Omaha Streetcar - CONSTRUCTION

Trains, Planes, and Automobiles (and Streetcars!).
almighty_tuna
City Council
Posts: 106424
Joined: Tue Apr 13, 2004 6:34 pm
Location: Somewhere between downtown and Colorado

Re: Omaha Streetcar - CONSTRUCTION

Post by almighty_tuna »

That's super cool. thanks for pointing this process out!
stadsborgare
Library Board
Posts: 475
Joined: Sun Feb 01, 2009 3:33 pm
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

Image
Here's the 10th Street bridge uncovered. It's got invisible tracks like the other two.

But I'm sure it's only because a different specialized crew installs the rails than the one that does the bridge infrastructure.
stadsborgare
Library Board
Posts: 475
Joined: Sun Feb 01, 2009 3:33 pm
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

In this past week, not only did they lay and align rails but also did a concrete pour on about a block-long section in Blackstone.
Image
It stretches from across 38th Ave to short of 39th St.

There is still a gap between this and the other finished section east of 38th St. - the gap being the part in front of Brothers Lounge, that old subject of controversy.

Meanwhile, back to downtown...
Image
Those tracks I showed being welded together by the Gene Leahy Mall on Thursday, they were three 80-foot sections welded into 240-foot sections each - now they have what I counted as 36 240-foot sections all done. That might be enough to take it from 14th St. all the way to Turner Boulevard on the Farnam route.

Being that all these are in the middle of the street, I'm making a wild guess that they'll all be moved together further west when they are able, if the goal this year is to have the south side of the GLM open for parking and traffic again, being that there's public events planned over the Christmas and New Years holidays, they might like to have that area clear by then.
stadsborgare
Library Board
Posts: 475
Joined: Sun Feb 01, 2009 3:33 pm
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

This is the 10th St. bridge yesterday.
Image
I wonder what kind of compound they put in the troughs to make it easy to remove for when they're ready to work on installing the rails? Anyway, it looks like they're poised to put in the rails now.

Image
This is 10th St. Oct. 22nd when they finished the bridge. They filled the rail troughs with cement or something, like they did the other two bridges.
stadsborgare
Library Board
Posts: 475
Joined: Sun Feb 01, 2009 3:33 pm
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

Update time!

They are currently assembling the curve from Harney St. onto northbound 10th St.
Image
I love this part. I can't wait till they get to the tracks crossing each other at 10th & Farnam.
Image

Image

Image

Image
Making sure things are aligned perfectly.

And then onto the 10th Street bridge,
Image
You can see it's a special kind of rail they'll use for the bridge, and probably so for the other two bridges.

The whole streetcar line east of 13th Street is really starting to close in on all the "loose ends". I think it's exciting to see this all take shape.
User avatar
skinzfan23
City Council
Posts: 11699
Joined: Mon Feb 09, 2004 5:26 pm
Location: Omaha/Bellevue

Re: Omaha Streetcar - CONSTRUCTION

Post by skinzfan23 »

Looking good. I am excited to see this downtown loop all coming together.
buildomaha
Human Relations
Posts: 710
Joined: Wed Jun 01, 2016 12:06 am

Re: Omaha Streetcar - CONSTRUCTION

Post by buildomaha »

Are they double tracking the 10th st bridge to future proof for expansion?
#gohawks
locoluke
Home Owners Association
Posts: 224
Joined: Mon Mar 31, 2025 4:16 am

Re: Omaha Streetcar - CONSTRUCTION

Post by locoluke »

buildomaha wrote: Mon Nov 09, 2026 2:44 pm Are they double tracking the 10th st bridge to future proof for expansion?
I don’t think so. They only paved the bridge to allow for one track, and double tracking the bridge wouldn’t do that much in terms of future-proofing.
Jobbers Canyon Truther
:hammer:
GenX
Parks & Recreation
Posts: 1258
Joined: Fri Feb 05, 2016 2:16 am
Location: Omaha

Re: Omaha Streetcar - CONSTRUCTION

Post by GenX »

buildomaha wrote: Mon Nov 09, 2026 2:44 pm Are they double tracking the 10th st bridge to future proof for expansion?
It’s interesting to see that track has a different profile to it.

