parts don't seem as critical.
Especially if they can get that curve from 10th onto Capitol done before the CWS, that could open up a critical intersection that handles a lot of CWS traffic.
-
Brad
- Photographer
- Posts: 1036458
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Omaha Streetcar - CONSTRUCTION
Photos from today:
1. Here is where the guard rails or check rails, or restraining rails start for the curve. By the markings on the track, they are using restraining rail. 2. Here is where the guard rails or check rails, or restraining rails start for the curve. By the markings on the track, they are using restraining rail. 3. The curve to head east on Capitol. 4. The intersection of 10th and Capitol 5. Inside the Streetcar Maintenance Facility. Gravel obviously where a track will go. some day 6. Inside the Streetcar Maintenance Facility. Gravel obviously where a track will go. some day 7. Inside the Streetcar Maintenance Facility. This track will have an inspection pit under it and also raised platforms next to it. 8. Now up on the platform above track level looking down at the pit. 9. Looking down at the streetcar truck turntable. 10. Up yet another level, again looking down at the streetcar truck turntable. 11. Up on the upper level looking out over the Streetcar Maintenance Facility 12. A view of the upper level 13. A view of the riverfront from the upper level. There will be a glass curtain wall here. 14. A view of the office area on the upper floor. 15. Another view of the maintenance area. 16. A view of the south side of the building.
.
1. Here is where the guard rails or check rails, or restraining rails start for the curve. By the markings on the track, they are using restraining rail. 2. Here is where the guard rails or check rails, or restraining rails start for the curve. By the markings on the track, they are using restraining rail. 3. The curve to head east on Capitol. 4. The intersection of 10th and Capitol 5. Inside the Streetcar Maintenance Facility. Gravel obviously where a track will go. some day 6. Inside the Streetcar Maintenance Facility. Gravel obviously where a track will go. some day 7. Inside the Streetcar Maintenance Facility. This track will have an inspection pit under it and also raised platforms next to it. 8. Now up on the platform above track level looking down at the pit. 9. Looking down at the streetcar truck turntable. 10. Up yet another level, again looking down at the streetcar truck turntable. 11. Up on the upper level looking out over the Streetcar Maintenance Facility 12. A view of the upper level 13. A view of the riverfront from the upper level. There will be a glass curtain wall here. 14. A view of the office area on the upper floor. 15. Another view of the maintenance area. 16. A view of the south side of the building.
.
You do not have the required permissions to view the files attached to this post.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
BRoss
- IT Director
- Posts: 10003337
- Joined: Fri Aug 04, 2006 7:39 pm
- Location: West Central Omaha
Re: Omaha Streetcar - CONSTRUCTION
Wow, awesome update! That's cool to see the maintenance facility and elevated tracks in the inspection pit.
-
skinzfan23
- City Council
- Posts: 11580
- Joined: Mon Feb 09, 2004 11:26 am
- Location: Omaha/Bellevue
Re: Omaha Streetcar - CONSTRUCTION
Thanks for the update....looks great.
-
almighty_tuna
- City Council
- Posts: 106350
- Joined: Tue Apr 13, 2004 1:34 pm
- Location: Somewhere between downtown and Colorado
Re: Omaha Streetcar - CONSTRUCTION
Fantastic update! Thanks, Brad!
-
Zephyr
- Human Relations
- Posts: 645
- Joined: Sun Feb 08, 2004 7:35 pm
- Location: Omaha
Re: Omaha Streetcar - CONSTRUCTION
Thanks for posting those, Brad, great photos as always!
-
Garrett
- County Board
- Posts: 4629
- Joined: Wed Nov 26, 2008 6:29 pm
- Location: New York City
Re: Omaha Streetcar - CONSTRUCTION
Absolutely amazing to see it all starting to come together!
OMA-->CHI-->NYC
-
Brad
- Photographer
- Posts: 1036458
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Omaha Streetcar - CONSTRUCTION
Thanks guys, glad you like them!

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
Re: Omaha Streetcar - CONSTRUCTION

Another concrete pouring - the curve at the intersection of 10th & Capitol. I suspect they want to have this intersection back open to traffic by the time of the College World Series.

They are inching further west now, past 38th Street. Farnam has become one-way traffic (westbound) in the Blackstone District again.
-
Brad
- Photographer
- Posts: 1036458
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Omaha Streetcar - CONSTRUCTION
I should have asked when I was on the tour the other day, but do they have 3 track crews working? Seems like once they hit their stride they could be pouring 6 days a week rotating between the three locations.
I would assume the regular street pavers should start in right behind them before too long.
I would assume the regular street pavers should start in right behind them before too long.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
skinzfan23
- City Council
- Posts: 11580
- Joined: Mon Feb 09, 2004 11:26 am
- Location: Omaha/Bellevue
Re: Omaha Streetcar - CONSTRUCTION
Wow that was fast. You just posted about it on May 10th and its already paved!stadsborgare wrote: Thu May 14, 2026 7:41 am
Another concrete pouring - the curve at the intersection of 10th & Capitol. I suspect they want to have this intersection back open to traffic by the time of the College World Series.
They are inching further west now, past 38th Street. Farnam has become one-way traffic (westbound) in the Blackstone District again.
-
Brad
- Photographer
- Posts: 1036458
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Omaha Streetcar - CONSTRUCTION
The post above it on may 7th says the curve was in place, so a few days more, but still impressive speed.skinzfan23 wrote: Thu May 14, 2026 9:11 am Wow that was fast. You just posted about it on May 10th and its already paved!

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
skinzfan23
- City Council
- Posts: 11580
- Joined: Mon Feb 09, 2004 11:26 am
- Location: Omaha/Bellevue
Re: Omaha Streetcar - CONSTRUCTION
Sorry I missed that, I was just looking at the pics. But one week to go from laying the track to it being paved it awesome!Brad wrote: Thu May 14, 2026 9:13 am The post above it on may 7th says the curve was in place, so a few days more, but still impressive speed.
-
Brad
- Photographer
- Posts: 1036458
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Omaha Streetcar - CONSTRUCTION
For sure.skinzfan23 wrote: Thu May 14, 2026 9:16 amSorry I missed that, I was just looking at the pics. But one week to go from laying the track to it being paved it awesome!Brad wrote: Thu May 14, 2026 9:13 am The post above it on may 7th says the curve was in place, so a few days more, but still impressive speed.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
Re: Omaha Streetcar - CONSTRUCTION
For what it's worth, yesterday when I saw the curve at 10th/Capitol having been poured, I also saw that 8th Street is still only half done from last week, and they hadn't yet poured any concrete in Midtown Crossing yet. So I don't see simultaneous concrete pours at different sites, in other words.Brad wrote: Thu May 14, 2026 8:01 am I should have asked when I was on the tour the other day, but do they have 3 track crews working? Seems like once they hit their stride they could be pouring 6 days a week rotating between the three locations.
I would assume the regular street pavers should start in right behind them before too long.
-
Brad
- Photographer
- Posts: 1036458
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Omaha Streetcar - CONSTRUCTION
I meant like 10th street on Monday, 8th street on Tuesday, Midtown Crossing on Wednesday, back to 10th Thursday, 8th Friday, etc.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
jjjjhskr
- Human Relations
- Posts: 650
- Joined: Sun Mar 13, 2005 11:31 am
- Location: O!
Re: Omaha Streetcar - CONSTRUCTION
Brad, are you planning another construction update video? I’m starting to go through withdrawal.Brad wrote: Thu May 14, 2026 7:21 pm I meant like 10th street on Monday, 8th street on Tuesday, Midtown Crossing on Wednesday, back to 10th Thursday, 8th Friday, etc.
Back Home in Omaha!
-
Brad
- Photographer
- Posts: 1036458
- Joined: Sat Feb 28, 2004 6:03 pm
- Location: Omaha, NE
Re: Omaha Streetcar - CONSTRUCTION
Yes, I really need to do one soon. Just been so busy with kids activities that I’ve kind of got way behind. Hockey season is over and this is the last weekend of soccer so hopefully summer starts to free up a little bit here soon.jjjjhskr wrote: Sat May 16, 2026 9:13 amBrad, are you planning another construction update video? I’m starting to go through withdrawal.Brad wrote: Thu May 14, 2026 7:21 pm I meant like 10th street on Monday, 8th street on Tuesday, Midtown Crossing on Wednesday, back to 10th Thursday, 8th Friday, etc.

Omaha Skyline Photos, Omaha Aerial Photos, and More.
Website: www.bradwilliamsphotography.com
Facebook: www.facebook.com/bradwilliamsphotography
Twitter: www.twitter.com/bradwphoto
Instagram: www.instagram.com/bradwilliamsphotography
YouTube: www.youtube.com/@bradwilliamsphoto
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
Re: Omaha Streetcar - CONSTRUCTION
I read that all of this week they will be doing concrete placement on that whole 10th Street portion north of Dodge and that by June 8th it will be back open to traffic in both directions.
-
stadsborgare
- Library Board
- Posts: 426
- Joined: Sun Feb 01, 2009 9:33 am
- Location: Omaha Metro Area
Re: Omaha Streetcar - CONSTRUCTION
They have paved the street around 10th & Capitol, plus they have poured more concrete on the tracks going halfway down Capitol Ave. towards 9th. They still have yet to do the part between the tracks and the curb, as you can see..



Soon you'll be able to drive your car over the tracks for the first time!



Soon you'll be able to drive your car over the tracks for the first time!
-
2Adam29
- Home Owners Association
- Posts: 229
- Joined: Fri Jan 12, 2007 3:04 pm
Re: Omaha Streetcar - CONSTRUCTION
once these streets open back up people will get a lot more patience about the process. It'll be out of sight out of mind during testing, its just all the restrictive construction that's been killing the mood about downtown lately.
-
Erik
- Parks & Recreation
- Posts: 1523
- Joined: Wed Sep 08, 2004 12:55 am
Re: Omaha Streetcar - CONSTRUCTION
Considering the 30 years of persistent studies that kept coming, every time I think of streetcar I am as content as it can be - though we are just in the first phase. We almost doubled the time from tearing out the tracks to the first study under Daub (1955-1995ish and 1995ish-2025)2Adam29 wrote: Wed May 20, 2026 9:33 pm once these streets open back up people will get a lot more patience about the process. It'll be out of sight out of mind during testing, its just all the restrictive construction that's been killing the mood about downtown lately.