This weekly series has quickly become one of my favorites, thanks for your hard work!
stadsborgare
Library Board
Posts: 475
Joined: Sun Feb 01, 2009 3:33 pm
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

GenX wrote: Mon Nov 09, 2026 4:02 pm
buildomaha wrote: Mon Nov 09, 2026 2:44 pm Are they double tracking the 10th st bridge to future proof for expansion?
It’s interesting to see that track has a different profile to it.

This weekly series has quickly become one of my favorites, thanks for your hard work!
Thanks, I really enjoy doing this. I've wanted this streetcar for many years and now I get the chance to follow its progress and document it for myself. And then, as a bonus it's fun to share it with others.

And it looks like I've been given the ball on this, so I've got to run with it. Brad does so much. My situation also allows me all this free time to keep going downtown every week which I love to do anyways. Plus photography is an amateur hobby of mine.
stadsborgare
Library Board
Posts: 475
Joined: Sun Feb 01, 2009 3:33 pm
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

Here we go, update time...

Start on the 10th Street bridge,
Image
This is interesting to see how they do this.
Image
I had wondered how they were going to lay the rails in a precise way necessary, since the pavement in this case was poured before the rails are to be put down.

Now a block further south...
Image
10th Street - in the past week - has not only been dug up from Harney to Farnam, but they already have a gravel bed put down.
Image
And there must be concrete under that blue tarp and that is curing now - covering the curve I showed being worked on last week.

Conjecture has me think since this is 10th Street, a major thoroughfare, that they must be working a little faster here that at other points of the streetcar line, because it seems to be progressing pretty fast. I wouldn't be surprised if by this time next Sunday they have track laid all the way to Farnam, and that the bridge would be done, too.

Then the part I've long been waiting for would be next: the intersection of 10th & Farnam where tracks will cross each other.

I'm of the thinking they may want all of 10th St. done before the end of the year - before New Year's when thousands of people would come down for fireworks. It seems like they are on that kind of pace, weather permitting.

And then further up Harney St. pavement is very close to being done around the tracks:
Image
There are still spots they need to work on,
Image
Like connecting the brick-laiden 12th St. to the new pavement of Harney St.

And then before long, they'll be taking away all the barriers along Harney between 13th & 11th, thereby opening up parallel parking options along the street again.
User avatar
skinzfan23
City Council
Posts: 11699
Joined: Mon Feb 09, 2004 5:26 pm
Location: Omaha/Bellevue

Re: Omaha Streetcar - CONSTRUCTION

Post by skinzfan23 »

I wonder if they will open more of 10th st before the lighting ceremony and all the traffic that brings. The fireworks do bring some but all the lights and festivities before that bring a ton of people down there for the next 5-6 weeks.

Thanks for the updates. That 10th st bridge part is cool.
User avatar
Toto
Home Owners Association
Posts: 147
Joined: Wed Jan 24, 2007 10:20 pm
Location: Omaha

Re: Omaha Streetcar - CONSTRUCTION

Post by Toto »

skinzfan23 wrote: Mon Nov 16, 2026 4:31 am I wonder if they will open more of 10th st before the lighting ceremony and all the traffic that brings. The fireworks do bring some but all the lights and festivities before that bring a ton of people down there for the next 5-6 weeks.

Thanks for the updates. That 10th st bridge part is cool.
Agreed. Its never a good time to close 10th, but it seems like getting it reopened by Thanksgiving would be ideal. Its looking really good and I can't wait for the line to open.
Toto
halgy
Home Owners Association
Posts: 208
Joined: Tue Apr 26, 2022 5:09 pm
Location: Downtown Omaha

Re: Omaha Streetcar - CONSTRUCTION

Post by halgy »

The real pain downtown is getting north/south. Since 14th has been closed for year and 10th for weeks, to drive south you either have zig-zag around the closures or go all the way down to 17th.

That said, traffic downtown is always bad when there's events. There's more to legitimately complain about now, but I don't know if the average person driving down for a Creighton game in 2022 would have complained about the traffic about as much.
User avatar
skinzfan23
City Council
Posts: 11699
Joined: Mon Feb 09, 2004 5:26 pm
Location: Omaha/Bellevue

Re: Omaha Streetcar - CONSTRUCTION

Post by skinzfan23 »

From KETV citycam:
Image
Samuel
New to the Neighborhood
Posts: 29
Joined: Fri Aug 11, 2023 4:43 am

Re: Omaha Streetcar - CONSTRUCTION

Post by Samuel »

End of an era, and continuing a new.
Image
Image
stadsborgare
Library Board
Posts: 475
Joined: Sun Feb 01, 2009 3:33 pm
Location: Omaha Metro Area

Re: Omaha Streetcar - CONSTRUCTION

Post by stadsborgare »

Update time...

The 10th St. bridge:
Image
Rain the night before filled the little trenches (as you can see in the picture from Sunday) where they had already lowered the rails in position. The forecast says this week should be mostly dry, so that's good for that.

A few steps further north,
Image
They have the way prepared crossing half of Douglas St. and 10th, while the other half of Douglas remains open for two lanes for people driving to Council Bluffs. For perspective, for that shot I was in the middle of Douglas
Image
where I stood to take this shot, from safely behind the pedestrian barricades.

So that tells me they'll want to finish the line as close as they can to the 10th St. bridge before either closing Douglas off completely or directing traffic over a finished section while they connect the loop. Knowing how much traffic uses this thoroughfare, they must have a plan in place to mitigate the disruption as much as they can. Looking south...
Image

Now a couple blocks south on 10th & Harney:
Image
Now that they have the turn complete, but they have traffic open on Farnam again, one lane in each direction
Image
where you can drive across the tracks.

Image
In addition, not only are tracks put down between Harney & Farnam on 10th, but they poured concrete already, almost up to Farnam.
Image
They are closing really fast on this loop. I love it.

Then looking west on Harney St. from 10th toward 11th,
Image
they've created a little island in the middle, which is an interesting feature. The streetcar stop will be to the left, south side of Harney. I suspect the island then serves as a traffic control measure, just my guess, to keep people from merging into the streetcar's lane from the left lane to make a south turn on 10th. And that traffic will flow on both sides of the island, one side designated for right turn or straight and the other side for left turn. But you be the judge on what they've got working here.

Now to 8th St.,
Image
They have Douglas at 8th closed off finally, so they can complete that part of the loop, connecting the park to the north. And they have it dug up already. Traffic can still travel south to north on 8th, but if you used Douglas to drive to the Luminarium, that will be closed off for a while. Best bet then is to take Harney past the Drury site, turn left onto 8th and get to the Luminarium (or Creighton basketball game) that way.

Further up Harney past 13th St. toward 15th St. by Wilson & Washburn,
Image
They've got a gravel bed laid out, so tracks must be not long to follow. For a couple weeks, I think they were doing a lot of preliminary work in the ground to prepare it
Image
like for this, I think it's a subdrain maybe?
But in any case, it looks like Harney is progressing right along towards the back door of the Orpheum.

And finally,
Image
I did get a shot from Sunday of the demolition work on the old Brothers Lounge.

As for Blackstone, not much new track has been laid recently, but they are drilling the area by Sullivan's Bar at 40th.

Image
Here is a picture of the track awaiting to be continued once the afore-mentioned demolition is completed.
User avatar
skinzfan23
City Council
Posts: 11699
Joined: Mon Feb 09, 2004 5:26 pm
Location: Omaha/Bellevue

Re: Omaha Streetcar - CONSTRUCTION

Post by skinzfan23 »

stadsborgare wrote: Mon Nov 23, 2026 6:34 pm
Image
Here is a picture of the track awaiting to be continued once the afore-mentioned demolition is completed.
Thanks again for all the update photos. I know this thread is about the streetcar, but I really love the last photo you posted. Pretty neat to see all the differences in the buildings with both old and new as well as all the varying heights.